Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

44 results about "Suitability analysis" patented technology

Suitability Analysis is the process and procedures used to establish the suitability of a system – that is, the ability of a system to meet the needs of a stakeholder or other user. Before GIS (a computerized method that helps to determine suitability analysis) was widely used in the mid to late 20th century, city planners communicated their suitability analysis ideas by laying transparencies in increasing darkness over maps of the present conditions. This technique's descendant is used in a GIS application called multicriteria decision analysis. In the 1960s, a mechanism called the ecological inventory process was developed to document existing surrounding land conditions to help inform the analysis for the land in question. These mechanisms were computerized upon the advent of computers due to inefficiencies in the methods, such as the inability to overlay a large number of transparencies.

Method for establishing predicated response system based on wind turbine generator load database

ActiveCN104537424AQuick responseSolve the problem of slow response speedForecastingElectricityConsequence analysis
The invention discloses a method for establishing a predicated response system based on a wind turbine generator load database. The method comprises the following steps: (1) establishing a load database; (2) exploring a processing scheme of the load database, wherein the processing scheme comprises a first choice scheme and a secondary choice scheme, and the first choice scheme is a regression analysis method; and (3) analyzing and comparing a processing result of the first choice scheme and the processing result of the secondary choice scheme to establish a proper load prediction response system. The advantages and the disadvantages of the prior art are combined to quickly establish the proper prediction response system, the established prediction response system can solve a problem that a load adaptability analysis or anticipation method is low in response speed on model selection requirements, the quick response of the model selection and the micro-location selection of the wind turbine generator is realized through a quick "wind resource-load-strength-adaptability judgment" response mode of the predicated response system, the load situation of each point location can be quickly predicted to be obtained so as to basically realize the "refinement" of the load adaptability analysis.
Owner:BEIJING TIANYUAN SCI & TECH CREATION WINDPOWER TECH

Method for selecting new producing area of Chinese medical herb

The invention relates to the field of selecting and analyzing a new producing area of a Chinese medical herb and discloses a method for selecting the new producing area of the Chinese medical herb. The method comprises the following steps of: S1, obtaining ecological factors of an original producing area of the Chinese medical herb; S2, selecting main ecological factors which influence the quality of the Chinese medical herb from the ecological factors, and determining a weight coefficient of the main ecological factors; and S3, calculating an ecological similarity measurement index value of a selected area and the original producing area according to the main ecological factors and the corresponding weight coefficient; and if the ecological similarity measurement index value is less than a pre-set threshold value, determining the selected area as the new producing area of the Chinese medical herb. According to the method for selecting the new producing area of the Chinese medical herb disclosed by the invention, the numerical simulation and the quantified evaluation of the suitability analysis of the producing area of the Chinese medical herb can be carried out by using an ecological suitability principle and a multi-factor comprehensive evaluation model, and the accuracy is high.
Owner:INST OF MEDICINAL PLANT DEV CHINESE ACADEMY OF MEDICAL SCI

Analytical method of operation of large transformer with inconsistent three-phase parameters

The invention provides an analytical method of operation of a large transformer with inconsistent three-phase parameters. The analytical method includes the following steps: carrying out analytical calculation on parameters of a large three-phase transformer set, comparing the parameters with related indexes so as to analyze possibility of operation of the transformer with the inconsistent three-phase parameters, reutilizing electromechanical-electromagnetic simulation analog computation to analyze operation condition of the transformer set in a power grid and effects on other devices, further verifying possibility of grid-connected operation of the transformer set, and lastly working out related operation types and relay protection setting value adjusting schemes according to the result of analysis and emulation to conduct operation of the transformer set. According to the method, the effect of operation of the large transformer with the inconsistent three-phase parameters on the power grid can be completely and accurately analyzed, and corresponding operation types and the setting value protection adjusting schemes can be provided, so that safety and stability of the power grid in operation of the large transformer with the inconsistent three-phase parameters are guaranteed. The method can be applied to analysis of transformer accidental replacement and transformer back-up transformer applicability, and the like.
Owner:STATE GRID HUBEI ELECTRIC POWER RES INST +2

Method for evaluating equipment applicability of nuclear power plant security level instrumentation and control system

The invention relates to a method for evaluating the equipment applicability of a nuclear power plant security level instrumentation and control system, belongs to the technical field of nuclear powerplant security level instrumentation and control, and aims at solving the problem that in the prior art, an existing evaluation test result cannot be effectively applied to a new project for applicability analysis. According to the method, analysis is conducted on the basis of a result of project equipment completing an evaluation test, whether or not target project equipment meets application requirements is judged in theory, and inapplicable aspects are subjected to supplementary evaluation; the equipment applicability evaluation analysis dimensions, that are, the five dimensions of the quality assurance process, the system function performance, the product model and version, the test conditions and the application hardware configuration are defined, evaluation criteria for various dimensions and a difference item processing criterion are defined, manpower and material resources needing to the input for an evaluation test are greatly reduced, the evaluation cycle is shortened, precious time is won for successful conduction of a target project, and equipment evaluation result reusing of the same product under different application requirements can be achieved.
Owner:CHINA TECHENERGY +1

