Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

40results about How to "Tight schedule" patented technology

Fabricated integral-type revetment structure on soft soil foundation and construction method thereof

The invention discloses a fabricated integral-type revetment structure on a soft soil foundation. The fabricated integral-type revetment structure comprises a prefabricated vertical plate, a prefabricated base plate and a prefabricated pile foundation. The prefabricated vertical plate is arranged at the top end of the prefabricated base plate, and the prefabricated pile foundation is arranged at the bottom end of the prefabricated base plate. The prefabricated vertical plate and the prefabricated base plate are formed in an integrated casting mode. The prefabricated pile foundation comprises a plurality of prefabricated piles. The top of each prefabricated pile stretches into the prefabricated base plate. A plurality of prefabricated pile holes are evenly formed in the prefabricated base plate, and each prefabricated pile hole and the corresponding prefabricated pile are in one-to-one correspondence. The prefabricated pile holes are located over the corresponding prefabricated piles. The invention further discloses a construction method of the fabricated integral-type revetment structure on the soft soil foundation. According to the fabricated integral-type revetment structure on the soft soil foundation, the prefabricated pile foundation, the prefabricated vertical plate and the prefabricated base plate are adopted to be integrally assembled, a low-pile cap revetment structure is formed together, horizontal force equipollent loads behind a wall are borne by the revetment structure so that the effect of being safe, stable and reliable in structure can be achieved, and the purposes of high efficiency, energy saving, greening and environmental protection can further be realized.
Owner:CCCC THIRD HARBOR CONSULTANTS

Deep and large open caisson prefabricated structure and mounting method thereof

The invention belongs to the field of civil engineering, and particularly relates to a deep and large open caisson prefabricated structure and a mounting method thereof. The open caisson prefabricatedstructure and the mounting method thereof have the beneficial effects that the industrialized processing advantages are fully utilized, processing of a deep and large open caisson is decomposed intoin-situ casting of a foot blade and prefabricating and assembling of ring pieces; by means of the foot blade and the ring pieces, connecting bolt hole channels are pre-embedded, and effective connection between the prefabricated ring pieces and effective connection between the prefabricated ring pieces and the foot blade are achieved; a counter-force frame foundation constructed in advance is utilized, and pressurization counter-force is provided through a hydraulic device so as to assist in sinking; and sinking-assisting hole channels are pre-embedded when the ring pieces are prefabricated, and effective assistance can also be achieved. The method prefabricating and installing the ring pieces in sequence for the deep and large open caisson is simple in principle, easy to operate, economical and reliable and suitable for fast construction of the open caisson; and as for the engineering which is particularly limited by construction clearance height and short in construction period, theopen caisson construction without drainage sinking is adopted, and therefore, a support can be prevented from being erected and disassembled, continuous and uniform sinking can be realized, the construction period can be shortened, and the cost can be reduced.
Owner:CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD +1

Plastic drainage board and construction method for soft soil foundation drainage consolidation

The invention relates to the field of building construction, in particular to a plastic drainage board and a construction method for soft soil foundation drainage consolidation. The plastic drainage board comprises a drainage bracket and a filter membrane. The drainage bracket is composed of an integrally-formed transverse bracket and multiple vertical brackets. The transverse bracket and the vertical brackets are arranged in a manner that the transverse bracket is perpendicular to and intersects with the vertical brackets. Easy-shearing grooves are formed equidistantly in the vertical brackets. The transverse bracket and the vertical brackets are covered with the filter membrane. The plastic drainage board is steady in structure, great in water diversion and drainage performance, and easyto shear, and saves time and labor; the fracture is smooth; and connection with a follow-up drainage pipe can be conducted beneficially. The plastic drainage board is used and applied in the construction method for soft soil foundation drainage consolidation; by means of adopting the construction method, the project quality of the drainage consolidation construction is better, and the progress isfaster; and thus the requirements of projects with short construction periods and high quality requirements are satisfied.
Owner:CHINA HUADIAN ENG

Gravity type fabricated ecological revetment structure and construction method thereof

