Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

50results about How to "Guaranteed pouring effect" patented technology

Prefabricated column and precast construction method thereof

The invention relates to a prefabricated column and a precast construction method. The prefabricated column comprises a lower prefabricated column and an upper prefabricated column matching the lower prefabricated column, a first vertical steel bar extending out of the upper and lower ends of the lower prefabricated column is arranged in the lower prefabricated column, the lower end of the lower prefabricated column is provided with a first connection member, the upper end of the lower prefabricated column is provided with a first steel pipe and a first flange plate welded to the top surface of the first steel pipe, a second vertical steel bar extending out of the upper and lower ends of the upper prefabricated column is arranged in the upper prefabricated column, the upper end of the upper prefabricated column is provided with a second connection member, the lower end of the upper prefabricated column is provided with a second steel pipe and a second flange plate welded to the top surface of the second steel pipe, the top of a second pre-embedded steel pipe is in a butt connection relationship with two auxiliary steel pipes, the first flange plate and the second flange plate are in a butt connection relationship by bolts, the first connection member is connected to the second connection member by threads, and the first vertical steel bar and the second vertical steel bar are bound by stirrups. The prefabricated column can be constructed simply, has a low price, and is suitable for buildings having high floor height and large column sectional area.
Owner:HUA HUI ENGINEERING DESIGN GROUP CO LTD

Method for pouring plate blank stainless steel

The invention relates to a method for pouring plate blank stainless steel, which comprises the following process steps: fixing a dummy bar head on a pouring position; filling a sealing material in a gap between a copper plate and the dummy bar head; spreading iron abrasive dust onto the dummy bar head and a dovetail groove; placing an iron sheet around a crystallizer; placing a spring on the dovetail groove; placing a layer of steel plate net on the iron abrasive dust; placing a layer of spring on the steel plate net and in a direction vertical to the copper plate; placing two layers of springs in places which are 100 meters away from the two ends; uniformly coating a reacting agent on the surface of the copper plate of the crystallizer; and pouring, namely when the pouring volume in a large ladle reaches 40 to 60 percent of the normal tonnage of an intermediate ladle, pouring in the intermediate ladle till the molten steel in the crystallizer submerges the springs, stopping pouring for 5 to 10 seconds, pouring normally till the poured material approaches a submerged water opening, stopping pouring for 5 to 10 seconds, adding pouring slag when the level of the molten liquid submerges a side hole of the submerged water opening, ensuring an emergence time is 110 to 150 seconds, and thus, finishing a pouring process.
Owner:ZHENSHI GROUP EASTERN SPECIAL STEEL

Slurry direct cyclic rotation drilling punching and slurry return device of ground source heat pump

ActiveCN106968606AGuaranteed pouring effectGuaranteed fillingDrill bitsConstructionsReturn functionDrill bit
The invention provides a slurry direct cyclic rotation drilling punching and slurry return device of a ground source heat pump. The drilling punching and slurry return device comprises a drilling punching part and a slurry return part. The drilling punching part comprises a drill bit body and a drill bit substrate. The slurry return part comprises an injecting mechanism and a discharging mechanism. The injecting mechanism comprises an injecting pipe and an injecting spray hole. The discharging mechanism comprises a discharging hole and a discharging pipe. The drilling punching and slurry return device is a combination of the drilling punching and slurry return functions, injection of clean water and slurry discharging are ensured while the drilling punching quality is ensured, slurry generated during drilling punching is effectively utilized, the drilling punching cost is effectively reduced, and the drilling punching and slurry return device is suitable for being applied and popularized.
Owner:JIANGSU SHENGSHI ELECTROMECHANICAL ENG CO LTD

Localizable casting die

The invention discloses a localizable casting die comprising a bottom plate, an upper die base and a lower die base, wherein a casting box is arranged above the bottom plate, and a lower die base plate is arranged below the inner portion of the casting box. A lower die base plate is positioned in the middle above the bottom plate, the lower die base is arranged above the lower die base plate, a positioning block is arranged at the top end above the casting box, and a plurality of props are arranged above the positioning block. An upper die base plate is arranged in the middle above the props,the upper die base plate is slidably connected above the props, and the upper die base plate is positioned between the props, and the upper die base is fixedly connected with the bottom of the upper die base plate. A fixing plate is fixedly connected with the upper end of the props, a casting pipe is arranged on the left end above the fixing plate, and the lower end of the casting pipe passes through the upper die base plate and is in communication with the lower portion of the right end of the upper die base. A casting sleeve head is arranged on the upper portion of the casting pipe. The localizable casting die is simple in structure and convenient to operate, a die can be effectively positioned, and taking off the die is easy when demolding, production efficiency is high and popularization is easy.
Owner:安徽东升精密铸钢件有限公司