Correcting and controlling method of interconnecting structure for improving power-angle oscillation of hydroelectric generating set

InactiveCN101813053AMake full use of the essential characteristics of dynamicsImprove oscillation characteristicsHydro energy generationMachines/enginesHamiltonian modelPid control algorithm
The invention relates to a correcting and controlling method of an interconnecting structure for improving the power-angle oscillation of a hydroelectric generating set, comprising the following steps of: increasing the association factor of the power-angle of the set and the gate opening based on the structural matrix analysis of a Hamiltonian model of the hydroelectric generating set, i.e. increasing the association among the parameters based on dynamic mechanism inter-associated with the system and designing a corresponding control law to be equivalent to the change of the structure; putting forward the variable structure control policy combined by the algorithm of the invention and the conventional control algorithm to realize control of the set through analyzing the applicability of the equivalent control low; and putting forward corresponding solutions for the problems of controlling to output phase step and the like. Simulation shows that the control algorithm provided by the invention can improve the oscillation characteristic of the power-angle of the set effectively and maintain the stability of the set even under lower damp.
Owner:KUNMING UNIV OF SCI & TECH

Method for selecting earthquake information in well-seismic combination

The invention relates to a method for selecting earthquake information in well-seismic combination. By the method, the problems that earth information selection is complicated in manual operation andlow in forecast accuracy and is not suitable for subsequent exquisite adjustment demand after development during the well-seismic combination process are mainly solved. The method comprises the six steps of 1, analyzing forecast coincidence rate of a well and seismic storage layer according to a dense well pattern anatomic region; 2, analyzing a relation between the forecast coincidence rate and vertical sedimentary cycle; 3, analyzing a relation between the forecast coincidence rate and a quantitative geological condition of the storage layer; 4, determining an application deposition unit ofa well-seismic combination storage layer forecast technology by combining well-seismic combination applicability analysis conclusion, and further analyzing an application part on a plane in each unit;5, performing well and seismic storage layer forecast on the storage layer suitable for the well and seismic storage layer forecast technology; and 6, performing dynamic and static combination measure digging by employing a well and seismic storage layer forecast technology. By the method, the storage layer forecast technological process of the well and seismic combination deposition unit is built, reasonable utilization of earthquake result data is achieved, a single sand body is guided to exquisitely engrave, and an actual effect on development and adjustment measure digging at an ultrahighwater period after experiment application is achieved.
Owner:NORTHEAST GASOLINEEUM UNIV

Historical famous city new urban planning aided design system

The invention discloses a historical famous city new urban planning aided design system. The historical famous city new urban planning aided design system comprises a server and a user terminal, wherein the server establishes connection with a related department server to obtain city factor data based on user requirements and package a data processing method for multiple kinds of city factor dataand a related analysis method for population change monitoring in advance; the historical famous city new urban planning aided design system receives the requirements of a user for the to-be-studied area and data, obtains related city factor data, and obtains a corresponding data processing method for processing; the historical famous city new urban planning aided design system matches the city factor data according to the spatial position parameters; and the historical famous city new urban planning aided design system carries out new urban area site selection according to development suitability analysis and the estimated area, carries out environmental population capacity estimation on a new urban area, and then estimates new urban area development intensity on the basis of the environmental population capacity of the new urban area, so as to determine a new urban area development scheme accordingly, and visualize data obtained in the analysis process. According to the historical famous city new urban planning aided design system, the early-stage data preparation and preprocessing workload of the project can be reduced.
Owner:QINGDAO TECHNOLOGICAL UNIVERSITY

Magnetic evaluation method for irradiation accelerated stress corrosion cracking sensitivity of austenitic stainless steel

The invention belongs to the field of metal material detection, and particularly relates to a magnetic evaluation method for irradiation accelerated stress corrosion cracking sensitivity of austeniticstainless steel. The method comprises the following steps of: carrying out applicability analysis; carrying out sample processing and availability assessment; detecting saturation magnetization intensity Ms and corresponding magnetic field intensity Hs of a test sample under an irradiation condition to be evaluated; determining a zero IASCC sensitivity annealing condition; carrying out vacuum environment heat treatment on the irradiated test sample under a determined annealing condition; measuring an M-H curve of the annealed test sample to obtain a saturation magnetization MT,t correspondingto the saturation magnetic field intensity Hs of the test sample with zero IASCC sensitivity after irradiation; and calculating to obtain the IASCC sensitivity of the austenitic stainless steel undera certain irradiation condition. According to the invention, the corresponding IASCC sensitivity index can be obtained by measuring the Ms in the M-H curve under different conditions, so that the IASCC performance of the sample can be obtained quickly and accurately, and the method has the advantages of simplicity in operation, high efficiency, high reliability, good repeatability and small humanfactor.
Owner:SUZHOU NUCLEAR POWER RES INST +2

