Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

42results about How to "Realize automatic division" patented technology

Method for picking position faces in batched mode based on constraint in three-dimensional seismic interpretation

The invention discloses a method for picking position faces in a batched mode based on the constraint in three-dimensional seismic interpretation. An upper position face and a lower position face which are picked manually or in other modes serve as constraint faces, known conditions provided by the constraint position faces are obtained, the interaction relation between middle position faces to be picked is combined, and all position faces between the constraint position faces are picked synchronously. The new method for automatically picking a plurality of position faces with constraint information added is provided, the information of the upper constraint position face and the information of the lower constraint position face are combined in the method, and auxiliary information of the position faces to be picked is provided. A seed seismic channel spreading method is adopted on sample points which are obtained through filtering, and the accuracy and the time efficiency can be improved.
Owner:NANJING UNIV

Method for calculating three-dimensional crack propagation fatigue life of spherical shell surface

The invention belongs to a deep sea engineering technology and particularly relates to a spherical shell surface three-dimensional crack propagation fatigue life calculation method. The method comprises the following steps of establishing a complete spherical pressure-resistant shell initial geometric model; endowing the spherical shell model with material parameters and section attributes, dividing grids, and setting boundary and load conditions; establishing an initial crack model; endowing material parameters to the crack model, defining section attributes, dividing grids and determining the positions of the grids; importing the two models to generate a complete spherical shell finite element numerical model locally containing surface crack defects; solving an initial crack leading edgestress intensity factor value by adopting an M integral method; reading and running a fatigue life calculation model program; setting automatic crack propagation parameters; and obtaining a sphericalshell surface three-dimensional crack propagation fatigue life numerical value based on a self-defined propagation program. According to the method, finite element analysis software and fracture mechanics analysis software are combined to calculate the three-dimensional crack propagation fatigue life of the surface of the spherical shell, and applicability of the method is verified through numerical simulation.
Owner:JIANGSU UNIV OF SCI & TECH

Method for processing data and identifying fluctuations of historical wind power output

The invention provides a method for processing data and identifying fluctuations of historical wind power output, which consists of the steps of: collecting historical wind power output data and analyzing & arranging the output data; carrying out the normalization processing and wavelet filtering processing of the analyzed and arranged historical wind power output data and then carrying out fluctuation division; checking the historical wind power output data and the wind fluctuation clustering effect by means of a visualization method. The invention provides the method for processing data and identifying fluctuations of historical wind power output, which can be used as the pre-stage basis of long-term output time series modeling of wind power and can also be used for the planning and operation analysis of the power system including wind power.
Owner:STATE GRID CORP OF CHINA +3

Data processing method and device, computer readable storage medium and electronic equipment

The embodiment of the invention discloses a data processing method and device, a computer readable storage medium and electronic equipment, and the method comprises the steps: collecting a user time sequence sample set, and generating initial positive sample data and initial negative sample data from the user time sequence sample set; inputting the initial positive sample data and the initial negative sample data into a preset neural network model for first training to obtain a first trained preset neural network model; identifying the user time sequence sample set according to the preset neural network model after the first training, and determining target positive sample data and mutation negative sample data; and inputting the target positive sample data and the abrupt change negative sample data into the initialized preset neural network model for second training to obtain a second trained preset neural network model. Through secondary training, the second trained preset neural network model with the sequence division function is obtained, automatic division of the user time series data is achieved, and the data processing efficiency and accuracy are greatly improved.
Owner:TENCENT TECH (SHENZHEN) CO LTD

Method and system for automatically dividing user levels

This invention discloses a method and system for automatically dividing user levels, and relates to the technical field of data mining. The method comprises the steps of: S1, selecting original sample data; S2, selecting at least one type of user characteristic as a dimension for calculating distance; S3, determining number K of classifications; S4, selecting K users from the original sample data as initial classification centers; S5, measuring distance from the rest of each user in the original sample data to each of the current classification center; classifying the rest of each user into a nearest classification to finish the division of K classifications; S6, recalculating the classification center of each classification; S7, iterating the S5 and the S6; and stopping the iterative operation till a new classification center is equal to the original classification center or till the variable quantity is less than a specified threshold, so that the currently divided K classifications are the user level classifications required to be divided. The method can automatically divide the user levels, is precise and efficient, and can save the labor cost.
Owner:武汉斗鱼鱼乐网络科技有限公司

