Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

40results about How to "Adapt to changing needs" patented technology

Measurement and control device connected with double sets of process layer devices in intelligent substation and measurement and control method thereof

The invention discloses a measurement and control device connected with double sets of process layer devices in an intelligent substation and an implementation method thereof. The measurement and control device comprises an intelligent power module, a master management CPU (central processing unit) module, a human-computer interaction module and two I / O (input / output) functional submodules. The master management CPU module collects, processes and then retransmits the data information acquired by the intelligent power module and the I / O functional submodules to a background monitoring and telecontrol device via an Ethernet, and the human-computer interaction module is controlled by human-computer interaction software to display and output the data information; meanwhile, the master management CPU module receives and retransmits control operation commands to the I / O functional submodules or the intelligent power module; and the master management CPU module is controlled by master management CPU software to process two sets of redundant data. By means of flexible software and hardware configuration, the invention can be adapted to the changing requirements of engineering applications, solves the problem on how to simultaneously connect the double configured process layer intelligent devices into an independently configured alternate measurement and control unit, and meets the requirement for the measurement and control device of the intelligent substation.
Owner:NANJING GUODIAN NANZI POWER GRID AUTOMATION CO LTD

Bandwidth control method and communication node

The embodiment of the invention discloses a bandwidth control method and a communication node, belonging to the technical field of communications. The bandwidth control method in the embodiment of the invention comprises the following steps: multipath parallel basic crossed particles are sent to all the downstream branch export units of the local node by an access unit at the upstream of the local node; one-way adjustment signaling is loaded in the multiple parallel basic crossed particles and is used for instructing to adding or deleting basic crossed particles; polling detection is carried out, and normal signaling is sent when the one-way adjustment response states returned by all the downstream branch export units are confirmed to be received; normal signaling is received by the downstream branch export units, one-way adjustment is conducted on corresponding basic crossed particles in the next multipath parallel basic crossed particles; and the one-way bandwidth adjustment is also conducted on the corresponding downstream nodes. In the method of the embodiment of the invention, lossless adjustment of the bandwidth in the OTN (optical transport network) asymmetrical bandwidth bearing system from one point to multiple points is realized, thus meeting the demand of changes of asymmetrical bandwidth business flow.
Owner:韩宝 +2

Method for monitoring voltage qualification rate by use of electric energy metering device

The invention discloses a method for monitoring a voltage qualification rate by use of an electric energy metering device. The invention provides a method for monitoring a voltage qualification rate by use of an electric energy metering device in terms of voltage qualification rate monitoring equipment, voltage qualification rate monitoring locations, voltage qualification rate statistical methods, main station construction and the like. The electric energy metering device arranged on a power grid is used as a voltage qualification rate monitoring terminal, and the electric energy metering device is provided with continuous monitoring and a statistical function on voltage deviations caused by slow variations in a normal operation state of a power system. The method for monitoring voltage qualification rate by use of the electric energy metering device has the advantages of low revamping and implementation costs, improved accuracy and objectivity of statistical data on the voltage qualification rate and the like.
Owner:王成楷 +3

Mobile payment smart card and control method thereof

The invention discloses a mobile payment smart card. The mobile payment smart card is integrated with a main control communication smart card chip and a financial smart card chip with payment function in an SIP mode, wherein the main control chip is communicated with a mobile phone or other external equipment and performs access control on an affiliated payment smart card chip. The mobile paymentsmart card has contact and non-contact functions, the contact function is controlled by the main control chip, and the non-contact function is controlled by the financial smart card chip. The main control chip is a high-capacity soft mask chip and can support changeful communication application requirements, and the access control of the main control chip on the affiliated payment chip enables the mobile payment smart card to realize STK extension such as financial account information search, aerial earmark and the like by the telecommunication function provided by the main control chip. The affiliated payment chip independent from the main control chip executes the non-contact function, and the mobile payment smart card has higher comprehensive stability due to a parallel processing architecture of the two chips; and the physical independence of the affiliated payment chip ensures that the data has high security of financial level.
Owner:WUHAN TIANYU INFORMATION IND

