The invention relates to the field of construction, in particular to a salvage method for a large-
diameter pile buried hammer. Equipment adopted by the salvage method comprises a 
punching pile machine, a new larger 
pile hammer, a small pile hammer, a positioning 
pulley, a movable 
pulley block, a guide wheel, an added 
winch, a 
slurry pump, a 
slurry conveying 
pipe and 
slurry. The 
punching pile 
machine comprises a main 
winch and a secondary 
winch. The main winch, the new large pile hammer, the small pile hammer and the positioning 
pulley form a new 
punching system. The secondary winch, the 
slurry pump, the slurry conveying 
pipe and the slurry form a slurry circulating 
system. The added winch, the movable pulley block and the guide wheel form a lifting 
system. The salvage method includes the following steps of A, positioning of the punching pile 
machine, B, assembling of the new punching system, C, installation of the movable pulley block, D, installation of the added winch and the guide wheel, E, assembling of the new lifting system, F, assembling of the new slurry circulating system and grouting, G, punching operation with the large pile hammer, H, punching operation with the small pile hammer, I, lifting with the lifting system and J, accomplishment of salvage of the pile buried hammer.