The present invention provides a modular, multifunctional
karst collapse physical
simulation experimental platform, including a
rigid frame, a bearing device, a
mobile device, a loading device, a lifting device, a
pile foundation construction dynamic load
simulation device, a ground vehicle dynamic load
simulation device, a
rainfall simulation device, a
computer vision monitoring device, a
groundwater pumping simulation device, and an
underground space excavation disturbance simulation device. The
mobile device is arranged on the bearing device, the lifting device, the loading device, and the
pile foundation construction dynamic load simulation device are arranged on the
mobile device, the vehicle dynamic load simulation device is connected to the traction device of the
mobile vehicle, and the camera monitoring device and the
rainfall simulation device are arranged on the
rigid frame through a bracket. The present invention fully considers the key disaster-causing conditions in the
urban environment, covers a wide range of working scenarios, and has strong applicability; the overall
modular design is adopted, and each module can be flexibly loaded according to demand, which can more realistically simulate the real environment and reproduce the catastrophic evolution process of ground collapse.