Three-dimensional model change method and device

InactiveCN104183002AOvercome Difficult-to-Model ProblemsAvoid remodelingAnimation3D-image renderingReference modelSimulation
The invention discloses a three-dimensional model change method and device. The method comprises the following steps: comparing a target three-dimensional model of a target object with a preset reference three-dimensional model to determine a model conversion parameter, wherein the model conversion parameter is used for representing a conversion mode used for converting the reference three-dimensional model into the target three-dimensional model; and according to the model conversion parameter, converting an original three-dimensional model which needs to be converted. A conversion mode of the original three-dimensional model is determined through comparison with the reference model so as to convert the original three-dimensional model, a problem that modeling is difficult to carry out since the original three-dimensional model is different from the target three-dimensional model can be effectively overcome, remodeling and repeated calculation can be avoided, and problems of low modeling precision and high cost caused by the remodeling and the repeated calculation can be avoided, and the method and the device exhibit high flexibility and operation efficiency and can effectively adapt to constantly changing demands.
Owner:SONY CORP

Data reporting method and apparatus, terminal and storage medium

The invention relates to the technical field of communication, and discloses a data reporting method and apparatus, a terminal and a storage medium. The method comprises the following steps: obtaininga data reporting configuration sent by a server; parsing the data reporting configuration, and converting the data reporting configuration into an executable data reporting operation set, wherein thedata reporting operation set comprises one or more data reporting operation items; obtaining an identifier of the data to be reported in the data reporting operation item; and when the data corresponding to the identifier meet the reporting condition of the data reporting operation item, reporting the data corresponding to the identifier to the server. By adoption of the data reporting method andapparatus disclosed by the invention, the flexibility of the client data reporting operation of the server can be improved, the data reporting points do not need to be compensated before issuance, and the data can be extracted from the issued online client subsequently on demand.
Owner:TENCENT TECH (SHENZHEN) CO LTD

Dual-chip mobile payment intelligent card and control method thereof

The invention provides a method for controlling a dual-chip mobile payment intelligent card, which comprises the following steps: a dual-interface control chip receiving a command and transmitting to a soft mask chip of the intelligent card; the soft mask chip of the intelligent card receiving the command transmitted by the dual-interface control chip, and interrupting the command currently processed, starting to process newly-received command; and the soft mask chip of the intelligent card calling corresponding function module to process the received command. The method for controlling the dual-chip mobile payment intelligent card provided by the invention can be fully compatible with the existing 13.56MHz non-contact application environment with widest application and can enlarge an application space through the integrated high-capacity intelligent card soft mask chip, and the intelligent card chip in a soft mask manner can better adapt to the demand of continuous changes of communication application and shorten development time.
Owner:WUHAN TIANYU INFORMATION IND

Whole wallboard assembled house prefabricated by reinforced concrete constitution

The invention discloses a house assembled by pre-cast wallboards with a reinforced concrete structure. A wall body is consisted of four wallboards, namely, a front wallboard, a back wallboard, a left wallboard and a right wallboard, and then a top board is covered on the wall body to form the house. A pin (1) and a faucet (2) are respectively arranged at two ends of the wallboard, and a lock core (3) is arranged on the faucet and a lock column (4) suitable for the lock core is also arranged. A door hole (6) and window holes (7) are arranged on corresponding positions of the wallboards. A hollow round hole (5) is arranged on an inner wall of the wall body, and a protruding lock fastener (8) matching with the hollow round hole (5) on the wallboard is respectively arranged around the top board. The assembled house not only can be as strong as houses with a brick wall structure but also can be conveniently disassembled and moved as movable houses for a reassembling in another place.
Owner:田超群

Controlling a vacuum system comprising a vacuum generator arrangement

The invention relates to controlling a vacuum system comprising a vacuum generator arrangement, and also relates to energy saving in vacuum systems by means of a method and a controller enabling to consider the fluctuation in system-pressure of a system by determining a maximum system-pressure S2H and a minimum system-pressure S2h for each working cycle W C based on a determined target system-pressure p n and a pre-set system-pressure p 0 for the current working cycle W Cn (n = 1, 2, 3, ...). The method is especially adapted to fluctuations in system-pressure level of a vacuum system comprising a vacuum gripper tool.
Owner:派亚博股份公司

A PEBS intelligent productivity ecological balance processing system and method

The invention discloses a PEBS intelligent productivity ecological balance processing system and method. The system realizes cost transient control, intelligent production scheduling, paperless production, data acquisition automation, process management lean, and field data automation, and performs accurate measurement, monitoring and analysis of each capacity factor, performs associated design ofthe capacity factors, and coordinate svarious resources involved in productivity factors such as people, machines, materials, laws, and rings. The hardware system comprises a server, on-site displayoperation equipment, intelligent hardware, automatic data acquisition equipment used for automatically acquiring basic data in production and management and the like. The system has high interconnection of information infrastructure, real-time process manufacturing data analysis and historical data mining analysis, improves and optimizes the manufacturing process, achieves efficient integration ofan intelligent system and manual production, successfully achieves green intelligent production and refined processing of enterprises, and achieves dynamic balance of enterprise productivity.
Owner:上海零参科技发展有限公司