Casting method of large two-plate type injection molding machine mold plate casting

ActiveCN113145797AImprove surrounding thermal conductivityEasy to adjustFoundry mouldsFoundry coresCooling effectInjection molding machine
The invention discloses a casting method of a large two-plate type injection molding machine mold plate casting. The casting method comprises the following steps that sand casting is carried out to form a casting cavity body and a pouring structure; raw materials comprise 35%-45% of pig iron, 30%-35% of scrap steel, 20%-35% of foundry returns and a carburant accounting for 0.6%-1.0% of the total amount of the pig iron, the scrap steel and the foundry returns, and the raw materials are put into a smelting furnace to be heated to melt furnace burden; spheroidizing is carried out by adopting a pouring method, then pure antimony accounting for 0.003%-0.005% of the mass of original molten iron is added, and finally an inoculant with the particle size of 3-8mm is added and compacted; the molten iron is subjected to slagging-off, inoculation blocks are placed for unstable silicon inoculation, standing is conducted, and the adding amount of the inoculation blocks accounts for 0.2%-0.4% of the mass of the molten iron; when the temperature is reduced to 1270-1360 DEG C, the molten iron is poured into the casting structure to form a casting; and after the casting is cooled, the casting of the application is obtained. The method has the advantages that according to the large two-plate type injection molding machine mold plate casting, an indirect chilling block which is convenient and accurate to position, and improves the cooling effect is contained, and the casting defects such as graphite distortion, shrinkage cavities, shrinkage porosity and sand inclusion can be reduced, so that the mechanical property of the casting is improved.
Owner:宁波拓铁机械有限公司

Highway bridge pile foundation drilling device and using method thereof

The invention provides a highway bridge pile foundation drilling device and a using method thereof. The highway bridge pile foundation drilling device comprises an excavator main body and a mechanicalarm, a main body bin is arranged at the end, away from the excavator main body, of the mechanical arm, a telescopic hydraulic cylinder A is arranged at the end, close to the main body bin, of the topof the mechanical arm, a clamping plate is arranged at the output end of the telescopic hydraulic cylinder A, and the end, close to the main body bin, of the clamping plate is fixedly connected withthe main body bin. Through cooperative use of the mechanical arm, the clamping plate, a sliding groove, a fixing screw, a buckle and a drill bit, the inclination angle of the main body bin can be freely adjusted, meanwhile, the rotating stability of the rotating rod is improved through a U-shaped support and a bearing, and the stability of the motor bin and the U-shaped support in the moving process is improved through a sliding block and the sliding groove; and the device can be adjusted to different inclination angles, so that the device can conveniently drill holes in the ground with different gradients, it is guaranteed that the holes of a pile foundation can reach the expected standard, and the quality of subsequent highway bridge construction is guaranteed.
Owner:京山俊平机电科技有限公司

A casting method for hollow turbine guide vanes

The invention provides a pouring method of a hollow turbine guide vane. The pouring method comprises the following steps: (1) manufacturing a wax mold combination; (2) carrying out shell making on the wax mold combination to obtain a hollow turbine guide vane shell; (3) covering one layer of ceramic heat-preservation cotton on a shell vane body part; covering two layers of ceramic cotton on the whole shell; and putting the treated shell into a roasting furnace and carrying out casting, wherein in a casting process, the temperature of casting the shell is 1065-1085 DEG C and the pouring temperature is 1460-1480 DEG C. According to the pouring method of the hollow turbine guide vane, a pouring system of the hollow turbine guide vane is not changed and the shell temperature and the pouring temperature are adjusted so that the casting temperature field is changed; the two layers of ceramic cotton on the whole body and one layer of the ceramic heat-preservation cotton on the vane body part are matched so that after the temperature of the whole shell is improved, the temperature field is uniform, the casting stress is eliminated and the casting temperature is reduced; and furthermore, the temperature field on a casting vane body and an edge plate keeps uniform, the shell is effectively insulated and the casting stress is eliminated.
Owner:AECC AVIATION POWER CO LTD