Freeform surface building grid division method based on self-defined element method

The invention discloses a freeform surface building grid division method based on a self-defined element method. According to the grid division method, grid nodes serve as objects to advance. The method comprises steps of determining a node advancing parameter direction, defining, selecting and assembling grid units and mapping parameter grids. As for determining of the node advancing parameter direction, the parameter direction with obvious surface shape feature changes is selected to serve as the node advancing direction. As for defining, selecting and assembling of the grid units, self definition of grid units are carried out in a parameter domain, unit selection and assembly are carried out according to the surface features, and node parameter coordinates and topology information are determined. The parameter grids are mapped to the freeform surface to form a space grid. According to the method of the invention, the building grids of any complicated freeform surfaces can be automatically divided, the generated grids have various forms and uniform size, aesthetic demands and visual effects of the building can be met, the method is flexible and controllable, and universality is strong.
Owner:ZHEJIANG UNIV

Automatic division method for catchment area of urban drainage pipe network

The invention discloses an automatic division method for a catchment area of an urban drainage pipe network, solves the problem of low division efficiency of an existing catchment area, and belongs to the field of cross application of environmental engineering, visible light remote sensing image semantic segmentation and computer vision. The method comprises the following steps: S1, acquiring a remote sensing image of an urban target area, and constructing a training data set; S2, utilizing a convolutional neural network coupling variant residual network to construct a road network extraction convolutional neural network model, and using a variant residual network as a coding structure of the convolutional neural network; S3, training a road network extraction convolutional neural network model by using the training data set, and determining parameters of the road network extraction convolutional neural network model; S4, inputting the remote sensing image of the city area to be divided into a road network extraction convolutional neural network model, and extracting road network information; and S5, dividing the extracted road network information into water catchment area, and further dividing sub-water catchment areas by using an inverse distance weighted Thiessen polygon method in combination with prior information of rainwater well point distribution.
Owner:HARBIN INST OF TECH

Method and apparatus for dividing provider-defined network location identifier (PID), and application-layer traffic optimization (ALTO) server

The invention discloses a method and an apparatus for dividing a provider-defined network location identifier (PID), as well as an application-layer traffic optimization (ALTO) server and a border gateway protocol (BGP) module, wherein the method comprises the following steps that a route request is sent to the border gateway protocol module by the ALTO server; the route information is returned to the ALTO server after the route request which is sent by the ALTO server is received by the BGP module, the route information carries a route of a terminal and a source autonomous system (AS) serial number; and after the route information which is returned by the BGP module is received by the ALTO server, the terminal is divided into multiple PIDs by the ALTO server in accordance with a preset PID division strategy depending on the route of the terminal as well as the source AS serial number carried in the route information. According to the method and the apparatus, the ALTO server and the BGP module, PIDs are automatically divided with the help of the route information of the BGP and the source AS information, so that the labor is saved; moreover, the operation of PID division is intelligent, has few errors and is simple and feasible.
Owner:ZTE CORP

Automatic classification method for layered rock side slopes

The invention discloses an automatic classification method for layered rock side slopes. The method comprises the following steps of (1), preprocessing a ridge line, and dividing a mountain boundary based on the ridge line for forming a side slope unit; (2), calculating side slope attitude information and bed attitude information; and (3), according to a layered rock side slope classification standard, classifying the side slopes. The automatic classification method can realize automatic classification of the layered rock side slopes and furthermore has advantages of high automation degree, high objectivity, and effective satisfaction for classifying large-range layered rock side slopes.
Owner:NANJING NORMAL UNIVERSITY

Message processing method and apparatus

The invention discloses a message processing method and apparatus. The method comprises the following steps: performing grade division on received messages according to a preset grade division strategy, and determining a grade to which each message belongs; and responding to a first message processing operation of a user, performing first processing on the message of the corresponding grade of thefirst message processing operation. In the message processing method and apparatus disclosed by the invention, automatic grade division of the received messages is achieved, the time consumption is short, a user can conveniently select the message of a certain grade for processing according to the importance of the message, thereby being convenient to process the important messages and avoiding delaying the processing of the important messages.
Owner:VIVO MOBILE COMM CO LTD

