Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

67 results about "Loop scheduling" patented technology

In parallel computing, loop scheduling is the problem of assigning proper iterations of parallelizable loops among n processors to achieve load balancing and maintain data locality with minimum dispatch overhead.

Multi-modal data fusion method and system based on energy scheduling and storage medium

The invention relates to the technical field of energy scheduling, in particular to a multi-modal data fusion method and system based on energy scheduling and a storage medium. The method comprises the following steps: obtaining multi-modal data, and carrying out abnormal fluctuation feature extraction to obtain a space-time fusion abnormal feature labeling set; deducing a multi-objective optimization path according to the space-time fusion abnormal feature labeling set to obtain a dynamic scheduling decision map; performing edge node game equilibrium calculation according to the dynamic scheduling decision map to obtain a trusted scheduling verification chain; performing digital twinborn constraint optimization on the trusted scheduling verification chain to obtain a closed-loop scheduling digital twinborn body; compiling a dynamic scheduling instruction set based on the closed-loop scheduling digital twin to obtain an anti-disturbance energy scheduling strategy library; and obtaining real-time energy supply and demand data, and performing scheduling deviation tracing on the real-time energy supply and demand data according to the anti-disturbance energy scheduling strategy library to obtain an energy distribution decision. According to the invention, the efficiency and reliability of energy scheduling can be improved.
Owner:WUXI YUNSONG INFORMATION TECH CO LTD

Production process state monitoring scheduling optimization method based on real-time data acquisition

The invention discloses a production process state monitoring scheduling optimization method based on real-time data acquisition, relates to the technical field of manufacturing process scheduling, and is used for solving the problem of insufficient real-time performance and stability of process scheduling. According to the method, a process monitoring mechanism based on real-time acquisition and closed-loop scheduling is constructed, a time sequence structured data frame is formed under a unified time reference, operation stability and quality offset characteristics are extracted, a data credible label and a current process state factor vector are generated, an optimized scheduling model is input, and task conflicts and resource bottlenecks are identified according to the data credible label and the current process state factor vector. According to the method, path compression and sequence adjustment are implemented in combination with scheduling priority mapping and a resource path diagram, scheduling deviation vectors are constructed through task response time delay and process blocking in operation, rules and parameters are triggered to be updated online and locally rearranged, and solidification is performed after verification in a prediction window, so that equipment idling and switching fragmentization in the production process are reduced, and the production efficiency is improved. And the real-time performance of the production process, the resource utilization rate and the system stability are improved.
Owner:ANHUI JINSHENG INFORMATION TECHNOLOGY CO LTD

Intelligent storage multi-AGV scheduling method and system

The invention discloses an intelligent storage multi-AGV scheduling method and system, and relates to the technical field of storage scheduling. A graph optimization algorithm is combined with a multi-target scheduling tradeoff factor model to solve a task path, output a task allocation and path planning scheme, load the task allocation and path planning scheme to a time axis, and perform time sequence simulation on the path; potential congestion points or resource conflict areas in the paths are identified, part of AGV paths are optimized according to identification results, time passing pressure indexes and actual AGV operation states are used as input, scheduling verification is performed through multi-round offline simulation, a multi-AGV scheduling holographic data set is integrated, and a task state driven multi-AGV closed-loop scheduling scheme is constructed. According to the scheduling method, a multi-dimensional scheduling model fusing tasks, paths and resource information is constructed, and graph optimization, dynamic simulation and closed-loop control are combined, so that efficient collaboration and real-time response of multiple AGV systems are realized.
Owner:INSPUR SMART SUPPLY CHAIN TECH (SHANDONG) CO LTD

Government affair collaborative emergency resource dynamic scheduling method and system

