Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

37results about How to "Known method" patented technology

Sonochemical leaching of polycrystalline diamond

A method for accelerated leaching of binder-catalyst material from the polycrystalline diamond structure of a PDC is disclosed. The PDC is sonochemically leached. Also disclosed are fixture, equipment and a system for sonochemically leaching the polycrystalline diamond structure of a PDC.
Owner:GEN ELECTRIC CAPITAL

Method for characterizing a geological formation traversed by a borehole

Methods for characterizing a geological formation, the methods include retrieving measured data provided by a measuring tool along one or more logged borehole length for a borehole, another borehole or both in order to produce a borehole imaging log. Selecting depth-defined intervals of the borehole imaging log as training images for inputting in a multi-point geostatistical model. Determining pattern based simulations for each training image using a pixel-based template of the multi-point geostatistical model so as to obtain training image patterns. Using the pattern based simulation of each training image to assign to each of the training image a corresponding training image pattern. Constructing from the training image patterns one or more fullbore image log of a borehole wall of the borehole. Repeat the second to fourth steps through the one or more logged borehole length in order to construct fullbore images from successive, adjacent training images.
Owner:SCHLUMBERGER TECH CORP

Method and apparatus for scanning feet for the purpose of manufacturing orthotics and other footwear

Measurements for corrective footwear, orthopedics, and orthotics have traditionally been obtained through three-dimensional casts of a foot. Digital technology opens an avenue of utilizing a digital image in place of the cast. Using a single or dual flatbed scanner and a computer, all the data required to construct a corrective device may be obtained from a scan or scans of the foot. Observed features and color variations, as well as physical measurements are used to overcome imperfections of a patient's foot.
Owner:FOOT LEVELERS

Multipoint geostatistics method using branch runlength compression

ActiveUS20090164182A1Improves known multipoint geostatistics method shortcomingShort timeDigital computer detailsSeismologyRelevant informationAlgorithm
A multipoint geostatistics computer-implemented method for modeling of discrete properties, comprising acquiring by a computer software program a training image made from at least one dimensional array of discrete property values, the values depicting the spatial relationship and variability considered to be typical of a n-dimensional surface to be modeled; constructing a search tree, the tree representing the probability of occurrence of combinations of values of a discrete property value, the construction being performed by counting these occurrences in the training image. The non-branching sequences of the search tree are compressed to what essentially amounts to a single node, by keeping only the relevant information the sequences contain.
Owner:SCHLUMBERGER TECH CORP

Image forming apparatus providing user support in sleep mode

An image forming apparatus that can support the user in sleep mode is provided. When the apparatus enters sleep mode, guidance information is displayed on an electronic paper. The electronic paper maintains displayed contents even when power is not supplied and, therefore, even when power is not supplied to a display panel in the sleep mode, the display for the user is continuously given, thereby supporting the user.
Owner:SHARP KK

Method for Planning a Cellular Mobile Telecommunications Network

A method for planning a cellular mobile telecommunications network includes at least one network cell and is intended to provide network services to users located in the network cell. The method includes: a) initializing, for the at least one network cell, a service area and a transmission power for each user equipment; b) estimating a total power received by the at least one network cell from user equipment located in the service area and using the at least one network service; c) based on the estimated total received power, varying the transmission powers required to user equipment located in the service area in order to reach a target quality of service constraint for the at least one network service; d) iterating the steps b) and c) until a stability condition is reached wherein the transmission power variation for at least a predetermined fraction of the user equipment is lower than a predetermined threshold; e) calculating a total received power corresponding to the transmission powers at the end of step d); f) calculating an uplink load factor corresponding to the total received power calculated in step e); g) ascertaining whether the calculated uplink load factor is lower than a maximum uplink load factor, and, in the negative case: h) restricting said service area; and i) repeating the steps from b) to g).
Owner:TELECOM ITALIA SPA

Multilayer label and method of making the same

A multiple layer label and a method of making the same are provided. Specifically, a label having a base layer for adhering to a container is provided wherein the label has an overcoat layer having an end that is removably adhered to the container. Moreover, the end that is removably adhered to the container is grasped by a user of the label and pulled, thereby removing the end of the overcoat layer from the container and swinging the layer away from the remainder of the label and exposing sublayers beneath the overcoat layer. The overcoat layer is adhered directly to the base layer, and at least portions of the sublayers. Each of the overcoat layer, sublayers, and the base layer may have indicia printed thereon for communicating information.
Owner:WEBER MARKING SYST

