The invention provides a heavy draught seaborne
floating wind turbine integral installation work ship. A wind
turbine comprises a
tower drum and a heavy draught seaborne floating foundation provided with a hard cabin and a soft cabin. the installation work ship comprises a work ship, a truss, multiple bearing piers, a dumping
winch, a dumping steel
wire rope, a lifting
pulley block, a dumping
pulley block, two lifting winches, two lifting steel wire ropes and a dumping rotating shaft, wherein the truss, the dumping
winch and the bearing piers are arranged on a main
deck; two ends of the dumping steel
wire rope are respectively connected with the
tower drum and the dumping
winch; the lifting
pulley block is arranged on a shell of the hard cabin; the dumping pulley block is arranged on the upper part of the heavy draught seaborne floating foundation; two ends of one lifting steel
wire rope are respectively connected with the lifting pulley block and the lifting winch arranged on the middle of the truss, and two ends of the other lifting steel wire
rope are respectively connected with the dumping pulley block and the lifting winch arranged on the top of the truss; the soft cabin is hinged to a slot in the
tail part of the work ship through a soft cabin pin shaft hole and the dumping rotating shaft. The heavy draught seaborne
floating wind turbine integral installation work ship has dual functions of transportation and installation, saves
operation time, reduces the cost, and is suitable for construction of a large-scale seaborne
floating wind turbine plant.