The invention relates to the technical field of resource scheduling, and particularly discloses a government affair collaborative emergency resource dynamic scheduling method and system.The method comprises the steps that event spatio-temporal information is obtained through a government affair data sharing platform, multi-source data are fused to construct a three-dimensional situation map, and a dynamic demand list is generated; positioning distributed resource nodes and establishing supply capability portraits; constructing an optimization model with response time efficiency, resource utilization efficiency and demand satisfaction balance degree as targets, and generating a multi-target scheduling scheme set by adopting a particle swarm algorithm; generating a visual decision billboard based on the scheme set, determining a final scheme through multi-party collaborative consultation, and analyzing the final scheme into an operable instruction; monitoring an instruction execution state and a resource track in real time, and automatically triggering scheme re-optimization when deviation or situation change occurs to form a closed-loop scheduling system; according to the invention, the method achieves the precise, intelligent and adaptive dynamic adjustment of resource scheduling, and improves the efficiency and robustness of emergency response.
Owner:江西省政务信息中心

Dynamic scheduling method for intelligent manufacturing system

The invention discloses a dynamic scheduling method for an intelligent manufacturing system, and particularly relates to the technical field of intelligent scheduling. Through a scheduling performance evaluation mechanism fusing a task switching interference index and a target function offset index, a polynomial regression model is utilized to realize scheduling health score prediction, and scheduling performance abnormity is accurately identified; under the abnormal condition, the system can dynamically adjust and dispatch a target function structure and algorithm disturbance parameters according to different index sources, the capability of jumping out of local optimum is effectively enhanced, and the global optimization effect is improved; through a closed-loop scheduling execution and feedback mechanism, the robustness, the self-adaptability and the execution feasibility of the scheduling system are remarkably improved, it is guaranteed that high-quality tasks are completed in time, and the overall production efficiency is improved.
Owner:LAIWU VOCATIONAL & TECHNICAL COLLEGE

Timed task dynamic management system based on event driving

The invention provides a timed task dynamic management system based on event driving, and belongs to the field of Internet and information system.The method includes the steps that an external event is captured in real time through an event monitor, and a task request is generated; based on system load data of the resource manager, the dynamic scheduler calculates a task execution priority and a time window; the task executor executes the task according to the dependency graph and the fragmentation strategy, and feeds back the state to the monitoring module; and triggering a new event according to a task execution result to form closed-loop scheduling. The manual configuration cost is reduced, and task congestion is avoided.
Owner:INSPUR ZHUOSHU BIG DATA IND DEV CO LTD

Digital intelligent non-accompanying service management scheduling system

The invention relates to the technical field of resource scheduling, in particular to a digital-intelligent non-accompanying service management scheduling system, which comprises a service baseline construction module for instantiating a service item into a standard plan event flow; the state portrait generation module is used for collecting service object data flow, establishing a dynamic time sequence signal by applying a recurrent neural network model, and quantifying the occurrence probability of a future abnormal event through multi-step prediction; when the triggering is abnormal, executing causal two-way collision positioning reasons by applying the knowledge graph; the task load calculation module is used for integrating the plan event flow into a plan task component, and generating a worker resource list in combination with the predictive risk score and the worker real-time load and space reachability analysis containing the fatigue index; the system further comprises a task distribution module, the optimal staff is determined and a closed-loop scheduling instruction is generated by minimizing a composite cost function containing predictive load cost, and digital intelligent unattended service management from prediction to scheduling is realized.
Owner:NANJING TIANYI SMART ELDERLY CARE SERVICE CO LTD

Intelligent production scheduling management system for hardware mold

The invention discloses an intelligent production scheduling management system for a hardware mold, relates to the technical field of intelligent manufacturing control, and is used for solving the problem of slow scheduling reconstruction under disturbance. According to the method, rapid response and local adjustment of resource disturbance events such as equipment faults and personnel absence are realized by constructing a disturbance identification and scheduling reconstruction mechanism, the system acquires equipment utilization and scheduling information, generates a joint time sequence, calculates a disturbance sensitivity index and constructs a task resource influence map, and the task resource influence map is subjected to resource scheduling. Positioning a disturbed task and a critical path; a scheduling adjustment strategy in a minimum disturbance range is generated in combination with task priority factors, equipment load balance coefficients and scheduling cost, scheduling confusion caused by global rearrangement is avoided, a system is linked with mold allocation and task queue control, a closed-loop scheduling execution process is formed, and the scheduling efficiency is improved. And the production scheduling stability, the self-adaptive capability and the task completion efficiency can be improved in a complex manufacturing scene.
Owner:DONGGUAN ZHUXUN PRECISION HARDWARE CO LTD

