Submersed type inspection well and construction method thereof

InactiveCN101684669ASolve the contradiction that the retention interval is too shortEasy constructionSewerage structuresDowntown areaWellbore
The invention discloses a submersed type inspection well which comprises a well cover above the ground as well as a shaft and a well body structure below the well cover, wherein the traditional drainage pipe is arranged below the shaft, a foundation is arranged between the lower end of the shaft and the drainage pipe, and the lower end of the shaft, the upper end of the foundation and the pipe arepoured into a whole; the diameter of the foundation is larger than the outer diameter of the shaft, and the bottom end of the foundation is located below the sheath of the traditional drainage pipe;and the bottom end of the foundation is inwards extended below the traditional drainage pipe. The invention also discloses a construction method for realizing the inspection well, which comprises thefollowing construction stages: (1) placing the inspection well; (2) submersing, joining and measuring the shaft; (3) manufacturing the foundation of the inspection well and communicating the shaft with the traditional drainage pipe; and (4) mounting a shaft cover plate and a ladder. By adopting the structure and the method of the invention, the inspection well is conveniently manufactured by adopting a submersed type construction method so as to be beneficial to carrying out long-distance jacking pipe construction and developing novel prefabricated inspection well structures and convenient for carrying out pipe engineering construction in downtown areas without excavating.
Owner:吴纪东 +1

Circular deep foundation ditch concrete pile arranging support and major structure inversing construction method

The invention belongs to the construction method of a deep foundation pit of industrial construction, particularly relates to a reverse operating construction method of a round deep foundation pit concrete piling support and a main structure and solves the problem that the existing construction method of the deep foundation pit is not suitable for complex geological condition and the construction cost is too high. The construction method comprises the following steps: the center of the foundation pit is adopted as the center and the outer sides of the position of the main structure are respectively distributed with pilings; the top parts of the pilings are poured with crown bore beams which connects the top parts of the pilings into one body; the first section of the foundation pit is excavated, reverse operation is carried out to the outer layer of the first section of the main structure; the outer layer of the first section of the main structure and the pilings are integrated by the crown bore beams so as to form a primary support of the foundation pit; the foundation pit is excavated by sections, reverse operating construction of the outer layer of the main structure is carried out by sections, which form a foundation pit support together; and normal operating construction is carried out to the inner layer of the main structure. The invention is applicable to poor geological condition and is particularly applicable to structural diversity of the soil layer in the depth range of excavation of earthwork, thus ensuring the stability of the soil body of the main structure in the construction period, greatly reducing the cost of construction measures and improving the construction speed.
Owner:MCC TIANGONG GROUP

Construction method of near natural mangrove forests at reef shallows

ActiveCN111052974AGood wind and wave effectAvoid damageCultivating equipmentsMangrove plantsPlantlet
The invention discloses a construction method of near natural mangrove forests at reef shallows. Three layers of cofferdams sequentially including a first cofferdam, a second cofferdam and a third cofferdam are arranged, wherein the first cofferdam is formed through piling of hollow wave resistant blocks, and mangrove plants are planted; a pioneer protection layer is between the first cofferdam and the second cofferdam, a near natural recovery layer is between the second cofferdam and the third cofferdam, and local mangrove forest plants are planted; and a seedling supply layer is in the thirdcofferdam. According to the construction method of near natural mangrove forests at reef shallows, the pioneer protection layer is arranged outside, so that the effects of preventing wind and preventing waves can be achieved, destruction of the wind and the waves to the near natural recovery layer is decreased, and planting of the local mangrove forest plants in the near natural recovery layer isfacilitated; mangrove plantlets are cultivated in the seedling supply layer, and seedlings can be voluntarily and continuously supplied to the near natural recovery layer, so that long distance purchase and transportation of seedling sources can be avoided, and the production cost can be reduced; and three layers are divided, so that ecological stability and species diversity of mangrove forest communities are increased. The construction method disclosed by the invention is used for the field of mangrove forest planting.
Owner:广州普邦园林股份有限公司