Gap measurement method for suitability analysis of head-mounted product

The invention relates to a gap measurement method for adaptability analysis of a head-mounted product, and the method comprises the following steps: selecting a to-be-measured product model and a standard head shape for measurement; superposing the product model on the standard head shape; sectioning the product model overlaid on the standard head shape to obtain a section graph; reading the profile graph to obtain a head profile curve and a model profile curve; and calculating to obtain the distance between any point of the head profile curve and the corresponding point of the model profile curve. The matching effect of the head-mounted product and the head shape can be visually displayed through the distance obtained through the calculation result. Different standard head types are replaced; different head types can be conveniently selected for wearing effect comparison; the quantized data for improving the adaptability of the head-mounted product can be provided, the situation thatthe experience is poor due to mutual interference between the head-mounted product and the head or too large gaps between the head-mounted product and the head is avoided, the user experience of the head-mounted product is effectively improved, the later availability test cost is saved, and the competitiveness of the head-mounted product is improved.
Owner:SOUTH CHINA UNIV OF TECH

Intelligent interactive ecological control line delimiting method and device

The invention discloses an intelligent interactive ecological control line delimiting method and device. The method comprises the steps that a survey region is selected, ecology suitability analysis is conducted on key elements of the survey region, spatial data of the key elements is obtained, and the ecology suitability analysis result is generated according to the spatial data; a GIS space analysis method is adopted, a preset protection region of the survey region is identified, and a preliminary ecological control line scheme is generated according to the preset protection region; on the basis of a space optimization model built in advance, according to the ecology suitability analysis result and the preliminary ecological control line scheme, ecological control line delimiting is conducted on the survey region by adopting an intelligent optimization algorithm, and the final ecological control line scheme of the survey region is obtained. Accordingly, ecological control line delimiting can be conducted objectively, the ecology suitability and pattern compactness are considered simultaneously, and the ecological control line scheme and existing ecological environmental planningresults can be reasonably and effectively connected and coordinated.
Owner:GUANGZHOU UNIVERSITY

Online planning and suitability analysis method and system for terrain-aided navigation matching area

The invention discloses an on-line planning and suitability analysis method for a terrain-aided navigation matching area. The method comprises the following steps: acquiring real-time terrain height information of a carrier and position, heading and error navigation information of the carrier on a digital map; planning a to-be-matched area on line in real time according to the navigation information; carrying out full-map suitability analysis on a pre-loaded digital map, and carrying out suitability analysis on the planned to-be-matched area; deciding whether to perform subsequent matching calculation or not according to the adaptation analysis result of the to-be-matched area; if the adaptation analysis result of the to-be-matched area meets the condition and enters a matching tracking mode, deciding whether the matching mode is switched or not according to the filtering divergence judgment criterion; and correcting the navigation information according to a matching calculation resultto complete terrain-aided navigation. According to the method, redundant calculation can be avoided through online real-time planning of the to-be-matched area, suitability analysis and tracking filtering judgment, the time consumption of terrain aided navigation is effectively reduced, and the positioning accuracy of the system is improved.
Owner:BEIHANG UNIV

A method of establishing a predictive response system based on wind turbine load database

The invention discloses a method for establishing a predicated response system based on a wind turbine generator load database. The method comprises the following steps: (1) establishing a load database; (2) exploring a processing scheme of the load database, wherein the processing scheme comprises a first choice scheme and a secondary choice scheme, and the first choice scheme is a regression analysis method; and (3) analyzing and comparing a processing result of the first choice scheme and the processing result of the secondary choice scheme to establish a proper load prediction response system. The advantages and the disadvantages of the prior art are combined to quickly establish the proper prediction response system, the established prediction response system can solve a problem that a load adaptability analysis or anticipation method is low in response speed on model selection requirements, the quick response of the model selection and the micro-location selection of the wind turbine generator is realized through a quick "wind resource-load-strength-adaptability judgment" response mode of the predicated response system, the load situation of each point location can be quickly predicted to be obtained so as to basically realize the "refinement" of the load adaptability analysis.
Owner:BEIJING TIANYUAN SCI & TECH CREATION WINDPOWER TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products