Deep mine disaster big data analysis and prevention and control decision system

The invention relates to the technical field of mine disaster monitoring and prevention and control, in particular to a deep mine disaster big data analysis and prevention and control decision-making system. Comprising a data pollution quantification unit used for collecting a multi-source heterogeneous data stream and reference prediction data and carrying out noise pollution quantitative analysis to obtain a data pollution index; the toughness entropy evaluation unit is used for collecting physical risk factors, resolving the basic safety entropy, correcting the basic safety entropy according to the data pollution index to obtain the toughness entropy of the mine system, and judging the toughness entropy of the mine system to obtain a risk level; the anti-fragility decision-making unit is used for dynamically adjusting a risk aversion coefficient according to the risk level, and performing utility function solution on a preset decision to be selected to obtain an optimal decision; and the closed-loop scheduling control unit is used for matching a preset scheduling instruction set according to the optimal decision and the risk level, and generating and executing a hierarchical control instruction. The problem that a traditional risk assessment model fails due to serious pollution of deep mine monitoring data is solved.
Owner:SHAANXI JINYUAN ZHAOXIAN MINING CO LTD

Dynamic rule engine and state tracking service request automatic scheduling processing system

The invention relates to the technical field of service scheduling, and discloses a dynamic rule engine and state tracking service request automatic scheduling processing system. According to the system, scheduling is realized through a five-stage processing chain of request intake, state acquisition, rule fusion, decision generation and execution monitoring which are connected in sequence. The request intake stage captures a service request stream and generates a request feature topology; in the state acquisition stage, resource operation data is acquired in real time, and a state multi-dimensional map is constructed; in the rule fusion stage, time-space alignment is carried out on the two, and scheduling fitness is output through rule reasoning; in the decision generation stage, based on the scheduling fitness, a search algorithm is adopted to generate a scheduling command sequence; and tracking an execution result in the execution monitoring stage, calculating a scheduling deviation value and feeding back the scheduling deviation value to the request intake stage, and adjusting a feature topology generation parameter. According to the system, a closed-loop scheduling mechanism is formed, the dynamic adaptation of the service request and the resource state is realized, and the flexibility and pertinence of scheduling processing are improved.
Owner:SHANGHAI QINUO SOFTWARE TECH CO LTD +1

Sorting center intelligent management method and system based on cloud platform

The invention relates to the technical field of logistics automation and information processing, and discloses a sorting center intelligent management method and system based on a cloud platform. The method comprises the following steps: acquiring an image and input information of an abnormal package, and extracting a preliminary attribute; if the preliminary attribute is incomplete, analyzing the high-definition image, calculating a damage index and generating a repair queue; according to the repair queue, matching from a historical feature library to obtain inferred physical attributes; the input information is analyzed, all known attributes are synthesized, and a final destination is determined; generating an initial path according to the final destination and the real-time working condition; the preliminary path is optimized by fusing historical congestion records; and carrying out load balancing based on the optimized path, generating a final allocation scheme, and issuing and executing. According to the method, a complete process from multi-dimensional information intelligent completion to dynamic closed-loop scheduling is constructed, so that the technical problem of low abnormal package processing efficiency in the prior art is solved.
Owner:SHENZHEN AIBO GREEN ENVIRONMENTAL TECH CO LTD

Computing power resource scheduling method and device for robot cluster and computer equipment

The invention provides a computing power resource scheduling method and device for a robot cluster and computer equipment, and relates to the field of computers and robots, in particular to the fields of intelligent robots, robot systems, edge computing, computing power distribution and scheduling and the like. Providing the state awareness information to a state and computing power mapper to determine a computing power resource scheduling request; based on the computing power resource scheduling request, determining a target computing power unit which can meet the computing power resource scheduling request and a target constraint condition from a global resource pool; based on a preset path decision-making mechanism, determining a target path for applying the target computing power unit to the robot; and the target computing power unit is applied to the robot based on the determined target path, so that end-side computing power real-time sensing and closed-loop scheduling facing the dynamic physical task can be realized, and the flexibility and efficiency of computing power resource scheduling in a robot cluster scene are greatly improved.
Owner:VASTAI TECH (SHANGHAI) INC