Zinc dross image recognition and classification method

The invention discloses a zinc dross image recognition and classification method, which belongs to the technical field of image processing and dross fishing, and comprises the following steps: preprocessing a zinc pot image data set; cutting the preprocessed picture into small pieces of pictures, and labeling; making the cut small pictures into a training set, a verification set and a test set; training the training set by adopting a convolutional neural network and testing performance; and identifying and classifying the zinc dross images by using the debugged network. The invention providesa visual zinc dross identification scheme for an existing dross fishing robot, and compared with a full-coverage dross fishing and blind fishing mode, the operation efficiency is improved, and the dross fishing cost is reduced.
Owner:WUHAN UNIV OF SCI & TECH

Substation three-dimensional live-action model establishing method and system

The invention discloses a method for establishing a three-dimensional live-action model of a transformer substation. The method comprises the following steps: (1) acquiring original point cloud data of the transformer substation; (2) preprocessing the original point cloud data of the transformer substation; (3) dividing the preprocessed transformer substation point cloud data into equipment pointclouds with noise points and ground point clouds by adopting an elevation threshold segmentation algorithm; (4) extracting equipment point clouds from the equipment point clouds with the noise pointsby adopting a two-dimensional subspace density difference segmentation method, and thinning the ground point clouds by adopting a one-dimensional subspace density difference; and (5) establishing a three-dimensional live-action model of the transformer substation by adopting the extracted equipment point cloud and the thinned ground point cloud. In addition, the invention also discloses a system for establishing the three-dimensional live-action model of the transformer substation, the system comprises a processing module, and the processing module operates based on the acquired original pointcloud data of the transformer substation. According to the substation three-dimensional live-action model establishing method, noise interference is effectively suppressed, and accurate extraction and positioning of substation equipment are realized.
Owner:STATE GRID EAST INNER MONGOLIA ELECTRIC POWER CO LTD MAINTENANCE BRANCH +1

Text division method and device, storage medium and electronic equipment

The invention relates to a text dividing method and device, a storage medium and electronic equipment. The method comprises the steps of obtaining a target text and a previous text and a next text adjacent to the target text; sequentially obtaining text feature vectors of the previous text, the target text and the next text; and according to the text feature vector, dividing the target text to a previous text or a next text adjacent to the target text through a text division model obtained by pre-training.
Owner:BEIJING YOUZHUJU NETWORK TECH CO LTD

Urban road network traffic control subarea dynamic partitioning method

The invention discloses an urban road network traffic control subarea dynamic partitioning method, which comprises the following steps of: 1, initializing a traffic control computer; 2, judging whether a current moment reaches to ta while not to tb yet, wherein if yes, a road network traffic state is represented to be at a trough, and traffic control subarea partitioning is not needed; and ta is the starting moment of the trough at night, tb is the finishing moment of the trough at night, and a traffic engineer confirms that the ta is 22:00 and the tb is 6:00; 3, if not, judging whether the current moment is tb or not, and if the current moment is just tb, carrying out traffic control subarea initialized portioning; 4, if the current moment is not tb, judging whether a time difference between the current moment and traffic control subarea partitioning last time is Tk or not, wherein if yes, carrying out traffic control subarea dynamic adjusting, and Tk is a traffic control subarea dynamic adjusting time interval; and 5, if the current moment is not tb, and the time difference between the current moment and traffic control subarea partitioning last time is not Tk, remaining a traffic control subarea scheme unchanged.
Owner:JILIN UNIV

Carbonate rock high-frequency sequence automatic identification method based on BP neural network

The invention discloses a carbonate rock high-frequency sequence automatic identification method based on a BP neural network. The carbonate rock high-frequency sequence automatic identification method comprises the following steps of S1, establishing a high-frequency sequence identification and division standard database; and S2, compiling and debugging a BP neural network model based on python. By learning the sequence division standard of geologists with rich sequence division experience, the BP neural network with strong migration ability is established, problems of high sequence division difficulty and long period are effectively solved, automatic division of high-frequency sequences is realized, and the method can be used as an important means for understanding marine facies stratum sedimentary environment evolution and assisting in oil-gas exploration.
Owner:CHENGDU UNIVERSITY OF TECHNOLOGY

A method for automatic division of catchment area of ​​urban drainage pipe network

