The invention discloses a raise-boring
machine construction method. The raise-boring
machine construction method includes the steps of construction preparation, drilling
machine mounting and construction. The construction preparation step includes building a drilling machine base, digging a
pool at a position with a certain distance from the drilling machine base, and digging two
sedimentation ditches between a drilling center and the
pool, wherein one of the
sedimentation ditches is connected with the
pool. The drilling machine mounting step includes coinciding the rotating center of a
drill bit with the center line of a drilling machine and fastening a gap clamp, wherein a rectangular thread is clamped by the gap clamp when a screw is demounted in place during vertical drilling or drilling machine withdrawal. The construction step includes drilling a hole downwardly by a guide
drill 201mm in
diameter, and reaming a hole by a
reamer bit 1200mm in
diameter after communication. The raise-boring machine construction method has the advantages that conveying sequence of a main machine of the raise-boring machine can be adjusted correspondingly according to space size and mine conditions of a construction place, so that construction is performed effectively and rapidly; the two
sedimentation ditches are dug, so that effective sedimentation of
slurry brought out by flushing fluid is enhanced, and in-place flushing of the
slurry of the
drill holes is guaranteed.