Method for regulating the generator voltage in a motor vehicle

A method for regulating a generator in a motor vehicle, in which the generator feeds a vehicle power supply system having loads and having at least one battery, with a regulator regulating the generator output voltage at the value of a nominal value voltage. In a recuperation readiness mode, the nominal value voltage is preset as a function of the driving state variables such that, during braking or when the vehicle is overrunning, electrical power is fed into the vehicle power supply system. Switching takes place between the recuperation readiness mode and a recovery mode as a function of predetermined switching conditions, with the nominal value voltage in the recovery mode being preset such that the battery is regenerated.
Owner:BAYERISCHE MOTOREN WERKE AG

Method of widely linear turbo-equalization in a multi-user context and for a multi-channel multi-antenna receiver

A method of equalizing a signal received by a plurality of antenna elements, the received signal being produced by the transmission of signals by a plurality of transmitters, includes: a step of converting the received signal into the frequency domain; a step of subtracting from the signal an estimate of the intersymbol interference and the interference between users so as to obtain a complex corrective signal; a step of conjoint widely linear filtering of the complex corrective signal and the conjugate complex corrective signal to obtain an equalized signal; a step of converting the equalized corrective signal into the time domain; a step of calculating coefficients of the at least one equalizer filter from the covariance matrix and the pseudo-covariance matrix of the received signal.
Owner:THALES SA

Moisture sensor with capacitive moisture measuring element and method of determining air humidity

In a method of determining air humidity, a capacitive moisture measuring element (2) used in a moisture sensor for calculation operations is modelled by a parallel circuit of an ideal capacitor (C) and an ohmic resistance (Rp). Charging and / or discharging of the capacitive moisture measuring element (2) by way of a first measuring resistor (R1; RA) provides for ascertaining a first time constant or a first period duration of the charging and / or discharging operation, and charging and / or discharging of the moisture measuring element (2) by way of a second measuring resistor (R2; RA / / R) provides for ascertaining a second one. The capacitance (C) of the moisture measuring element (2) is then calculated from the two time constants or the two period durations, a value for the moisture level finally being ascertained from the capacitance. This method achieves a higher level of measuring accuracy on the part of the moisture sensor.
Owner:SIEMENS SWITZERLAND

Intelligent color to texture converter

A method for preserving color information in a black and white version of a color image includes the analysis of the color image. The analysis comprises a search for conflicting colors. Conflicting colors are colors that are normally transformed to the same gray level in a black and white version of the image. One embodiment, working in a CIELAB color space includes the use of a three dimensional histogram for detecting predominant colors having the same luminance. Such colors are classified as conflicting colors. Modulations are added to the gray scale versions of conflicting colors in order to make them distinguishable. Modulation is only applied to conflicting colors thereby minimizing any deleterious effect and allowing the method to be applied in a “walk up mode” of an image processor. An image processor operative to perform the method includes an image analyzer operative to find and classify conflicting colors in the color image, and a gray scale modulator operative to add modulations to gray scale versions of only the conflicting colors within a gray scale version of the color image.
Owner:XEROX CORP

Method for characterizing a geological formation traversed by a borehole

Methods for characterizing a geological formation, the methods include retrieving measured data provided by a measuring tool along one or more logged borehole length for a borehole, another borehole or both in order to produce a borehole imaging log. Selecting depth-defined intervals of the borehole imaging log as training images for inputting in a multi-point geostatistical model. Determining pattern based simulations for each training image using a pixel-based template of the multi-point geostatistical model so as to obtain training image patterns. Using the pattern based simulation of each training image to assign to each of the training image a corresponding training image pattern. Constructing from the training image patterns one or more fullbore image log of a borehole wall of the borehole. Repeat the second to fourth steps through the one or more logged borehole length in order to construct fullbore images from successive, adjacent training images.
Owner:SCHLUMBERGER TECH CORP

Screw-Type Solid Bowl Centrifuge

A screw-type solid-bowl centrifuge including a rotatable drum having a tapering portion and a cylindrical portion. The rotatable screw includes a screw body, at least one main screw blade surrounding the screw body and forming a plurality of screw flights. The plurality of screw flights forms a conveying path configured to transport a material to be processed in the centrifuge. Two blade segments are arranged in the conveying path in portions of the plurality of screw flights. The at least one main screw blade is provided in a region of the blade segments that includes clearances configured to allow a throughflow of the material to be processed to flow between adjacent screw flights.
Owner:GEA MECHANICAL EQUIP