Steel bar positioning device for civil engineering

InactiveCN112808884AImprove initial positioning accuracyGuaranteed pouring effectWire networkBuilding material handlingRebarDouble row
The invention discloses a steel bar positioning device for civil engineering. The device comprises a bearing assembly, the left side and the right side of the upper portion of the bearing assembly are each provided with a connecting assembly, the outer sides of the connecting assemblies at the two sides are each vertically provided with an adjusting device in a connected manner, and a first side frame is installed above the outer side of the adjusting device at the left side; and a second side frame is installed above the outer side of the adjusting device at the right side, a bending device is installed in the first side frame, a cutting device is installed above the interior of the second side frame, a dust suction device used in cooperation with the cutting device is further installed below the interior of the second side frame, and the front end and the rear end of the position between the connecting assemblies at the two sides are each connected with a positioning assembly. According to the device, parallel positioning of double rows of steel bars can be conducted through the positioning assemblies at the two sides in the device, the accuracy of preliminary positioning of the steel bars is further improved, and therefore the subsequent concrete pouring effect is guaranteed; and meanwhile, the bending device and the cutting device required by steel bar construction are arranged in the device, so that the construction efficiency is further improved.
Owner:绍兴市华冠新型建材有限公司 +2

Anti-blocking equipment for machining automobile parts through pouring force

The invention relates to the technical field of automobile parts, and discloses anti-blocking equipment for machining automobile parts through pouring force, a main body is movably connected with rotating fan blades, metal blocks are fixedly installed at the upper ends and the lower ends of the rotating fan blades, and screw rods are movably installed at the ends, close to a protection frame, of the left ends of the metal blocks. According to the anti-blocking equipment for machining the automobile parts through the pouring force, when rotating fan blades push materials to an acting frame, the materials are simply protected through a protection block, a metal spring is changed into a stretching shape from a compressed shape from an initial state, it is guaranteed that the anti-blocking equipment can normally operate in a balanced mode through an outer frame, through cooperative use of the metal spring, a stabilizing block, a center rod, a sliding piece and a swing block, the anti-blocking equipment has the effect of stable operation, the situation that automatic closing cannot be achieved after pouring is guaranteed, overflow is prevented, the pouring effect is effectively guaranteed, and a large amount of time is saved.
Owner:济南钧览汽车配件有限公司

Concrete pouring method for deep foundation pit

The invention provides a concrete pouring method for a deep foundation pit. The concrete pouring method for the deep foundation pit is used for concrete pouring equipment, and the concrete pouring equipment comprises a conveying pipe. The concrete pouring method for the deep foundation pit comprises the following steps: installing a reinforcing die plate in a channel to be grouted, and dividing pouring areas according to the channel to be grouted and the reinforcing die plate; installing a plurality of conveying pipes at intervals in each pouring area in the circumferential direction of the reinforcing die plate; controlling the plurality of conveying pipes to sequentially pour concrete to form concrete layers; and pouring the concrete layers one by one until a grouting of the channel to be grouted is reached. According to the concrete pouring method for the deep foundation pit, the pouring areas are divided by installing the plurality of conveying pipes at intervals in each pouring area in the circumferential direction of the reinforcing die plate; and each area is equipped with one conveying pipe, overall and comprehensive pouring working is carried out on the pouring areas by virtue of the conveying pipes, and the use needs of different pouring spaces are met in the case of ensuring a pouring effect, so that continuous and cyclic concrete pouring working the circumferentialdirection of the reinforcing die plate is realized, and then the concrete pouring quality can be ensured.
Owner:CHINA RAILWAY CONSTR HEAVY IND

Method for reducing steel leakage in Q195 refining production process

InactiveCN110184417AReduce breakoutsImprove puritySteelmakingPre treatment
The invention relates to the technical field of steelmaking processes, and discloses a method for reducing steel leakage in a Q195 refining production process. The method comprises the following steps: (1) firstly, matching scrap steel for melting according to the specific conditions of semisteel or molten iron, and keeping the temperature at a temperature of 1585 DEG C to 160 DEG C in a molten steel ladle; and (2) controlling the content of various mineral elements in the molten steel through molten steel pretreatment. According to the method for reducing steel leakage in the Q195 refining production process, mineral elements in the molten steel are controlled through molten steel pretreatment, so that various components in the Q195 are greatly different from peritectic steel, a large amount of aluminum oxide inclusions in the Q195 are discharged through deoxidation and argon blowing processes, and the aluminum oxide inclusions are prevented from separating out in the casting process,and aluminum oxide in the molten steel is further removed in a calcium iron wire feeding mode, so that the purity of the molten steel is improved, and the purity of the produced Q195 is higher.
Owner:CHENGYU VANADIUM TITANIUM TECH CO LTD