Mechanical pipe jacking construction process

The invention relates to the technical field of pipe jacking construction, and aims to provide a mechanical pipe jacking construction process. The process comprises the following steps of lofting andrechecking; well construction; pipe jacking equipment and ground auxiliary facilities are installed; discharging the pipe jacking equipment out of the working well; a jacking axis is preset on the console, the position relation between a machine head of the pipe jacking equipment and the jacking axis is displayed in a laser point mode, and meanwhile a three-dimensional simulation model used for simulating the pipe jacking construction process is arranged in the application background; the application background obtains construction process data of the console in real time and inputs the construction process data into the three-dimensional simulation model, and the three-dimensional simulation model controls the application background to give an alarm; an operator adjusts the position of amachine head of the deviation correcting pipe jacking equipment until the position deviation between the laser point and the jacking axis is smaller than or equal to a preset value; pipe jacking equipment enters a receiving well; and jacking-in and soil-out device. The process has the effects of assisting an operator in finding the running direction of the machine head and adjusting the running direction of the machine head in time, so that the situation that the construction quality is influenced by personal errors during construction is reduced.
Owner:广州坚磊建设有限公司

Method for controlling wind erosion of nursery stock bases in desert areas

The invention relates to a method for controlling wind erosion of nursery stock bases in desert areas. The method relates to a nursery stock sand storm protection cover which comprises a cover body, a cover edge and a fixed drill rod, wherein the cover body is shaped like a round table; the cover edge is arranged at the bottom of the cover body; and the fixed drill rod is inserted into a fixed hole on the cover edge and then fixed in soil on the earth surface. After a nursery stock is planted in a desert area, the nursery stock sand storm protection cover is taken, and the cover body and a gap on the side wall of the cover edge are slightly unfolded to horizontally move toward the nursery stock; branches of the nursery stock are collapsed and pass through the gap; the cover body is arranged around the nursery stock; the protection cover is rotated to ensure that the gap on the protection cover is toward the downwind direction of the local predominant wind direction; and along with the growth of the nursery stock, when the sand storm protection cover limits the growth of the trunk, the cover body and the gap on the side wall of the cover edge are unfolded and then the protection cover is taken off. The method can be used for the forestation in desert areas with the advantages of improving the micro environment of nursery stock bases, preventing the wind erosion of the soil at the roots of the newly planted seedlings and improving the nursery stock survival rate, has a wide application range and can be widely applied to the construction projects of ecological forests and economic forests.
Owner:XINJIANG INST OF ECOLOGY & GEOGRAPHY CHINESE ACAD OF SCI

Submersed type inspection well construction method

The invention discloses a submersed type inspection well which comprises a well cover above the ground as well as a shaft and a well body structure below the well cover, wherein the traditional drainage pipe is arranged below the shaft, a foundation is arranged between the lower end of the shaft and the drainage pipe, and the lower end of the shaft, the upper end of the foundation and the pipe are poured into a whole; the diameter of the foundation is larger than the outer diameter of the shaft, and the bottom end of the foundation is located below the sheath of the traditional drainage pipe;and the bottom end of the foundation is inwards extended below the traditional drainage pipe. The invention also discloses a construction method for realizing the inspection well, which comprises thefollowing construction stages: (1) placing the inspection well; (2) submersing, joining and measuring the shaft; (3) manufacturing the foundation of the inspection well and communicating the shaft with the traditional drainage pipe; and (4) mounting a shaft cover plate and a ladder. By adopting the structure and the method of the invention, the inspection well is conveniently manufactured by adopting a submersed type construction method so as to be beneficial to carrying out long-distance jacking pipe construction and developing novel prefabricated inspection well structures and convenient for carrying out pipe engineering construction in downtown areas without excavating.
Owner:吴纪东 +1