Continuous beam bridge hierarchical control and bidirectional shock-resistant connecting damping device

ActiveCN107022951AAvoid the adverse effects of a sharp increase in seismic responseControlling Joint StiffnessBridge structural detailsBridge erection/assemblyContinuous beamStructural engineering
The invention relates to a continuous beam bridge hierarchical control and bidirectional shock-resistant connecting damping device. The continuous beam bridge hierarchical control and bidirectional shock-resistant connecting damping device comprises an upper sliding block, a lower sliding block, two or more inversed F-shaped components and a bottom plate; the top end of the upper sliding block is fixedly arranged at the bottom end of a beam body; the lower sliding block is positioned in the lower part of the upper sliding block; the bottom end of the lower sliding block is fixed with the top end of the bottom plate; a friction layer is arranged between the bottom end of the lower sliding block and the top end of the bottom plate. The continuous beam bridge hierarchical control and bidirectional shock-resistant connecting damping device is a novel large-tonnage continuous beam bridge damping device which is simple in structure, economic and durable, and convenient to check and maintain; the continuous beam bridge hierarchical control and bidirectional shock-resistant connecting damping device can provide new design concept and technical thinking for design of a new bridge and strengthening of an old bridge, and is suitable for newly building of the bridge and aseismic strengthening of the old bridge.
Owner:SHIJIAZHUANG TIEDAO UNIV

Resting furniture, in particular sleeping or reclining furniture

Beds (10) usually have a supporting spring system (13) for a mattress (14) which has a rigid frame. It is required that such supporting spring systems (13) are adapted to the bed (10), in particular to the bed frame (11). Therefore, an individual supporting spring system (13) is required for each bed (10). Moreover, the supporting spring system (13) having a rigid frame is bulky and thus difficult to transport. The invention provides a bed (10) having a frameless flexible supporting spring system (13). The flexible supporting spring system (13) is supported by a carrying frame (12) or directly by the bed frame (11). The flexible supporting spring system (13) can be rolled and is thus easy to transport. In particular, the flexible supporting spring system (13) allows for the use with different beds (10) and for individual adaptation to different sleeping habits.
Owner:THOMAS BET & VERMOGENS GMBH & CO KG

Universal structure of vehicle battery frame

The invention discloses a universal structure of a vehicle battery frame. The universal structure comprises a middle battery frame and side battery frames fixed to the left side and the right side ofthe middle battery frame. The middle battery frame comprises a rectangular middle battery supporting bracket; each side battery frame comprises a frame side plate and a side battery supporting bracket; a plurality of frame connecting plate structures are fixed on the side surface of the middle battery support bracket at intervals along the length direction; and each frame connecting plate structure comprises a connecting straight plate fixed on the side surfaces of the middle battery supporting brackets, longitudinal fixing supports perpendicular to the connecting straight plates are fixed tothe outer side surfaces of the connecting straight plates, a frame side plate is fixed to each longitudinal fixing support, and the side battery supporting brackets are fixed between the frame side plates located on every two adjacent frame connecting plate structures. The battery frame is constructed on the basis of the connecting plate structures, the structural form of the battery frame is flexible and changeable, the requirement for vehicle deformation can be met, and the battery pack mounting requirements of different vehicle types at different positions are met.
Owner:DONGFENG COMML VEHICLE CO LTD

Switch cabinet convenient for installing long bus

The invention discloses a switch cabinet convenient for installing a long bus. The switch cabinet includes a switch cabinet body, a detachable cabinet top arranged on the switch cabinet body, a bus bridge arranged at the lower end of the cabinet top, and a bus frame erected on the bus bridge. The cabinet top includes multiple cabinet top modules inserted into one another in a sliding manner. The bus frame includes a bottom rack and a top rack which are jointed vertically. The bottom rack and the top rack are of the same structure, and are arranged in a mirroring manner. An appropriate number of cabinet top modules are selected and used according to the need to assemble or disassemble the switch cabinet, and the parts on the top of the switch cabinet are easy to maintain and replace. The bus frame is vertically installed, so that a bus can be put in the bottom rack in advance in the installation process of the bus frame, and the position of the bus can be controlled and adjusted freelyand conveniently. The number of the bus frame can be easily increased or decreased, and expansion and maintenance of the switch cabinet are facilitated.
Owner:HUZHOU ELECTRIC POWER COMPLETE EQUIP