Filling box, filling box preparation device and method

PendingCN109049319AEnsure internal and external ventilationAvoid enteringFloorsSurface layering apparatusEngineeringMechanical engineering
The invention belongs to the technical field of box bodies, and discloses a filling box, a filling box preparation device and method. The filling box is mainly and technically characterized by including a box body composed of a front face plate body, a rear face plate body, a left face plate body, a right face plate body, a top face plate body and a bottom face plate body, the middles of the frontface plate body, the rear face plate body, the left face plate body, the right face plate body, the top face plate body and the bottom face plate body are magnesite cement layers or silicate cement layers or foaming cement layers, the inner sides and the outer sides of the front face plate body, the rear face plate body, the left face plate body, the right face plate body, the top face plate bodyand the bottom face plate body are provided with grid cloth layers correspondingly, the top face plate body or the bottom face plate body is provided with an air hole, a metal mesh sheet is arrangedat the air hole, every adjacent plates are bonded by adhesive layers or connected by shooting nails, the joints of side plate bodies are provided with angle beads correspondingly, the box body is internally provided with a supporting plate. According to the filling box, the pouring effect is good, space occupation for transportation and storage is small, and the transportation cost is low.
Owner:朱琦

Integrated crushing and stirring device

The utility model discloses an integrated crushing and stirring device which comprises a mounting seat, one side of the mounting seat is slidably connected with a lifting frame, a first telescopic rod is connected between the lifting frame and the mounting seat, the lifting frame is rotatably connected with a crusher, the exterior of the crusher is connected with a first driving device, and a stirring barrel is arranged on the mounting seat below the crusher. A main stirring shaft is rotatably connected to the middle of the stirring barrel, main stirring blades located in the stirring barrel are arranged in the middle of the main stirring shaft, the two ends of the main stirring shaft extend out of the stirring barrel and are rotatably connected with the mounting base, a second driving device is connected to the outside of the main stirring shaft, and a second telescopic rod is connected to the outer wall of the stirring barrel away from one side of the main stirring shaft; the end of the second telescopic rod is connected with the mounting base. According to the BMC material crushing and stirring device, BMC materials can be crushed and stirred, and the workload of operators is reduced.
Owner:HUZHOU NANXUN WEIKANG MECHANICAL & ELECTRICAL CO LTD

Conical shell type water tower cast-in-situ supporting structure

The invention relates to a cast-in-place supporting structure of a conical shell water tower, which includes a support tube, steel bars, ring supports, hangers, suspensions, supporting steel beams, derricks, water tank templates, and ring plates; the ring support and the top of the support tube pass through The steel bar is fixed, the section of the ring support is inverted L-shaped, the ring plate is fixed on the support tube under the ring support, the ring support and the ring plate are fixed and supported by reinforcing ribs, the hanger and the top of the ring support are welded and fixed, and the suspension It is fixedly connected with the hanger; the support steel beam is fixed to the inner wall of the support tube, the bottom of the support steel beam is supported and fixed by a reinforcing plate, and the bottom of the derrick is fixed to the support steel beam; the support tube includes an inner steel tube, an outer sleeve, a rib plate, and Ribs, welded ribs are uniformly distributed radially on the outside of the inner steel cylinder; the outer sleeve is assembled longitudinally and layered by a circular steel structure, and the circular steel structure is spliced ​​by several arc-shaped plates. The advantages are: it can realize the in-situ concrete pouring operation of the water tank, reduce the danger of high-altitude operation, shorten the construction period and reduce the cost.
Owner:CHINA THIRD METALLURGICAL GRP