Urban road intelligent drainage scheduling system and method based on Internet of Things

The invention discloses an urban road intelligent drainage scheduling system and method based on the Internet of Things. The method comprises the following steps that an urban road drainage Internet of Things sensing network is constructed, and a multi-source heterogeneous data set corresponding to an urban road target area is collected; performing space-time alignment and noise filtration processing on the multi-source heterogeneous data set, and meanwhile, performing ponding increase rate and pipe network pressure bearing evaluation to obtain urban ponding increase rates and drainage pipe network pressure bearing degrees corresponding to different urban road subnetworks; calculating drainage pipe network negative pressure indexes corresponding to the different urban road section sub-networks according to the urban water accumulation increasing rates and the drainage pipe network pressure bearing degrees corresponding to the different urban road section sub-networks; and acquiring an urban road network topological structure, performing drainage hierarchical scheduling processing, issuing the urban road network topological structure to drainage facilities in corresponding areas to execute drainage scheduling and feed back scheduled drainage effect data, and re-executing closed-loop scheduling if the drainage effect data is not accordant with the drainage effect data. According to the invention, accurate drainage scheduling of the urban road area can be realized.
Owner:GUANGDONG MEIJING LANDSCAPE CONSTR

Idle time computing power resource dynamic scheduling method based on node allocation

The invention discloses an idle computing power resource dynamic scheduling method based on node allocation, and relates to the technical field of node allocation. Sequentially executing to-be-scheduled calculation tasks to perform lightweight simulation execution to generate task feature vectors, collecting idle node hardware architecture feature data to generate node hardware feature tags, calculating a matching degree based on a bidirectional adaptability evaluation matrix, allocating main execution nodes, and performing task scheduling; the redundancy is determined by combining the task key level and the overall reputation score of the node pool, the standby redundant nodes are allocated for parallel execution, and the closed-loop scheduling process of the consensus verification window period and the arbitration mechanism is synchronously set, so that compared with the prior art, the accuracy of idle-time computing power scheduling and the credibility of an execution result can be improved, and the scheduling efficiency is improved. Therefore, the problems of low resource utilization rate and high error rate of calculation results caused by disjunction of task and node adaptation and lack of effective verification in the execution process in the existing idle computing power scheduling can be solved.
Owner:ZHONGKE XINKONG (BEIJING) TECH CO LTD

Computing network integration intelligent scheduling method and system based on 5G lightweight core network

The invention is suitable for the technical field of communication, and provides a 5G lightweight core network-based computing network integration intelligent scheduling method, which comprises the following steps of: analyzing a computing task and a resource demand vector thereof by acquiring a task demand, computing power and a network resource state, further matching the demand with the resource state, and applying an improved particle swarm optimization or convex optimization algorithm and the like to obtain a computing network integration intelligent scheduling result. Generating an optimal task scheduling strategy, determining a mapping relation between the task and a computing power node and a network path, distributing the task to an edge node for execution according to the strategy, guaranteeing the data transmission efficiency through a UPF local shunting technology, and finally updating a global scheduling model through federal learning iteration based on a task execution result. And a closed-loop scheduling system with continuous optimization capability is formed. Unified management and integrated operation of computing power and network resources are realized, and through a lightweight core network and an intelligent scheduling algorithm, the task time delay is remarkably reduced, and the resource utilization rate is improved.
Owner:NANJING UNIV OF INFORMATION SCI & TECH +1

Terahertz communication sensing and calculating integrated system and method thereof