Novel bus frame

The invention discloses a novel bus frame and the bus frame is set up on a bus bridge frame of a power distribution cabinet. The novel bus frame is characterized in that: the novel bus frame comprises a bottom frame and a top frame which are vertically connected. The bottom frame and the top frame are identical in structure and are arranged in a mirroring manner. At least one opening groove is arranged in a connection surface of the bottom frame or the top frame, wherein the connection surfaces of the top frame and the bottom frame are opposite and the positions of the opening grooves on the connection surfaces are corresponding. A clamping block which can slide vertically is arranged inside the opening grooves. A clamping hole having a width adaptable to a width of a busbar is formed in the clamping block. The bus frame is installed vertically, so that the bus can be placed into the bottom frame in advance during an installation process of the bus frame, can freely and conveniently control and adjust the position of the bus, can conveniently increase and reduce the quantity of the bus frames and can provide convenience to capacity extension and maintenance of the power distribution cabinet.
Owner:HUZHOU ELECTRIC POWER COMPLETE EQUIP

Front-end automatic regression testing system and method based on picture comparison technology

The invention discloses a front-end automatic regression test system and a method based on a picture comparison technology, and belongs to the technical field of the Internet, and the method comprisesa tested front-end picture comparison step: comparing whether a test picture and a standard reference picture under the same test group meet a first preset condition; if not, further judging whetherthe test picture and the anti-error reference picture meet a second preset condition; if yes, outputting a comparison result of test success, otherwise, outputting a comparison result of test failure,and outputting a test result of the test group according to a plurality of comparison results; wherein the anti-error reference picture comprises a custom feature picture conforming to certain customfeatures, an interference picture generating interference during screenshot and a picture in development in the development process. According to the method, the problems that in traditional front-end automatic testing, the test case preparation workload is large, the adaptive demand change is poor, only forward expected testing can be conducted, a benchmark version is difficult to prepare, and atest scheme cannot well reflect the test service value can be solved.
Owner:付彪

Method for achieving acquisition of internet protocol (IP) by different virtual local area network (VLAN) users

The invention relates to the technical field of electronic equipment, in particular to a method for achieving acquisition of internet protocol (IP) by different virtual local area network (VLAN) users. User information or VLAN information and the like are set up in a preset setting port type according to the port type. Address pool information is set at the same time. An internet passage is set and IP operation is obtained by user equipment and a certificate server according to the preset information. A plurality of VLAN are set up and the obtainment of an IP address in a way of a point-to-point protocol over Ethernet (PPPOE) and a dynamic host configuration protocol (DHCP) is used, a multi-service function is achieved. The Testing environment is close to user real service environment under the premise that environment change is reduced possibly. Working efficiency is further improved.
Owner:PHICOMM (SHANGHAI) CO LTD

Communication organization method and repeater thereof based on massive node cluster

ActiveCN104580466ASolve the limitation of the number of communication nodesSolve scalabilityStar/tree networksNode clusteringStructure of Management Information
The invention discloses a communication organization method and a repeater thereof based on a massive node cluster. The communication organization method comprises the steps that a framework part of the node cluster is established, and a network topology meeting node number constraint conditions is obtained; the mapping relation between global addresses and local addresses of terminal nodes is obtained through address mapping; a frame structure and a relay protocol are expanded, and the communication organization of the massive node cluster is achieved. The repeater comprises a main controller and an RS485 interface, and the communication repeater further comprises a power source isolation circuit, a signal isolation circuit and a bus biasing circuit. The power source isolation circuit and the signal isolation circuit are used for isolating a power source and signals of the main controller and a power source and signals of the RS485 interface respectively. The bus biasing circuit is used for conducting short circuit and bypass protection on the RS485 interface. The communication organization method and the repeater adapt to the change demands of a network, and the reliability of control over cluster network communication is improved; the purposes of cluster communication and management of embedded equipment are achieved.
Owner:BINHAI IND RES INST OF TIANJIN UNIV CO LTD