Farmland ditch reinforcing ecological soil glue and preparation method thereof

The invention discloses farmland ditch reinforcing ecological soil glue and a preparation method thereof. The ecological soil glue comprises the following raw materials in parts by mass: 65-70 parts of deionized water, 5-8 parts of sodium carboxymethylcellulose, 5-8 parts of acrylic resin, 10-15 parts of an anti-permeation water repellent agent, 2-3 parts of bacillus mucilaginosus, 2-3 parts of alkaline protease, 2-3 parts of xanthan gum, 0.1-0.2 part of potassium sorbate and 0.1-0.2 part of a defoaming agent. After soil is mixed with the soil glue provided by the invention, the soil in a field can be improved, so that the soil hardens, has high compactness, is not afraid of water, is impermeable and is free of mud cake generating and mud-pumping; the improved soil is very stable and can bear rainy seasons, chilly and frosty climates and other climates; years of tests in many places show that the improved agricultural engineering soil is stable and is intact after the rainwater immersion, ridges are firm, ditches have high impermeability, and original ecological characteristics of the soil are maintained; and the ecological soil glue is low in cost and easy to construct. The ecological soil glue can be applied to repair and reinforcement of field roads and side slopes, dam construction engineering, reconstruction of non-grade agricultural tractor roads and other engineering.
Owner:贵州怡和瑞丰土地开发有限公司

Vetiveria zizanioides and grass blanket combination based green slope protection method

The invention discloses a vetiveria zizanioides and grass blanket combination based green slope protection method. The method comprises the steps of planting vetiveria zizanioides (1) on a side slope (3), laying the front end of a grass blanket (2) in an anchoring ditch (4), fixing the grass blanket (2) by using a fixing piece (5), then covering the ditch with soil and treading down the soil; laying the grass blanket (2) by expansion from top to bottom; and forming an opening by using a tool in a position where the vetiveria zizanioides (1) is met, sorting out the vetiveria zizanioides (1), arranging the grass blanket (2) flatly, and fixing the grass blanket (2) by using the fixing piece (5). According to the vetiveria zizanioides and grass blanket combination based green slope protection method, during the early stage, rainstorm is prevented from washing out the side slope and the unstable vetiveria zizanioides depending on an anti-washout function immediately generated after the grass blanket is laid; and during the later stage, with the degradation of the grass blanket, the projects such as the side slope and the like are protected from being washed out by atmospheric precipitation and surface runoff depending on a living protective layer formed by a dense and netty fibrous root system formed by gradual growth of the vetiveria zizanioides in the ground and a strong steam leaf hedge formed by gradual growth of the vetiveria zizanioides on the ground, thereby achieving the purposes of stabilizing a soil body, conserving water and soil, improving the environment and preventing disasters.
Owner:江苏天鹏蓝德草业生态技术有限公司

Ecological restoration method for steep slopes in abandoned mining zones

InactiveCN111771627AReduce washoutRemarkable effect on diversity restorationGrowth substratesCulture mediaEcological environmentPlanting seed
The invention relates to the technical field of ecological restoration, in particular to an ecological restoration method for steep slopes in abandoned mining zones. A large number of high cutting slopes are present in the abandoned mining zones, and hard rock formations, steep slopes and poor soil texture in the zones are difficult points for ecological restoration. According to the ecological restoration method, in order to realize three-dimensional greening of the steep slopes, and solve the ecological restoration problems of slope surfaces different in drop height and poor in stability, after a series of operations of soil preparation, planting base plate making, planting base plate laying, planting substrate proportioning, planting substrate laying, water supplement and final-period management, soil in each planting base plate is stable; plant seeds can drop down, and provenances are sufficient; moreover, supplemented species are all local native plants, and adapt to the ecological environment of the local zone, so that water and soil erosion is reduced, the survival rate is high, and the restoration effect in the aspects of vegetation coverage and species diversity is remarkable; geological disaster and hidden dangers including water and soil losses, damage and the like are completely eradicated, and after several years, the supplemented species are gradually fused with the natural ecology.
Owner:XINJIANG INST OF ECOLOGY & GEOGRAPHY CHINESE ACAD OF SCI

Gully head protection structure for developing erosion gully and construction method thereof