The invention provides a terahertz communication sensing and computing integrated system based on hierarchical resource scheduling and mixed waveforms. The system comprises a unified radio frequency front end which adopts a high-integration-level terahertz phased array chip and supports ultra-large bandwidth transmission and flexible multi-beam forming; the baseband processing unit (BBU) is used for realizing real-time processing and large-scale parallel computing of signals; the OCSE waveform generation module is used for generating an ''orthogonal traffic signal-perception embedded (OCSE)'' waveform; the parallel receiver processing module comprises a communication demodulation path and a sensing parameter extraction path which are arranged in parallel; and the three-layer intelligent resource scheduler constructs an application-function-physics three-layer closed-loop scheduling model based on a deep reinforcement learning (DRL) algorithm, and is used for dynamically adjusting the distribution proportion of physical resources between communication and sensing functions according to an upper-layer application real-time task demand and a bottom-layer physical environment sensing result so as to maximize the comprehensive efficiency of the system.
Owner:WANWEI PERCEPTION (NINGBO) ELECTRONICS CO LTD

Computing power resource scheduling method and device for robot cluster and computer equipment

This disclosure provides a method, apparatus, and computer device for scheduling computing resources in robot swarms, relating to the fields of computers and robots, particularly intelligent robots, robot systems, edge computing, and computing power allocation and scheduling. The implementation scheme includes: acquiring state perception information to indicate the physical state of the robot; providing the state perception information to a state-to-computing power mapper to determine a computing resource scheduling request; based on the computing resource scheduling request, determining a target computing power unit from the global resource pool that can satisfy the request and meet the target constraints; determining a target path for applying the target computing power unit to the robot based on a preset path decision mechanism; and applying the target computing power unit to the robot based on the determined target path. This enables real-time perception and closed-loop scheduling of edge computing power for dynamic physical tasks, significantly improving the flexibility and efficiency of computing resource scheduling in robot swarm scenarios.
Owner:VASTAI TECH (SHANGHAI) INC

SD-WAN-based AIoT device data priority scheduling method

The invention provides an AIoT device data priority scheduling method based on an SD-WAN, and relates to the technical field of data processing, and the method comprises the steps: analyzing device data at an AIoT gateway or an SD-WAN edge device into data atoms containing a security domain identifier, a service type identifier, a data size, a deadline, a basic value, an attenuation coefficient and a reliability requirement; an instant value function is generated; the edge device collects network measurement data for the superposition tunnel path according to a preset measurement period, calculates a path time delay quantile and a path packet loss rate quantile, obtains a deliverable coefficient and an expected delivery value of a data atom on each path, and further calculates a unit byte scheduling index; selecting the maximum scheduling index to send under the constraint of credit balance; when the deliverable coefficient is lower than the reliability requirement, double-path copying or system code action is executed, and a receiving end carries out duplicate removal and expired discarding; and the edge device reports statistical information, and the controller updates the next window allocation to realize closed-loop scheduling and resource isolation.
Owner:SHENGDIE ZHIYUN (SHANGHAI) TECHNOLOGY CO LTD

Intelligent warehouse multi-agv scheduling method and system

The application discloses a kind of intelligent warehousing multi-AGV scheduling method and system, it is related to warehousing scheduling technical field, task path is solved using graph optimization algorithm joint multi-objective scheduling trade-off factor model, output task allocation and path planning scheme, task allocation and path planning scheme are loaded to time axis, path is time sequence simulation, potential congestion point or resource conflict area in path is identified, and according to identification result, part of AGV path is optimized, time traffic pressure index and actual AGV operating state are used as input, scheduling verification is carried out through multiple rounds of offline simulation, and multi-AGV scheduling holographic dataset is integrated, and task state driven multi-AGV closed-loop scheduling scheme is constructed.The scheduling method is by constructing multi-dimensional scheduling model that fuses task, path and resource information, and combining graph optimization, dynamic simulation and closed-loop control, the efficient cooperation and real-time response of multi-AGV system are realized.
Owner:INSPUR SMART SUPPLY CHAIN TECH (SHANDONG) CO LTD

Distributed collaborative mutual aid optimal scheduling method and platform for multiple virtual power plants

