Provided is a hydrometallurgical process for nickel oxide ore for recovering nickel and cobalt using a high pressure acid leach process, the process achieving simplification and durability improvement of production facilities, achieving cost reduction and suppression of environmental risk by the compression of the capacity of a tailings dam for storing wastes, and being capable of recycling and effectively utilizing the wastes as a resource. The hydrometallurgical process for nickel oxide ore for recovering nickel and cobalt using a high pressure acid leach process includes an ore processing step, a leaching step, a solid-liquid separation step, a neutralization step, a zinc removal step, a sulfurization step, and a final neutralization step, and further includes step (A), or further includes step (A) and, step (B-1) and / or step (B-2) after step (A).