The invention relates to the field of prevention and control of gully head erosion, and provides a gully head protection structure for developing an erosion gully and a construction method thereof. The gully head protection structure for developing the erosion gully comprises a grit chamber, a slow flow tank, a draft tube, a stilling basin and a fixing screen which are arranged in sequence and arein communication in sequence along the water flow direction, wherein the grit chamber and the slow flow tank are arranged on the surface outside a gully head; the stilling basin and the fixing screenare arranged at the gully bottom in the gully head; one end of the draft tube is in communication with the slow flow tank; the other end of the draft tube is in communication with the stilling basin;and the two sides outside the grit chamber are provided with interception gullies for introducing runoff water into the grit chamber respectively. Through the adoption of the gully head protection structure, the problems of single prevention measure, relatively high treatment cost, high land disturbance, great occupation and relatively weak rain flood resistance in an existing treatment method are solved.
Owner:CHINA INST OF WATER RESOURCES & HYDROPOWER RES

Combined temporary cofferdam for crossing river channel and construction method of combined temporary cofferdam

The invention belongs to the technical field of cofferdam construction, and particularly relates to a combined temporary cofferdam for crossing a river channel and a construction method of the combined temporary cofferdam. The combined temporary cofferdam comprises a temporary cofferdam with a square cross section, the two ends of the temporary cofferdam correspond to the two banks of the river channel, and two inclined struts are arranged at the right-angle position of the temporary cofferdam; a square steel enclosing purlin is arranged on the inner side of the temporary cofferdam, a straight support is arranged in the middle of the square steel enclosing purlin and is parallel to the width direction of the square steel enclosing purlin, the temporary cofferdam is double-row cofferdams, each row of cofferdams are the same in structure, the two ends of each row of cofferdams are timber pile type cofferdams, and the middle of each row of cofferdams is a steel sheet pile type cofferdam; corresponding joints of the timber pile type cofferdams and the steel sheet pile type cofferdam are connected by welding seamless steel pipes and Z-shaped steel sheet piles; and a timber pile enclosing purlin is arranged on one side of the upper part of each row of timber pile type cofferdams correspondingly, and more than two opposite-pulling steel bars are bundled between a pair of timber pile enclosing purlins on the two rows of timber pile type cofferdams. Therefore, the temporary cofferdam is easy and convenient to construct, good in waterproof and anti-seepage performance and high in water flow impact resistance.
Owner:THE SECOND CONSTR OF CTCE GROUP +2

Novel building construction quality monitoring device and using method thereof

The invention discloses a novel building construction quality monitoring device, and belongs to the technical field of building construction. The invention discloses a novel building construction quality monitoring device and a using method thereof. The monitoring device comprises a distance sensor and a computer. A grouting machine is arranged on the outer side of the distance sensor. The distance sensor is fixedly connected with a distance measuring column through a connecting rod. The lower end of the distance measuring column is fixedly connected with a foundation. A vertical plate is arranged on the right side of the distance sensor. A bearing plate is arranged below the foundation. A grouting pit is formed in the lower side of the grouting machine, and the output end of the groutingmachine is fixedly connected with a connecting pipe. In the building construction process, the settlement condition of the foundation is detected in stages and fed back to technicians and constructorsin time, and when settlement reaches a certain degree, cement paste is injected into pre-buried devices of different layers to stabilize the foundation, so that the stability of the foundation is improved, and inclination and collapse accidents of a building are reduced.
Owner:刘成阜

Mechanical pipe jacking construction technology

The invention relates to the technical field of pipe jacking construction, and aims to provide mechanical pipe jacking construction technology, which includes lofting review; well construction; pipe jacking equipment and ground auxiliary facilities installation; pipe jacking equipment out of the working well; console preset jacking axis, The positional relationship between the head of the pipe jacking equipment and the jacking axis is displayed in the form of laser points. At the same time, the application background is equipped with a three-dimensional simulation model for simulating the construction process of pipe jacking; the application background obtains the construction process data of the console in real time, and input In the three-dimensional simulation model, the three-dimensional simulation model controls the background alarm; the operator adjusts the position of the head of the pipe jacking equipment until the position deviation between the laser point and the jacking axis is less than or equal to the preset value; Receiving well; jacking and unearthed. The invention has the effect of assisting operators in finding out the running direction of the machine head and adjusting the running direction of the machine head in time, so as to reduce the situation that the construction quality is affected by human errors during construction.
Owner:广州坚磊建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products