The invention discloses an optimal scheduling method and platform for distributed collaborative mutual aid of multiple virtual power plants, relates to the technical field of intelligent scheduling of power systems, and is used for solving the problems of limited data privacy, slow optimization convergence and opaque transaction execution among the existing multiple virtual power plants. The method comprises the following steps: firstly, calculating power generation cost increments under different output levels according to wind power and photovoltaic output prediction and load demand prediction data of each virtual power plant, and generating a quotation curve reflecting transaction willingness; then, each virtual power plant quotation curve is used as an input, a distribution network topology parameter and a line capacity constraint are combined, a distributed collaborative optimization model based on Lagrangian relaxation is constructed, and parallel solving of local power optimization and coordination layer dual updating is realized; in the iteration process, a penalty factor is adaptively adjusted through the ratio of an original residual error to a dual residual error, and the stability and convergence efficiency of the algorithm are improved; after optimization convergence, the mutual aid power and the transaction price are written into a block chain intelligent contract, settlement and deviation punishment are automatically executed based on metering data on the chain, and a closed-loop scheduling system from distributed optimization to trusted execution is constructed.
Owner:CHAOYANG POWER SUPPLY COMPANY OF STATE GRID LIAONING ELECTRIC POWER SUPPLY

Road engineering construction resource dynamic optimization scheduling system based on Internet of Things and implementation method

The invention discloses a highway engineering construction resource dynamic optimization scheduling system based on the Internet of Things and an implementation method, and the system comprises a multi-dimensional perception layer, an edge calculation transmission layer, an intelligent decision scheduling layer and an execution feedback layer, and each layer forms a perception-calculation-decision-execution-feedback closed-loop scheduling system. The multi-dimensional sensing layer is deployed on a highway construction area and various construction resources; the edge calculation transmission layer performs real-time preprocessing and local calculation on the multi-source data acquired by the sensing layer; a dynamic optimization scheduling model based on reinforcement learning is built in the intelligent decision scheduling layer, and a resource scheduling optimization scheme is output; the execution feedback layer is used for driving the construction resources to execute the scheduling instruction. According to the method, the core problems of one-sided perception, calculation lag, decision-making rigidity, feedback deficiency and the like in a traditional mode are solved, road construction resource scheduling is promoted to be transformed from experience-driven to data-driven and intelligent decision-making, and finally optimal configuration of construction resources and efficient management and control of the construction process are achieved.
Owner:SICHUAN ROAD & BRIDGE CONSTRUCTION GROUP CO LTD

A digital and intelligent unattended service management and scheduling system

The present application relates to the technical field of resource scheduling, in particular to a digital intelligent unaccompanied service management scheduling system, comprising: a service baseline construction module, which instantiates service items into standard plan event streams; a state portrait generation module, which collects service object data streams, applies a recurrent neural network model to establish dynamic time series signals, and quantifies the occurrence probability of future abnormal events through multi-step prediction; when an abnormality is triggered, a knowledge graph is applied to perform bidirectional collision positioning of causes; a task load calculation module integrates the plan event streams into plan task components, combines the predictive risk score, and further combines the real-time load of staff containing a fatigue index and spatial accessibility analysis to generate a staff resource list; the system further comprises a task allocation module, which determines the optimal staff and generates closed-loop scheduling instructions by minimizing a composite cost function containing a predictive load cost, thereby realizing digital intelligent unaccompanied service management from prediction to scheduling.
Owner:NANJING TIANYI SMART ELDERLY CARE SERVICE CO LTD

Cunninghamia lanceolata forest-oriented periodic tending scheduling method, device and equipment and storage medium

The invention discloses a cedarwood forest-oriented periodic tending scheduling method, device and equipment and a storage medium, and relates to the technical field of intelligent forestry driven by artificial intelligence, and the method comprises the steps: optimizing a preset initial tending period through a tending period adjustment model based on LSTM training, and obtaining a target tending period; when the period is started, collecting multi-mode cedarwood forest data, and preprocessing the multi-mode cedarwood forest data to form target data; inputting the target data into a cunninghamia lanceolata forest growth prediction model constructed by CNN and PointNet, and outputting a breast diameter growth prediction value, a species richness prediction value and a tending standard reaching probability; and an equipment control strategy is generated, and intelligent felling equipment, an automatic replanting device or mechanical brush cutting equipment is scheduled to execute tending operation. According to the method, closed-loop scheduling from period setting, state sensing and intelligent decision making to automatic execution is realized, and periodic intelligent tending scheduling can be realized on the premise of avoiding excessive interference on the Chinese fir forest.
Owner:HUNAN PROSPECTING DESIGNING & RES INST FOR AGRI FORESTRY & IND

