Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

34results about How to "Reduce operation and maintenance risk" patented technology

Operation and maintenance safety auditing method and system

The invention discloses an operation and maintenance safety auditing method. The operation and maintenance safety auditing method comprises the following steps: receiving a login request sent by operation and maintenance personnel, and verifying the login request; if the verification is passed, obtaining and storing face image information of the operation and maintenance personnel in real time, and meanwhile recording an operation and maintenance operation on operation and maintenance target equipment in real time; verifying the identity of the operation and maintenance personnel in real time according to the face image information, and judging whether the operation and maintenance operation is an illegal operation; if the verification of the identity of the operation and maintenance personnel is wrong, and / or the operation and maintenance operation is the illegal operation, sending an alarm signal and / or interrupting the operation and maintenance operation; and carrying out correlation analysis on the face image information and the operation and maintenance operation, forming an operation and maintenance link, and carrying out audit according to the operation and maintenance link. Identity authentication can be carried out on the identity of the IT operation and maintenance personnel in an operation and maintenance personnel process, and the illegal operation and maintenance operation can be found in time. The invention further discloses an operation and maintenance safety auditing system.
Owner:STATE GRID CORP OF CHINA +2

Test platform establishment method based on virtualization technology

The invention discloses a test platform establishment method based on virtualization technology. The test platform comprises a physical server, a memory and a fiber switch, the VMware vSphere softwareis installed in the physical server for virtualizing the physical server and configuring the VMware vCenter as a management terminal of the entire virtualization environment, and the management terminal is used for managing the physical server and a virtual server; through the deployment process of the VMware vSphere virtualization software, and the test environment is established according to the VMware vSphere deployment documentation. In the test platform establishment method provided by the invention, the virtual environment architecture is adopted, the diverse test environment that meetsthe needs of operation and maintenance can be quickly established according to the needs of the operation and maintenance works so as to meet the IT hardware needs of different operation and maintenance works, the test platform establishment method has the advantages of being fast and flexible, reducing the workload of the operation and maintenance personnel, improving the operation and maintenance efficiency, and reducing the operation and maintenance risk to ensure the stable operation of the information system by changing the operation of the application system, namely, firstly verification and secondly implementation.
Owner:YUXI POWER SUPPLY BUREAU OF YUNNAN POWER GRID

Data node heartbeat detection algorithm of distributed transaction database

The invention discloses a data node heartbeat detection algorithm of a distributed transaction database. The data node heartbeat detection algorithm comprises the following steps: step 1, a heartbeatdetection table heartbeat is arranged on a storage node main library and a storage node standby library of a calculation node of the distributed transaction database; 2, a computing node main serviceof a distributed transaction database computing node is set to send a UPDATE operation to a storage node main library every one second in a default mode to judge whether a normal data access service can be achieved or not; 3, when the first UPDATE operation sent to the storage node main library by the computing node main service of the computing node of the distributed transaction database does not obtain a return result within a default interval of 1 second; step 4, the current storage node main library of the computing node main service of the computing node of the distributed transaction database is degraded into a fault state; and step 5, fault recovery between the storage node main library and the storage node standby library is finished. According to the invention, the availability of data service and the reliability of data security can be ensured to be greatly improved.
Owner:上海热璞网络科技有限公司

Wind turbine and its transmission

The invention provides a wind turbine generator set and its transmission device. The transmission device includes a transmission shaft system, a gear box and a generator. The front end of the transmission shaft system is connected to the hub of the wind wheel of the wind turbine generator set, and the input end of the gear box is connected to the transmission shaft. The rear end of the transmission system is connected, and the output end of the gear box is connected with the input end of the generator; a bearing is shared between the transmission shaft system and the gear box and / or a bearing is shared between the gear box and the generator. The present invention implements a semi-integrated design between the transmission shaft and the gearbox and / or between the gearbox and the generator, that is, the transmission shaft and the gearbox share a bearing, and / or the gearbox and the generator A single bearing is shared between them to achieve a compact structure layout, effectively making up for the shortcomings of the complex structure, low reliability and high cost of the current wind turbine; at the same time, it reduces the size of each component of the unit, reduces manufacturing and transportation costs, and realizes detachable maintenance. Reduce operational risk.
Owner:SHANGHAI ELECTRIC WIND POWER GRP CO LTD

