The present application relates to the technical field of
curtain wall construction, and particularly relates to a
curtain wall transfer floor vertical
keel elevation fine adjustment device and a construction method. The present application comprises a fixing
assembly, an adjusting
assembly and a receiving
assembly, the fixing assembly and the receiving assembly are respectively arranged at two ends of the fixing assembly, the fixing assembly is clamped on a building ring beam, the adjusting assembly and the receiving assembly are arranged on the outer surface of the building, a fine adjustment bolt is arranged on the fixing assembly, the fine adjustment bolt vertically contacts the top of the ring beam and is threadedly connected with the fixing assembly. The fixing assembly is used for fixing on the building structure, conveniently temporarily fixing the vertical
keel, the adjusting assembly enables the present application to be applicable to the installation of vertical keels of various specifications, the receiving assembly is used for supporting the
keel, conveniently installing the vertical keel, the fine adjustment bolt is used for finely adjusting the vertical installation position of the vertical keel, improving the keel installation precision, effectively reducing the alignment
operation time in the basket during keel installation, and reducing the construction difficulty.