Continuous casting tundish protecting technology

The invention discloses a continuous casting tundish protecting technology and relates to the field of steelmaking technologies. The continuous casting tundish protecting technology comprises the following steps that a, a tundish is baked at a baking position and moved to a pouring position after being baked; b, a protecting sleeve immersed into molten steel in a crystallizer is mounted at a tundish sliding water gap in the lower end of the tundish; c, the molten steel is poured into the tundish through a ladle; and d, the molten steel in the tundish is poured into the crystallizer by the protecting sleeve. The protecting sleeve is replaced on time, when the protecting sleeve is replaced, the liquid level of the molten steel in the crystallizer is lowered through manual operation of a casting speed disc, and after the protecting sleeve is replaced, the liquid level of the molten steel in the crystallizer is heightened through manual operation of the casting speed disc. According to thecontinuous casting tundish protecting technology, the protecting sleeve is replaced in time, so that the phenomena of damage to the protecting sleeve and fracturing or falling blocks of the protecting sleeve due to long-time high-temperature pouring are avoided, the situation that the falling blocks and the like at the protecting sleeve fall into the crystallizer is avoided, and slag inclusion ina continuous cast billet in the continuous casting tundish protecting technological process is avoided.
Owner:XINXING DUCTILE IRON PIPES CO LTD

Flat plastic formwork for construction

The invention provides a plastic formwork for a building slab. The plastic formwork comprises a front plate and a frame, wherein the frame is vertical to the surface of the front plate; a plurality of connecting holes for connecting with other formworks are formed in the frame; a ribbed plate vertical to the surface of the front plate is arranged on the back of the front plate; the ribbed plate comprises a main ribbed plate and a secondary ribbed plate; the back of the front plate is divided into a plurality of rectangular partitioning areas, which are arranged longitudinally and transversely, by the main ribbed plate; the back of the front plate in the rectangular partitioning areas is partitioned into a plurality of longitudinal and transverse square blocks by the secondary ribbed plate in the rectangular partitioning area; plug-in type protective corners are respectively installed at four corners of the front plate. The plastic formwork overcomes the disadvantage that the whole plastic formwork is scraped because of the damage of the corners; the breaking rate of the plastic formwork for the slab is reduced; advantages of high-molecular material can be utilized and disadvantages are overcome; a plate design effectively matches with a support and reinforcing system, thus a scientific and effective formwork engineering system is finished.
Owner:河北润林新材料科技有限公司

Shallow-buried excavation large-section subway station supporting device and using method

The shallow-buried excavation large-section subway station supporting device comprises an anchoring head, a grouting pipe, a plurality of bearing plates, a plurality of anchor cables and a tensioning disc, the anchoring head is used for being buried and fixed in an anchor hole, a grouting cavity is formed in the anchoring head, the anchoring head is provided with a plurality of grouting holes, the grouting holes penetrate through the anchoring head in the thickness direction, and the bearing plates are arranged on the bearing plates. The grouting cavity is communicated with the anchor hole; one end of the grouting pipe is communicated with the grouting cavity, and the other end is positioned at the orifice of the anchor hole; all the bearing plates are coaxially arranged on the grouting pipe in a sleeving mode at intervals, and the bearing plate closest to the anchoring head is fixedly connected with the anchoring head; every two adjacent bearing plates are connected through a plurality of anchor cables, and the ends, away from the anchoring heads, of the anchor cables extend out of the anchor holes; the tensioning disc is arranged at the hole opening of the anchor hole and connected with all the anchor cables, the diameter of the tensioning disc is larger than the hole diameter of the hole opening of the anchor hole, and the tensioning disc is used for tensioning all the anchor cables. The problem that an existing support is not ideal in effect when coping with super-large sections and complex geological conditions can be effectively solved.
Owner:SINOHYDRO BUREAU 5

Steel structure transfer layer supporting structure

The utility model relates to a steel structure transfer layer supporting structure which comprises a vertically-arranged first frame column and a second frame column obliquely arranged on the side face of the first frame column, and a third frame column is arranged above the first frame column and the second frame column. The interior of the third frame column is communicated with the interiors of the first frame column and the second frame column, concrete is poured into the third frame column, lower-layer structural beams are arranged on the side faces of the first frame column and the second frame column, and upper-layer structural beams are arranged on the side face of the third frame column. The second frame column is obliquely arranged on the side face of the first frame column, the third frame column is arranged above the first frame column and the second frame column, the lower portion of the third frame column is connected with the upper end of the first frame column and the upper end of the second frame column through concrete pouring, and construction is convenient while the strength is guaranteed; the lower-layer structural beams are arranged on the side faces of the first frame column and the second frame column, and the upper-layer structural beams are arranged on the third frame column, so that the shelf boards are conveniently connected and fixed.
Owner:NINGBO KEEN DA MECHANICAL & ELECTRICAL CO LTD