Multipoint geostatistics method using branch runlength compression and local grid transformation

A multipoint geostatistics computer-implemented method for modeling of discrete properties, comprising acquiring by a computer software program a training image made from at least one dimensional array of discrete property values, the values depicting the spatial relationship and variability considered to be typical of a n-dimensional surface to be modeled; constructing a search tree, the tree representing the probability of occurrence of combinations of values of a discrete property value, the construction being performed by counting these occurrences in the training image. The non-branching sequences of the search tree are compressed to what essentially amounts to a single node, by keeping only the relevant information the sequences contain.
Owner:SCHLUMBERGER TECH CORP

Moisture sensor with capacitive moisture measuring element and method of determining air humidity

In a method of determining air humidity, a corrected moisture signal is calculated for a moisture signal (Hi) ascertained from electrical properties of a capacitive moisture measuring element. In a measuring phase (30) with rising relative air humidity (RH), the corrected moisture signal is the current moisture signal (Hi) increased by a correction value, whereas in a measuring phase (31) with falling relative air humidity (RH) the corrected moisture signal is the current moisture signal (Hi) reduced by a correction value. Depending on the respective properties of the moisture measuring element and the required degree of measuring accuracy, the correction value is constant or is taken into consideration in dependence on the relative air humidity RH. This method provides a higher level of measuring accuracy with a moisture sensor equipped with the moisture measuring element.
Owner:SIEMENS SWITZERLAND

Method of compensating for gradient induced eddy currents in NMR imaging apparatuses

A method of compensating for eddy currents induced by the switching on and off magnetic fields in gradient coils in NMR imaging apparatuses, which method includes at least one compensation cycle including the steps of performing at least one detection of the magnetic field generated by the current flowing in a gradient coil, i.e., a gradient field; extrapolating the course of the effectively generated gradient field from the data of said at least one detection; generating a gradient fields excitation current compensating the eddy current effects on the gradient fields on the basis of the comparison of the effectively generated gradient fields and of the target gradient field.
Owner:ESAOTE

Integrated rotation rate and acceleration sensor and method for manufacturing an integrated rotation rate and acceleration sensor

A micromechanical device having a main plane of extension includes a sensor wafer, an evaluation wafer, and an intermediate wafer situated between the sensor wafer and the evaluation wafer, the evaluation wafer having at least one application-specific integrated circuit. The sensor wafer and / or the intermediate wafer includes a first sensor element and a second sensor element spatially separated from the first sensor element, the first and second sensor elements being respectively located in a first cavity and a second cavity each formed by the intermediate wafer and the sensor wafer, a first gas pressure in the first cavity differing from a second gas pressure in the second cavity, and the intermediate wafer having an opening at a point in a direction perpendicular to the main plane of extension.
Owner:ROBERT BOSCH GMBH

Image forming apparatus providing user support in sleep mode

An image forming apparatus that can support the user in sleep mode is provided. When the apparatus enters sleep mode, guidance information is displayed on an electronic paper. The electronic paper maintains displayed contents even when power is not supplied and, therefore, even when power is not supplied to a display panel in the sleep mode, the display for the user is continuously given, thereby supporting the user.
Owner:SHARP KK

Screw-type solid bowl centrifuge

A screw-type solid-bowl centrifuge including a rotatable drum having a tapering portion and a cylindrical portion. The rotatable screw includes a screw body, at least one main screw blade surrounding the screw body and forming a plurality of screw flights. The plurality of screw flights forms a conveying path configured to transport a material to be processed in the centrifuge. Two blade segments are arranged in the conveying path in portions of the plurality of screw flights. The at least one main screw blade is provided in a region of the blade segments that includes clearances configured to allow a throughflow of the material to be processed to flow between adjacent screw flights.
Owner:GEA MECHANICAL EQUIP

