The invention provides an installation process for a back
well drilling type platform sleeving-free
wellhead. The installation process comprises the following installation steps that 1, a water insulation casing
pipe is divided into three or four sections of water insulation casing
pipe bodies, the first two or three sections of water insulation casing
pipe bodies are made to reach the designed driving depth after penetration into the
seabed, and the
tail section of water insulation casing pipe body is reserved; 2, a pipe guide frame is installed on the sea; 3, the first two or three sections of water insulation casing pipe bodies which reach the designed driving depth after penetration into the
seabed are installed on the sea; 4, an upper assembling block is built on the land, and the
tail section of water insulation casing pipe body is installed and fixed to a
wellhead area of the upper assembling block; 5, the upper assembling block and the
tail section of water insulation casing pipe body fixed to the upper assembling block are transported on the sea; and 6, after the upper assembling block is installed on the sea, fixing of the tail section of water insulation casing pipe body is removed, and the tail section of water insulation casing pipe body is connected back to the first two or three sections of water insulation casing pipe bodies. According to the installation process for the back
well drilling type platform sleeving-free
wellhead, the problems that the
lifting difficulty of the upper assembling block on the sea is large, and the requirements for a weather window and the sea conditions are high are solved; and in addition, wellhead sleeving is avoided, so that the installation risk of the upper assembling block on the sea is reduced.