Supporting system for post-cast strip

The invention provides a supporting system for a post-cast strip. The supporting system comprises two independent supporting units, a post-cast strip supporting mechanism and two beam plate supporting units. The two independent supporting units are arranged on the two sides of the post-cast strip correspondingly. Each independent supporting unit comprises a first supporting truss and a plurality of first formworks. The post-cast strip supporting mechanism comprises a plurality of supporting assemblies and a plurality of auxiliary formworks. Each supporting assembly can be overturned upwards to be horizontally arranged on the corresponding auxiliary formwork, and after the two ends of each supporting assembly are in butt joint with the first formworks in the two independent supporting units correspondingly, the supporting assembly is horizontally rotated to the position below the corresponding auxiliary formwork so as to support the auxiliary formwork in the vertical direction. The two beam plate supporting units are used for beam plate pouring forming of the post-cast strip along the two sides in the second direction. According to the supporting system for the post-cast strip, through cooperation of the multiple auxiliary formworks and the supporting assemblies, rapid dismounting and mounting of supports at the position of the post-cast strip can be guaranteed, the construction efficiency is improved, and practicability is high.
Owner:CHINA CONSTR SEVENTH ENG DIVISION CORP LTD

Outer windowsill concrete structure tongue-and-groove forming shaping mold

The utility model relates to the field of windowsill tongue-and-groove templates, in particular to an outer windowsill concrete structure tongue-and-groove forming shaping mold, which comprises an inner mold, an outer mold and an outer mold, the inner mold comprises an inner flat plate, a shaping plate is arranged on one side of the inner flat plate, the shaping plate is connected with an outer clamping plate through a connecting frame, and an inner clamping plate is further arranged on the other side of the inner flat plate; the connecting frame is fixedly arranged between the shaping plate and the outer clamping plate; the two shaping assemblies are arranged on the back parts of the inner mold and the shaping plate respectively; the guide assembly is arranged between the two shaping assemblies and is matched with the pouring hopper; according to the outer windowsill concrete structure tongue-and-groove forming shaping mold, under the action of the filling mechanism, a windowsill can be positioned, filling operation is facilitated, concrete can be added to different areas on the windowsill, and slurry is gradually added after a module is installed; the problems that a traditional formwork concrete material is inconvenient to add, and the appearance effect of a finished product is poor are solved.
Owner:SHAANXI CONSTR ENG GRP CO LTD THE FIRST BUILDING

A hydraulic walking drag mold

The present invention relates to the field of construction equipment, and specifically to a hydraulic walking drag formwork, comprising an aisle frame, blocking beams are arranged at both ends of the aisle frame, second lifting devices are installed at the right ends of the two blocking beams, driving walkers are installed at the lower ends of the movable parts of the two second lifting devices, a first auxiliary member and a first driving member are installed on the aisle frame, second driving members are installed at the outer ends of the two blocking beams, two cross plates are symmetrically installed between the two second driving members, two fixed plates are symmetrically installed between the two cross plates, a third driving member is arranged at the rear end of the fixed plate located on the rear side, a bidirectional screw rod is rotatably connected between the two fixed plates, and the bidirectional screw rod is connected to the third driving member. This design realizes walking movement, effectively assists continuous casting operations, effectively reduces working time and processes, and performs hydraulic restricted stop, effectively reduces the probability of shaking during the casting process, and has high stability and safety.
Owner:FUJIAN RUIYI MACHINERY MFG

A corner aluminum formwork

The application relates to a corner aluminum template, which relates to the technical field of aluminum alloy templates. It includes a connector, an inner formwork member and an outer formwork member, the inner formwork member and the outer formwork member are connected through a connector; the inner formwork member includes a first inner formwork, a second inner formwork, a connecting column and a positioning piece, the first inner formwork, There are at least two positioning pieces on the side wall of the second inner formwork near the connecting column. The first inner formwork and the second inner formwork are connected to the connecting column through the positioning pieces. The first inner formwork and the second inner formwork are perpendicular to each other, and the corners of the connecting columns close to the side of the outer formwork member are right angles; the outer formwork includes a first outer formwork and a second outer formwork perpendicular to each other, and a dovetail groove is arranged on the side wall of the first outer formwork close to the second outer formwork, A clamping block is provided on the side wall of the second outer template close to the first outer template, and the clamping block is clamped in the dovetail groove. The application has the effects of reducing deformation and ensuring concrete pouring effect.
Owner:陕西创宜建筑科技有限公司

