The invention discloses a novel large-
tonnage bridge girder erection
machine and a construction method thereof. The novel large-
tonnage bridge girder erection
machine comprises a main frame structure composed of a bridge girder erection
machine main girder, a main girder front-linkage straining beam, a main girder rear-linkage straining beam. The main frame structure is provided with a middle supporting device, a front auxiliary supporting device and a rear auxiliary supporting device which are sequentially connected. The novel construction method of the novel large-
tonnage bridge girder erection machine includes a bridge girder erection machine via hole process, a via hole and girder erection conversion process, a bridge girder erection machine girder erection process, a girder erection and via hole conversion process, a normal girder erection and
tail span conversion process, a variable span construction process, a small curved section construction process and a pack transferring construction process. The novel large-tonnage bridge girder erection machine achieves the purpose that a prefabricated bridge is mounted through the bridge girder erection machine under the conditions of a large span, a large tonnage, small curvature, various changes of the span and amplitude, frequent transferring and the like and has the advantages of being safe, efficient, easy to operate and maintain, good in stability, dispersed in construction load and the like.