An automatic division method of urban drainage pipe network catchment area solves the problem of low efficiency of existing catchment area division, and belongs to the cross-application fields of environmental engineering, visible light remote sensing image semantic segmentation and computer vision. The present invention includes: S1, obtaining remote sensing images of urban target areas, and constructing a training data set; S2, using a convolutional neural network to couple a variant residual network to construct a road network extraction convolutional neural network model, and the variant residual network as a convolution The coding structure of the neural network; S3. Use the training data set to train the road network to extract the convolutional neural network model, and determine the parameters of the road network to extract the convolutional neural network model; S4. Input the remote sensing image of the city to be divided into the road network to extract the convolution In the neural network model, road network information is extracted; S5, the extracted road network information is divided into catchment areas, combined with the prior information on the distribution of rainwater well points, the inverse distance weighted Thiessen polygon method is used to further divide sub-catchment areas .
Owner:HARBIN INST OF TECH

A Constraint-Based Batch Picking Method for Horizontal Planes in 3D Seismic Interpretation

ActiveCN103969683BImprove search efficiencyAvoid the "string layer" problemSeismic signal processingHorizonTime efficiency
The invention discloses a method for picking position faces in a batched mode based on the constraint in three-dimensional seismic interpretation. An upper position face and a lower position face which are picked manually or in other modes serve as constraint faces, known conditions provided by the constraint position faces are obtained, the interaction relation between middle position faces to be picked is combined, and all position faces between the constraint position faces are picked synchronously. The new method for automatically picking a plurality of position faces with constraint information added is provided, the information of the upper constraint position face and the information of the lower constraint position face are combined in the method, and auxiliary information of the position faces to be picked is provided. A seed seismic channel spreading method is adopted on sample points which are obtained through filtering, and the accuracy and the time efficiency can be improved.
Owner:NANJING UNIV

Method and device for dividing fault ride-through intervals of wind turbine generator

The invention provides a method and a device for dividing fault ride-through intervals of a wind turbine generator. The method comprises the following steps of: determining a wind turbine generator implementation control moment after a power grid fault occurs, a wind turbine generator implementation control moment after the power grid fault is removed, a wind turbine generator control stabilization moment after the power grid fault occurs and a wind turbine generator control stabilization moment after the power grid fault is removed; and dividing the fault ride-through intervals of the wind turbine generator based on the four moments. According to the invention, the fault ride-through intervals of the wind turbine generator can be automatically divided; the universality is high; and the control response characteristic of a simulation model can be verified. Based on fault ride-through actual measurement data of the wind turbine generator, the problems of large automatic interval division errors and poor universality caused by standard fixed time duration can be effectively solved, manual correction workload can be avoided, and the method and the device can be applied to high-voltageride-through tests and low-voltage ride-through tests at the same time.
Owner:CHINA ELECTRIC POWER RES INST +1

Signal processing method of spectrum analyzer and spectrum analyzer

A signal processing method of a spectrum analyzer and the spectrum analyzer, the spectrum analyzer includes a radio frequency scanning module, a data acquisition module, a detection module, a display module and a control processing module, wherein the control processing module obtains the endpoints of a plurality of predefined scanning frequency bands Frequency and receive the scanning parameters input by the user, and determine the endpoint frequencies of multiple detection frequency bands according to the endpoint frequencies and scanning parameters of multiple scanning frequency bands. When it is detected that the endpoint frequency of the scanning frequency band does not coincide with the endpoint frequency of any detection frequency The endpoint frequency of the scanning frequency band sent to the radio frequency scanning module is adjusted, the endpoint frequency of the scanning frequency band is sent to the radio frequency scanning module, and the endpoint frequency of the detection frequency band is sent to the detection module, so that the radio frequency scanning module treats it according to the scanning frequency band determined by the control processing module The test signal is scanned so that the actual scanning frequency band matches the frequency range of the entire RF scanning and the data processing requirements configured by the user.
Owner:SHENZHEN CITY SIGLENT TECH