Intelligent river surge sewage disposal system and control method

The invention belongs to the technical field of riverway sewage disposal instruments, and discloses an intelligent river surge sewage disposal system and a control method. A water surface part of a double-layer sewage interception net is a plastic float type movable trash rack, an underwater part of the double-layer sewage intercepting net is a spun yarn net and a semi-open flow guide pipe groove, and the spun yarn net is vertically hung on the plastic float type movable trash rack; the double-layer sewage intercepting net is mounted in a river surge in a V shape, and the automatic fishing equipment is mounted at the V-shaped bottom of the double-layer sewage intercepting net; and a solar power generation system is fixed to the top end of the automatic fishing equipment, and an intelligent visual monitoring device is fixed to the automatic fishing equipment. According to the intelligent river surge sewage disposal system, water surface and underwater double-layer sewage interception is achieved, water surface and underwater floating objects can be cleaned at the same time, and small floating objects flow to the automatic fishing equipment under the action of water flow so as to be cleaned. According to the intelligent river surge sewage disposal system, the intelligent cleaning process can be realized, the garbage information in the river surge can be automatically monitored, and the cleaning behavior can be automatically carried out, so that the garbage in the river surge can be timely and accurately cleaned and de-artificial.
Owner:SOUTH CHINA UNIV OF TECH +1

Cluster operation and maintenance state diagnosis method, operation and maintenance monitoring system, terminal and storage medium

ActiveCN111880993AImprove cluster operation and maintenance efficiencyImprove professional skillsHardware monitoringNon-redundant fault processingClustered dataDaily operation
The invention discloses a cluster operation and maintenance state diagnosis method which comprises the steps: acquiring the current actual value of at least one piece of cluster operation and maintenance data, wherein the cluster operation and maintenance data comprises at least one piece of daily operation and maintenance data, cluster monitoring data, use specification data and cluster log data;obtaining the operation and maintenance data volume of the cluster according to the at least one piece of cluster data, and adjusting at least one preset threshold value and a preset repair suggestion according to the operation and maintenance data volume; obtaining a standard threshold range corresponding to each piece of cluster operation and maintenance data, and judging whether the current actual value of each piece of cluster operation and maintenance data exceeds the corresponding standard threshold range or not; if yes, obtaining a corresponding final repair suggestion according to thecurrent actual value; and displaying a diagnosis result, wherein the diagnosis result comprises the name and meaning of each piece of cluster operation and maintenance data, whether the name and meaning exceed a corresponding standard threshold range and / or repair suggestions. The invention further discloses an operation and maintenance monitoring system, a terminal and a storage medium. The cluster operation and maintenance efficiency can be improved, and the operation and maintenance risk is reduced.
Owner:PING AN TECH (SHENZHEN) CO LTD

Non-welding connection structure of fan tower platform

The invention discloses a non-welding connection structure of a fan tower platform. The non-welding connection structure comprises a suspension assembly and an anti-swing support assembly, wherein thesuspension assembly consists of a suspension screw rod, a welding force bearing plate, a lower locking nut and an upper locking nut, wherein the two ends of the suspension screw rod are provided withthreads correspondingly, the thread of one end of the two ends is in matched connection with a threaded hole in the inner end surface of a tower flange, and is fastened by using the upper locking nut, the welding force bearing plate is connected with the other end of the suspension screw rod in a welding mode, the tower platform is arranged on the welding force bearing plate, platform pressure isborne by the welding force bearing plate, and the lower locking nut is used for fastening; and the anti-swing support assembly is composed of a supporting base, a supporting screw rod, a rubber gasket and a locking nut, wherein the supporting base is welded at the edge of the tower platform, one end of the supporting screw rod is provided with threads, the other end of the supporting screw rod isa circular truncated cone with an increased stress area, after the rubber gasket is glued on the end face of the circular truncated cone and then the end face of the circular truncated cone abuts against the wall of a tower, the supporting screw rod is fixed on the supporting base through the locking nuts. According to the non-welding connection structure, the fatigue performance of the tower canbe improved, and the material cost of the tower can be reduced.
Owner:GUANGDONG MINGYANG WIND POWER IND GRP CO LTD

A kind of optical transmission system synchronization test method

The invention discloses a synchronization testing method for light transmission system, and solves problems of different-place synchronization reference measurement errors and limited testing conditions. The method comprises the following steps: starting a clock test instrument to output a clock signal, and inputting the clock signal to an external synchronization input interface of a local network element; setting the local network element so that a signal of the external synchronization input interface is outputted as a line clock through a synchronization device timing generator output interface, and transmitting the signal to line network elements; setting each the line network element so that a signal of a line signal input interface is outputted as a line clock through the synchronization device timing generator output interface, and transmitting the tested signal to the local network element or the next line network element; setting the local network element so that the line signal input interface signal is outputted as a tested signal through the external synchronous output interface, and inputting the tested signal to the clock test instrument. The invention also proposesa corresponding testing system. The method and system improve the system test accuracy and get rid of the limitations from a test source and a test reference point.
Owner:CHINA ACADEMY OF INFORMATION & COMM

High-availability monitoring and management device and redundant switching method for high-density blade server

