The application discloses a kind of multi-source operation and maintenance resource intelligent scheduling method and
system for power
system fault
recovery, the method extracts fault alarm data and resource state data from dispatch
management system, constructs fault
recovery task set;Then the multi-dimensional attributes such as
skill level, historical success rate, geographic location and
equipment state are calculated to obtain the comprehensive value of operation and maintenance resource capability, and the resource collaborative closeness value matrix is constructed according to the historical cooperation
record;On this basis, the comprehensive scheduling value function is constructed with the core of capability matching value and team collaborative value, and the safety constraint penalty term is embedded;Finally, the optimal response
algorithm driven by iterative migration-exchange double operator is adopted, and the Nash equilibrium scheduling scheme is converged in polynomial time, and the complete scheduling strategy containing resource
list, task sequence and safety check result is output.The application can significantly improve the efficiency of fault
recovery, reduce the conflict rate of cross-regional scheduling, and is suitable for complex
power grid fault repair scenarios of 110kV and above
voltage level.