Mold and casting method of vertical shaft planetary concrete mixer scraper knife

The invention discloses a mold and a casting method of a vertical shaft planetary concrete mixer scraper knife, and belongs to the field of casting machining. According to the mold and the casting method, a reasonable mold design is adopted, so that the scraper knife with a larger size and a more complicated structure can be suitable for the molding production of the disa line. The invention further provides a casting method using the disa line mold. In order to solve the problems that in the prior art, common sand mold casting, lost foam casting and sand-coated shell mold casting quality and production batch are difficult to meet requirements, the rejection rate is high, and the production cost is high, the scraper knife produced through casting has the advantages of being high in size precision, high in surface smoothness, high in production efficiency, stable in quality, low in molding sand consumption, low in production cost and the like, and important significance is achieved for casting production of the scraper knife.
Owner:MAANSHAN HUADA METALLURGICAL & MACHINERY

Fabricated formwork for constructional engineering

The utility model discloses a constructional engineering assembly type formwork, relates to the field of building formworks, and comprises four formwork pieces, the four formwork pieces are mutually clamped end to end in a rectangular shape, the outer sides of the four formwork pieces are all provided with fixing grooves, the outer sides of the formwork pieces are movably provided with fixing assemblies, and the fixing assemblies are fixedly connected with the formwork pieces. The fixing assembly is movably clamped in the fixing groove, and a supporting assembly is fixedly installed on the lower portion of the outer side of the formwork piece. According to the utility model, after the template pieces are encircled, the fixing assemblies are arranged on the outer sides of the template pieces, so that the fixing assemblies are clamped in the fixing grooves and are tightened along with the fixing assemblies to clamp the template pieces on the front side and the rear side towards the inner side, and the template pieces on the left side and the right side are propped against the inner side through the fixing assemblies, so that the assembly of the template pieces is completed; and meanwhile, connection is tight, concrete seepage is prevented, and the pouring effect is guaranteed.
Owner:邵玉莹

Construction method of water collection well for ballastless track railway subgrade

The present invention relates to railway engineering, in particular to a construction method for a ballastless track railway subgrade water collection well, comprising the following steps: filling the subgrade structure, burying horizontal drainage pipes; filling and compacting the remaining part of the subgrade structure, and placing The medium-coarse sand filling body is filled synchronously at the predetermined position, and the inner end of the lateral drainage pipe is located in the medium-coarse sand filling body, and the cross-sectional size of the medium-coarse sand filling body is larger than the predetermined cross-sectional size of the water collection well; the medium-coarse sand filling body is excavated Fill the body until the elevation of the horizontal drainage pipe; carry out the construction of the water collection well to connect the horizontal drainage pipe and the water collection well; pour the gap between the water collection well and the subgrade structure to close the gap. The construction method of the ballastless track railway subgrade water collection well of the present invention has simple construction and high efficiency, and the part of the subgrade structure adjacent to the prefabricated water collection well has good compaction effect, and the quality of the filling body can be guaranteed.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD

Frame for cast-in-place of fabricated energy-saving building

The utility model relates to the technical field of assembly type buildings, and discloses an assembly type energy-saving building cast-in-place frame which comprises a first side plate and a second side plate, the first side plate and the second side plate are mutually clamped, a reinforcing assembly is arranged on the outer side of the first side plate, notches are formed in the two ends of the second side plate respectively, and a sealing assembly is arranged at the clamping position of the first side plate and the second side plate. The sealing assembly comprises a sealing strip arranged at the joint of the first side plate and the second side plate, an arc face is arranged on the outer side of the sealing strip, a fixing plate is fixedly connected to one side of the sealing strip and inserted into the notch, a threaded hole is formed in the sealing strip, a threaded rod is arranged in the first side plate and matched with the threaded hole, and the sealing strip is fixedly connected with the second side plate. The cast-in-place frame is formed through cooperation of the first side plate and the second side plate, the clamping position of the first side plate and the second side plate is sealed through the sealing assembly, leakage is avoided, the whole frame is supported through the reinforcing assembly, scattering during cast-in-place of the frame is avoided, and the problem that an existing cast-in-place frame for the fabricated building is poor in sealing performance is solved.
Owner:DANYANG LEGONG STEEL STRUCTURE CO LTD