The invention discloses a high-availability monitoring and management device and a redundant switching method for high-density blade servers. The device of the invention includes a master CMU and a slave CMU, a total of two redundantly arranged frame management units, the master CMU and the slave CMU. There are two communication links between them, and the two communication links include a first communication link for sending a heartbeat message containing equipment status information and a second communication link for sending a remedial heartbeat message containing equipment status information. road. The invention can ensure the ability of remote monitoring and management of all components, ensure the normal operation and maintenance of high-density blade servers, can greatly reduce the risk of operation and maintenance, can solve the phenomenon of "brain split", and can transmit equipment status through heartbeat messages and remedial heartbeat messages. It can comprehensively judge the status of the master CMU and the slave CMU to avoid the problem of switching without switching or switching without switching, which can greatly improve the availability of the high-density blade server monitoring and management system.
Owner:NAT UNIV OF DEFENSE TECH

Article transportation method and device, computer equipment and storage medium

The invention relates to an article transportation method and device, computer equipment, a storage medium and a computer program product. The method comprises the steps that when the automatic article conveying system is deployed in a target area, if an article transportation task is obtained, whether the article transportation task is a direct task or not is determined according to an article initial position and an article final position; the target area is an area with the track length smaller than a preset value relative to the length of the operation area; if the goods transportation task is a non-direct task, obtaining the position of a target transfer goods location; splitting the article transportation task into a first task and a second task according to the position of the target transfer goods location, the initial position of the article and the final position of the article; the first stacking machine is controlled to execute the first task; and after first task completion information returned by the first stacking machine is received, the second stacking machine is controlled to execute the second task. By adopting the method, the working efficiency of the one-rail double-vehicle automatic article conveying system can be improved, and the operation and maintenance risk of the article conveying system is effectively reduced.
Owner:LONGYAN CIGARETTE FACTORY

Optical network synchronization test method and system

The invention discloses an optical network synchronization testing method and system, and solves a problem that the synchronization references of different places are not consistent. The system comprises a clock interface unit, an optical monitoring channel processing unit, a clock reference source, and a synchronization testing instrument. The method comprises the steps: generating a frequency reference signal by using a clock reference source, generating a time reference signal as an external synchronization signal by using the synchronization testing instrument, inputting the external synchronization signal into a clock interface unit of a local network element, generating a line synchronization signal, then packaging the signal to an optical monitoring channel signal, and transmittingthe signal to a line network element; setting the line network element, and transmitting the line synchronization signal through a line optical monitoring channel processing unit until the line synchronization signal is transmitted to a local optical monitoring channel processing unit; setting the local optical monitoring channel processing unit to recover the line synchronization signal from theoptical monitoring channel signal, then recovering the external synchronization signal as a tested signal by the clock interface unit, and inputting the tested signal into the synchronization testinginstrument. The method improves the accuracy, avoids the constraint of onsite conditions, and reduces the cost.
Owner:CHINA ACADEMY OF INFORMATION & COMM +3

Automatic operation and maintenance platform adaptation method and device, equipment, storage medium and product

The invention provides an automatic operation and maintenance platform adaptation method, and relates to the field of automatic operation and maintenance. The automatic operation and maintenance platform adaptation method comprises the following steps: creating an operation and maintenance scene; generating a plurality of operation and maintenance actions according to the operation and maintenance scene, and permutation and combination of the plurality of operation and maintenance actions according to a specific sequence to form a to-be-executed task; obtaining a to-be-executed task, packaging the to-be-executed task, and issuing the to-be-executed task after the task format is adapted; and decoding and storing the information of the to-be-executed task, carrying out parameter entry processing and analysis, and executing the task script. An adaptation layer is added between an operation and maintenance platform and a scene layer, the difference of a bottom-layer automatic operation and maintenance platform is shielded, on the premise that the operation and maintenance platform does not need to be transformed, corresponding plug-ins are developed in the adaptation layer to complete butt joint with the operation and maintenance platform, and the arrangement mode and capacity of the operation and maintenance platform are expanded to a certain extent according to the personalized requirements of the scene layer. The invention further provides an automatic operation and maintenance platform adaptation device, equipment, a storage medium and a product.
Owner:CHINA CONSTRUCTION BANK

A non-invasive JVM thread stack collection method and device

The invention provides a non-invasive JVM thread stack collection method and device, and the method comprises the steps: enabling a user side to load an Agent package through setting java Agent parameters when deploying an application; Initializing an Agent packet to establish a connection channel between the JVM process and the registration center, and generating a channel ID and channel establishment time; Storing the channel ID and the channel establishment time in a channel cache; Sending a request for inquiring a JVM thread stack to a registration center, wherein the request comprises a JVM process name; According to the JVM process name, obtaining a corresponding channel ID from a channel cache, and sending a request for obtaining thread stack information to a target JVM process; Andreading the thread stack information and returning the thread stack information to the user side according to the request for obtaining the thread stack. The method has the technical effects that a non-invasive mode technology is provided for JVM thread stack collection through a javaAgent mechanism of the JVM, the target JVM process is quickly positioned through linkage with a registration center, a target server does not need to be logged in, and the collection threshold and the operation and maintenance risk are reduced.
Owner:GUANGDONG ESHORE TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products