Automatic process step design method based on knowledge reasoning

The invention discloses an automatic process step design method based on knowledge reasoning, and the method comprises the following steps: 1, checking process basic information, and checking whether inherited or created process level information meets the requirements of a current process or not; 2, automatically dividing process steps, taking out the procedure nodes determined in the step 1 one by one, and automatically calculating the number of process steps of the current procedure according to the precision requirement and the procedure cutting thickness; step 3, processing parameter recommendation and adjustment: selecting cutting parameters according to a parameter selection strategy and enterprise requirements, verifying the cutting parameters, and adjusting the parameters according to a parameter adjustment algorithm; and step 4, revision and analysis of the three-dimensional technological procedure: after the system automatically completes the design of the process steps, looking up the result and revising same interactively, and publishing the revised technological procedure at the same time. The method can automatically determine the number of the process steps and recommend and adjust the processing parameters, so that the intelligence and automation level of the process compiling is improved, and the efficiency and quality of the process compiling are improved.
Owner:AVICIT CO LTD

Shield tunnel internal force calculation method based on simulation joint model

The invention discloses a shield tunnel internal force calculation method based on a simulation joint model, and relates to the technical field of engineering construction. The shield tunnel internalforce calculation method utilizes MATLAB software and ANSYS software to carry out combined calling, utilizes MATLAB to carry out pretreatment work such as stratum repartitioning, segment partitioningand segment calculation unit partitioning, calculates and outputs the internal force of the structure by utilizing ANSYS, adopts a simulation joint model for shield tunnel internal force calculation,can obtain a final calculation sheet only by inputting initial engineering parameters into MATLAB software, achieves automation of shield tunnel internal force calculation, greatly improves the efficiency of structural internal force calculation, and provides a way and thought for automatic calculation of internal force of a shield tunnel and other underground structures.
Owner:SOUTHWEST JIAOTONG UNIV +1

Signal processing method of spectrum analyzer and spectrum analyzer

The invention discloses a signal processing method of a spectrum analyzer and the spectrum analyzer, the spectrum analyzer comprises a radio frequency scanning module, a data acquisition module, a detection module, a display module and a control processing module, and the control processing module obtains the endpoint frequencies of a plurality of predefined scanning frequency bands and receives scanning parameters input by a user; and according to the endpoint frequencies of the plurality of scanning frequency bands and the scanning parameters, the endpoint frequencies of the plurality of detection frequency bands are determined, and when it is detected that the endpoint frequencies of the scanning frequency bands do not coincide with the endpoint frequency of any detection frequency band, the endpoint frequencies of the scanning frequency bands sent to a radio frequency scanning module is adjsuted, the endpoint frequency of the scanning frequency band is sent to the radio frequency scanning module, and the endpoint frequency of the detection frequency band is sent to the detection module, so that the radio frequency scanning module scans the signal to be detected according to the scanning frequency band determined by the control processing module; therefore, the actual scanning frequency band is matched with the frequency range of the whole radio frequency scanning and the data processing requirement configured by the user.
Owner:SHENZHEN CITY SIGLENT TECH

Community core person mining method and system, electronic equipment and readable storage medium

The invention discloses a community core person mining method, which comprises the steps of obtaining a target user group under a target group number, and obtaining communication data in the target user group; cleaning and converting the communication data, and constructing a target user call sequence; dividing a community structure of the target user group by using a Louvain algorithm through thecommunication data; making the shortest path between the nodes of the community through a Dijkstra algorithm, calculating the centrality of each node, and excavating the central node of the network graph; and calculating the volatility of each center node, wherein the center node with low volatility is the community core of the target user group. The method is unsupervised in the whole process, that is, the final structure completely depends on algorithm clustering, and artificial preset classification in advance is not needed. The method has no strict requirements for the size of the graph,can achieve the quick convergence after several rounds of iteration, and is higher in algorithm efficiency.
Owner:FUJIAN NEWLAND SOFTWARE ENGINEERING CO LTD

Data visual display method of computer fluid mechanics in smelting process

The invention relates to the data visualization method of the computational fluid dynamics applied to the metallurgical process. The drawing platform realizes the automatic conversion between the rectangular coordinate system in drawing and the screen coordinate. The different middle package objects are drawn on the drawing platform. The borderline is defined as the connected place between two phases on the outer outline of the middle packages. Based on the mesh partitioning approach of the set theory, the meshes of the middle package are automatic partitioned. The constant value lines of the concentration field and temperature field etc. are converted to the graphic drawing. The data of the CFD are visualized. The invention can extend the visual contents, make the design and calculation be checked and adjusted easily.
Owner:SHANGHAI JIAO TONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products