Method for planning a cellular mobile telecommunications network

A method for planning a cellular mobile telecommunications network includes at least one network cell and is intended to provide network services to users located in the network cell. The method includes: a) initializing, for the at least one network cell, a service area and a transmission power for each user equipment; b) estimating a total power received by the at least one network cell from user equipment located in the service area and using the at least one network service; c) based on the estimated total received power, varying the transmission powers required to user equipment located in the service area in order to reach a target quality of service constraint for the at least one network service; d) iterating the steps b) and c) until a stability condition is reached wherein the transmission power variation for at least a predetermined fraction of the user equipment is lower than a predetermined threshold; e) calculating a total received power corresponding to the transmission powers at the end of step d); f) calculating an uplink load factor corresponding to the total received power calculated in step e); g) ascertaining whether the calculated uplink load factor is lower than a maximum uplink load factor, and, in the negative case: h) restricting said service area; and i) repeating the steps from b) to g).
Owner:TELECOM ITALIA SPA

Target indentification method using cepstral coefficients

A method of identifying an unknown target comprising creating a density function of cepstral coefficients for a known target; receiving a signal from the unknown target; transforming the signal from a time spectrum to a frequency spectrum using a Fourier transform; transforming the frequency spectrum to a cepstrum; creating a density function of cepstral coefficients for the unknown target; and comparing the density function of the unknown target with the density function of the known target.
Owner:NAVY U S OF AMERICA AS REPRESENTED BY THE SEC OF THE THE

Carbon nanotubes nanocomposites for microfabrication applications

A composite epoxy resin consisting in a SU-8 epoxy resin, a solvent, with or without photoinitiator and carbon nanotubes in powder. When the resin is combined with the carbon nanotubes, the mechanical, thermal and electrical properties of the nanocomposite are enhanced. That offers a wide range of composites which can be used with different micro-fabrication techniques, such as: lamination, spin-coating, spraying and screening for assembly, interconnect and packaging applications.
Owner:ECOLE POLYTECHNIQUE FEDERALE DE LAUSANNE (EPFL)

Method for determining priority-dependent computing-time distribution in a priority-controlled multiprocess computing system

A method for determining priority-dependent computing time distribution in a priority-controlled multiprocess computing system, comprising the following steps: creation of a measuring process with a given computing time and a given priority; repeated execution of said measuring process during a given measuring time period; determination of the number of executions of said measuring process within the measuring time period and determination of the priority-dependent computing time distribution according to the number of executions of the measuring process during the measuring time period and the given computing time of the measuring process.
Owner:SIEMENS AG

Roll compensation system for rail vehicles

A rocking compensation system for rail vehicles includes actuators which are arranged within primary helical compression springs of bogies for a targeted height adjustment of a bogie frame of the bogie.
Owner:SIEMENS MOBILITY AUSTRIA GMBH

Method of widely linear turbo-equalization in a multi-user context and for a multi-channel multi-antenna receiver

A method of equalizing a signal received by a plurality of antenna elements, the received signal being produced by the transmission of signals by a plurality of transmitters, includes: a step of converting the received signal into the frequency domain; a step of subtracting from the signal an estimate of the intersymbol interference and the interference between users so as to obtain a complex corrective signal; a step of conjoint widely linear filtering of the complex corrective signal and the conjugate complex corrective signal to obtain an equalized signal; a step of converting the equalized corrective signal into the time domain; a step of calculating coefficients of the at least one equalizer filter from the covariance matrix and the pseudo-covariance matrix of the received signal.
Owner:THALES SA

Sprinkler fitting attachment device

Apparatus and methods for attachment of a fire protection sprinkler fitting to the wall-ceiling junction of existing buildings. In a J-fitting assembly of a sprinkler system is coupled to a water supply and has an exposed sprinkler head connected to it, the attachment apparatus includes a guide channel coupled to the J-fitting to facilitate fastening the fitting to the internal structure of the wall.
Owner:THE WANDA GROUP

Plant for treatment of liquid as well as method for controlling such a plant

A plant and method for controlling such a plant suitable for treatment of waste water. The plant includes a basin, a flow generating machine adapted to generate a liquid flow in the basin, equipment in the basin that effects the momentum of the liquid flow, and a control unit. The method includes the steps of: storing a predetermined relationship between the operational speed N of the flow generating machine and an operational parameter P from which the torque M of the flow generating machine may be derived, determining the operational speed N, determining a set value of the operational parameter P of the flow generating machine, determining a real value of the operational parameter P of the flow generating machine, and adjusting the operational speed N if the real value of the operational parameter P is different than the set value of the operational parameter P.
Owner:XYLEM EURO GMBH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products