The invention discloses a frog, a preparation method thereof and a railway turnout, and relates to the technical field of rail transit. The frog comprises a point rail and two side rails located on the two sides of the point rail, the side rails are wing rails or inlaid blocks, each of the point rail and the side rails comprises a base and a multi-layer structure deposited on the base layer by layer, and each layer of structure is formed by alternately arranging first welding wires and second welding wires side by side; and the second welding wire (high-hardness wear-resistant welding wire) is used for supporting a framework, the friction resistance and the wear resistance are enhanced, and the first welding wire (high-toughness welding wire) is used for absorbing energy, buffering, toughening and resisting cracks. According to the frog, limitation of homogeneous materials is broken through, generation and extension of micro cracks in a frog wheel-rail load transfer area can be effectively hindered, stripping and chipping phenomena are inhibited, the damage probability is reduced, and therefore the online service life of the frog is prolonged.