The invention relates to a method for solving
water seepage of a
thermocouple intubation tube of a
continuous casting crystallizer, which specifically comprises the following steps of: 1,
cutting the end part of the
intubation tube into a boss shape by using a
machine tool, 2, manufacturing an annular sealing
gasket by using rubber, and 3, sleeving the boss of the
intubation tube with the annular sealing
gasket manufactured in the step 2, and then inserting the annular sealing
gasket into a back plate of the crystallizer, 4, after the step 3 is completed, the
insertion depth of the
insertion pipe is adjusted, and the sealing performance is guaranteed, 5, after the step 4 is completed, a
hydrostatic test is conducted on the crystallizer, under the specified test time and test pressure, if
water seepage does not occur, the sealing performance is good, and if
water seepage occurs, the water seepage does not occur. And 6, the crystallizer which is tested to be qualified in the step 5 is sent to the next procedure, and a
thermocouple is installed. According to the technical scheme, the sealing structure at the end part of the
thermocouple insertion tube is improved, so that the purpose of high sealing performance is achieved.