Multi-manufacturer fan unified control system based on Web forwarding and protocol adaptation

The invention belongs to the technical field of fan operation control, and particularly relates to a multi-manufacturer fan unified control system based on Web forwarding and protocol adaptation. Accessing a unified fan control instruction sent by a dispatching center or an external system; the accessed unified fan control instruction automatically selects a corresponding protocol adaptation module based on a manufacturer protocol interface model to obtain a manufacturer fan control instruction; original data is converted into a unified data structure through field mapping; constructing a wind power mapping function according to the digital relationship between the fan output power and the wind speed change; performing health state quantitative judgment on the controllability of the fan based on the alarm quantity of the unified data structure; and based on the unified data structure, the wind power mapping function and the health state quantitative judgment calculation, generating a closed-loop scheduling instruction of the fan. The control system can realize unification of fan control interfaces, standardization of fan data and coordinated control of fan clusters under the conditions of mixed use of multiple protocols, complex fan scenes and diverse fan manufacturers.
Owner:BEIJING DONGFANG AOSHEN TECH & TRADE CO LTD

A Comprehensive Energy System Optimization and Scheduling Method Based on Carbon Emission Constraints and Efficiency Orientation

The application discloses a park comprehensive energy system optimization scheduling method based on carbon emission constraint and efficiency orientation; the method comprises the following steps: constructing an electricity-heat-cold-gas multi-energy flow topology and an energy conversion model set of coupling equipment; obtaining electricity / heat / cold load, wind and light output prediction and carbon factor; establishing a comprehensive optimization model containing economic cost, wind and light abandonment penalty, carbon cost and cascade utilization efficiency item, and setting multi-energy flow balance, energy storage SOC, equipment output / climbing, power grid interaction and carbon emission total amount / intensity constraint; solving to obtain equipment output and energy storage charging and discharging sequence generation scheduling instruction in each period, triggering rolling re-optimization according to the measured carbon emission overrun in operation, enhancing the adaptability to disturbance, forming a low-carbon and high-efficiency closed-loop scheduling which is monitorable, constraintable and deviation-correctable, and realizing safe, economic and low-carbon collaborative operation of the park comprehensive energy system.
Owner:POWERCHINA FUJIAN ELECTRIC POWER SURVEY & DESIGN INST CO LTD

AGV cluster distribution scheduling method based on multi-agent cooperative control

The invention discloses an AGV cluster distribution scheduling method based on multi-agent cooperative control, and the method comprises the following steps: constructing a self-organizing cognitive map control network based on virtual potential flow, and building a mapping relation between a physical layer and a cognitive layer; establishing a virtual potential flow model in the cognitive layer, and generating an initial virtual potential flow field; potential flow distribution is monitored based on information entropy, a balance area and a disorder area are divided, and a virtual potential flow state diagram is generated; potential flow adjusting nodes are generated in the disorder area, and an adjusted virtual potential flow field and a coordination instruction set are formed; issuing the adjusted potential flow field to a physical layer, and generating a path occupation set; and the cognitive layer performs conflict detection and time sequence coordination to form a closed-loop scheduling control system driven by the virtual potential flow. Based on the virtual potential flow self-organizing cognitive map, autonomous collaborative scheduling of the AGV cluster is achieved, and the method has the advantages of being high in real-time performance, high in coordination and capable of achieving self-adaptive optimization.
Owner:SHENZHEN YUNTONG ROBOT CO LTD

A multi-robot scheduling method based on context-adaptive decision and congestion-aware planning

