The invention discloses a wall template split bolt construction method. According to the method, two parallel templates are arranged in the position of a wall to be poured, the templates are penetrated by sleeves, a plurality of clamps are installed above the templates in a suspension mode, fixing bolts of the clamps are connected through fixing rods, and the fixing bolts are screwed through fixing nuts to fix the fixing rods; the templates and the clamps are penetrated by rebars, so that the rebars pass through the sleeve; a plurality of sealing spacers are arranged at the two ends of each
rebar, and sealing nuts are arranged on the outer portions of the sealing spacers; the tops of adjacent angle steel pipes are arranged in the two sides of each connecting rod in a sleeved mode and sleeved with limiting blocks, the connecting rods are fixed by the limiting blocks, and a sealing steel board connected with each angle steel
pipe is arranged on the bottom of the corresponding angle steel
pipe, so that the sealing steel boards are connected with the bottoms the templates, and the angle steel pipes are connected with the rebars;
reinforced concrete is poured into the gaps between the clamps; the sealing steel boards, the limiting blocks, the connecting rods, the angle steel pipes, the sealing nuts, the sealing spacers, the rebars, the fixing nuts, the fixing rods, the clamps and the templates are dismantled; the portions, exposed on the two sides of the wall, of the sleeves are
cut, and sealing cover boards are connected with the two sides of the sleeve in a welded mode.