Lamp panel hardness detection device for LED illumination lamp production

The invention discloses a lamp panel hardness detection device for LED illumination lamp production. The lamp panel hardness detection device comprises an L-shaped test carrier table; hydraulic cylinders are fixed to the outer wall of the bottom of the L-shaped test carrier table through screws; supporting blocks are fixed at the top ends of extension rods of the hydraulic cylinders through screws; universal wheels are fixed to the outer wall of the bottom end of one side, close to the hydraulic cylinders, of the L-shaped test carrier table through screws; a cavity is formed in the L-shaped test carrier table; a processor is fixed on the inner wall of one side of the L-shaped test carrier table through screws; a storage battery is fixed on the inner wall of the bottom of the L-shaped testcarrier table through screws; a power switch is fixed on the outer wall of one side of the L-shaped test carrier table through screws; a first through hole is formed in the outer wall of one side, close to the processor, of the L-shaped test carrier table; and a lamp panel positioning screw rod is inserted into the first through hole. The device can be flexibly stretched and matched with a test needle fixing plate; and an LED lamp panel is accurately connected with a test power supply, so that the stability and safety of the device are improved.
Owner:张玉锦

Rule-based operation method and system

The invention provides a rule-based operation method and system, computing equipment and a computer readable storage medium. The method comprises the steps: receiving a hierarchical group number and user information sent by a terminal through a rule engine, and further extracting user extension information according to the user information, matching and processing rule expressions according to the hierarchical group numbers, the current user information and the user extension information; and if the data matched with the rule expression exists, acquiring an operation configuration file corresponding to the rule expression, and sending the operation configuration file to the terminal. According to the method, the product and the operator can independently configure the business logic without the participation of research and development personnel, so that the operation efficiency of the system is improved.
Owner:在线途游(北京)科技有限公司 +1

Method, device and equipment for generating Word document by Java application and medium

The invention relates to the technical field of data processing, and discloses a method, a device and equipment for generating a Word document by a Java application and a medium. The method comprises the following steps: determining a plain text placeholder set and a non-plain text placeholder set according to a target FreeMarker template identifier set; according to the service database, service data searching and KV data pair assembling are sequentially carried out on each placeholder in the plain text placeholder set to obtain a first KV data pair set; according to the picture database, sequentially carrying out picture identifier searching and KV data pair assembling on each placeholder in the non-plain text placeholder set to obtain a second KV data pair set; and obtaining a target Word document based on a FreeMarker framework according to the target FreeMarker template identifier set, the target position configuration data, the first KV data pair set and the second KV data pair set. Coding and style adjustment do not need to be carried out massively for specific content.
Owner:PING AN TECH (SHENZHEN) CO LTD

Connecting plate structure for constructing battery frame

The invention discloses a connecting plate structure for constructing a battery frame. The structure comprises a connecting straight plate, and a middle frame mounting foundation capable of serving asa middle battery frame mounting foundation and a side frame mounting foundation capable of serving as a side battery frame mounting foundation are respectively arranged on the inner side surface andthe outer side surface of the connecting straight plate. The middle frame mounting foundation comprises a middle frame fixing transverse plate vertically and fixedly connected to the inner side surface of the connecting straight plate, and the side frame mounting foundation comprises a side frame fixing transverse plate vertically and fixedly connected to the outer side surface of the connecting straight plate and a longitudinal fixing support vertically connected to the side frame fixing transverse plate and the outer side surface of the connecting straight plate at the same time. The batteryframe is constructed on the basis of the connecting plate structure, the structural form of the battery frame is flexible and changeable, the requirement for vehicle deformation can be met, and the battery pack mounting requirements of different vehicle types at different positions are met. Main components such as the side plates, the brackets and the bent supporting plates are highly standardized and universalized.
Owner:DONGFENG COMML VEHICLE CO LTD

General structure of a vehicle battery frame

The invention discloses a general structure of a vehicle battery frame, comprising a middle battery frame and side battery frames fixed on the left and right sides of the middle battery frame; the middle battery frame includes a rectangular middle battery support bracket; the side battery frame includes a frame The side plate and the side battery support bracket; the side surface of the middle battery support bracket is fixed with a plurality of frame connection plate structures at intervals along its length direction; the frame connection plate structure includes connections fixed on the side surface of the middle battery support bracket Straight board, the outer surface of the connecting straight board is fixed with a longitudinal fixing bracket perpendicular to it, each longitudinal fixing bracket is fixed with a frame side board, and a side board is fixed between the frame side boards on the two adjacent frame connecting board structures. external battery support bracket. The battery frame is built on the basis of the connecting plate structure. The structure of the battery frame is flexible and changeable, which can adapt to the needs of vehicle variants and meet the battery pack installation requirements of different models in different positions.
Owner:DONGFENG COMML VEHICLE CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products