PendingCN122632762APathPingBottleneck
The application provides a kind of multi-robot scheduling method based on context adaptive decision and congestion perception planning. Online tasks, robot states, road bottlenecks, commitment paths and historical feedback are obtained according to a predetermined period to construct context features. A context confidence upper bound model is used to select among multiple task allocation strategies online, and the model is updated based on task completion, waiting time, task backlog and planning time. The selected strategy is compared with the congestion perception anchor strategy through the service protection mechanism, and the system will safely fallback when the constraints are not met. A commitment path is generated through rolling horizon path planning, and bounded local repair is performed on conflict clusters to form a closed-loop scheduling. Compared with the prior art, the application has the following advantages: 1) it can adaptively switch strategies according to dynamic load and congestion state; 2) it makes the upper allocation aware of the lower congestion through shadow prices and execution feedback; 3) it does not require black box models and high-overhead global re-planning, improving scheduling efficiency, stability and safety.
Owner:GUILIN UNIV OF ELECTRONIC TECH

An industrial sensing and transmission algorithm closed-loop scheduling method and system based on digital twinning

This invention belongs to the field of intelligent edge network technology and discloses an industrial sensing, communication, computing, and closed-loop scheduling method and system based on digital twins. Within the current closed-loop scheduling time slot of multiple industrial AGVs, it acquires environmental perception data, the state information of each AGV and the edge gateway, constructs a state representation model in a digital mapping space, establishes a collaborative benefit evaluation mechanism, obtains the collaborative benefit of a single time slot, and derives a comprehensive benefit function. It then employs a closed-loop scheduling decision algorithm to optimize the strategy, outputs the sensing frequency strategy and task allocation strategy for each AGV in the next time slot, and distributes them to the corresponding AGVs, updating the state representation model and realizing the collaborative scheduling of the industrial multi-AGV system. This invention can uniformly optimize multiple aspects such as perception, communication, computing, and scheduling feedback, and uses the updated state representation model in the digital mapping space to support the generation of scheduling decisions for the next time slot, thereby improving the closed-loop scheduling capability and overall operating efficiency of the industrial multi-AGV system.
Owner:NANJING UNIV OF POSTS & TELECOMM

Power consumption management device and method for multi-site parallel test

The invention relates to the technical field of semiconductor and electronic testing, and discloses a power consumption management device for multi-site parallel testing, which comprises a vector power consumption feature library for storing expected power consumption; a plurality of site-level energy buffer units for responding to the instantaneous power consumption demand; the local state monitors are used for monitoring the real-time energy state of the buffer unit; the central power supply scheduler firstly generates a preliminary phase shift scheduling plan for staggering the preliminary execution starting time of each station on the basis of the expected power consumption; then in the test execution process, the real-time energy state fed back by the local state monitor is received in real time; and based on the real-time energy state, adaptively correcting the initial execution starting time to obtain final execution starting time, and issuing an instruction. Through combination of predictive open-loop scheduling and real-time closed-loop correction and cooperation with local energy buffering, smoothing of total power consumption and adaptive management of instantaneous fluctuation are realized.
Owner:NANJING MACROTEST SEMICON TECH CO LTD

Intervention task closed-loop scheduling method and system based on learning condition risk radar

PendingCN121724361AData processing applicationsFeature vectorUtility computing
The invention discloses an intervention task closed-loop scheduling method and system based on a learning condition risk radar, and belongs to the technical field of online learning education, and the method comprises the steps: collecting original learning condition log data, carrying out the preprocessing, and obtaining a smooth feature vector; carrying out trend risk estimation and mutation risk modeling on the smooth feature vector to obtain a fusion risk score; based on the questions, the knowledge points and the error cause labels, constructing an error cause link diagram, and obtaining an error cause link priority; constructing a candidate intervention task set; performing utility calculation on the candidate intervention task set to generate a constraint matrix; performing feasibility solution on the candidate intervention task set by adopting a multi-strategy king butterfly optimization algorithm, and searching an optimal task combination of a current period; performing result distribution on the optimal task combination of the current period to obtain a receipt set; and carrying out weight adaptive adjustment according to the receipt set, carrying out iterative loop until a preset convergence condition or a maximum number of iterations is reached, and outputting the intervened task combination.
Owner:SICHUAN QIMINGDAREN TECH CO LTD