The invention discloses a gravity type fabricated ecological revetment structure comprising prefabricated boxes, a backfill material, a prefabricated base plate and plantation soil materials. The prefabricated boxes of a plurality of grades are arranged on the base plate. The front portions and the back portions of the plurality of grades of the prefabricated boxes are both in step shapes. The plantation soil materials are arranged in the prefabricated boxes. The backfill material is arranged on the back side of the prefabricated boxes. According to the gravity type fabricated ecological revetment structure, on the bank side of a river way good in geological conditions, the prefabricated base plate and the prefabricated boxes are assembled, the front portions and the back portions of the vertically adjacent prefabricated boxes are both arranged in step shapes, and then the gravity type fabricated revetment structure is formed; the horizontal force and other loads behind a wall are borne by the revetment structure, then the functions that the structure is safe, stable and reliable are achieved, and the gravity type fabricated ecological revetment structure also achieves the purposesof being high in efficiency and environmentally friendly and saving energy. The gravity type fabricated ecological revetment structure has the advantages of factorized manufacturing, rapid construction, little resource waste, environmental friendliness and the like. The gravity type fabricated ecological revetment structure is suitable for the places good in geological conditions, high in environmental requirement, limited in work period and has broad application prospects.
Owner:CCCC THIRD HARBOR CONSULTANTS

Construction process for pier top section of hollow thin-walled high pier column

The invention relates to a construction process for a pier top section of a hollow thin-walled high pier column. The pier column is constructed by using slip form equipment, wherein the slip form equipment comprises an external mold and an internal mold which is positioned in the external mold. The construction process for the pier top section of the hollow thin-walled high pier column comprises the following steps of constructing an embedded part when the slip form equipment slides to a variable section part of the pier column, wherein the embedded part comprises an embedded steel plate and an embedded reinforcement which is fixed on the embedded steel plate, wherein the embedded steel plate is arranged on the internal side of the pier column; dismantling the internal mold from the pier column; mounting a bracket on the embedded steel plate; mounting a prefabricated variable section template on the bracket; performing reinforcement construction on the pier column; pouring concrete tothe pier column; continuing to lift the external mold; and pouring the concrete to the external mold. According to the construction process for the pier top section of the hollow thin-walled high piercolumn, the method is simple, the labor intensity is reduced and the difficulty coefficient is reduced.
Owner:MCC5 GROUP CORP SHANGHAI

Novel reconstruction and expansion structure with side hinge limiting device

Relating to the field of freeway construction new technologies, the invention provides a novel reconstruction and expansion structure with a side hinge limiting device. The structure consists of precast segmental plates, cast-in-situ wet joints, longitudinal ribs, PRC pipe piles, PHC pipe piles, joint end capping beams, a longitudinal cast-in-situ segment and corrugated steel guardrail stand columns. The precast segmental plates are connected by the cast-in-situ wet joints, the longitudinal ribs are disposed at the downsides of the precast segmental plates, the PHC pipe piles are arranged at the lower ends of the PRC pipe piles, the PRC pipe piles are fixedly arranged at the lower sides of the longitudinal ribs, the longitudinal cast-in-situ segment is disposed between the precast segmental plates and an original roadbed, and the corrugated steel guardrail stand columns are vertically arranged between the original roadbed and the longitudinal cast-in-situ segment. The novel reconstruction and expansion structure provided by the invention can well transfer the vertical load, also can adapt to temperature, automobile braking force and other horizontal loads, has the advantages of strong integrity, good stability, firmness and durability, and slow deformation accumulation, etc., and is conducive to high-speed driving and reduction of maintenance workload.
Owner:ANHUI TRANSPORT CONSULTING & DESIGN INST

Large component collaborative machining planning method for multi-robot collision avoidance coupling planning problem

The invention discloses a large component collaborative machining planning method for a multi-robot collision avoidance coupling planning problem. The method comprises: conducting machining area division on multiple robots; judging the processing load balance of the robot, and optimizing the load balance of each processing partition by adopting a task redistribution process; identifying areas, interfering with other subareas, in all robot subareas, and establishing undirected graph models of all interference areas; generating an interference region priority sequence between any two robots, converting the undirected graph model into a directed acyclic graph (DAG) model, and forming an incomplete scheduling plan of multiple robots; embedding non-interference area tasks into incomplete scheduling represented by the DAG; searching a feasible DAG instance, embedding a non-interference area task, judging the collaborative processing efficiency of the current instance, and accepting a better solution until the expected scheduling optimization target is achieved. An effective method for improving the multi-robot cooperation efficiency and safety is provided for large part machining, and practicability and universality are good.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Waterproof heat preserving structure system for novel ganged brick outer wall steel skeleton and construction method

InactiveCN110387983ASatisfy the requirement to start construction simultaneouslyTight scheduleWallsClimate change adaptationCalcium silicateBrick
The invention relates to a waterproof heat preserving structure system for a novel ganged brick outer wall steel skeleton and a construction method and belongs to the technical field of building construction. The system aims to solve the problems that when a traditional construction technology carries out ganged brick water wall construction, the construction period is long, and water preventing,heat preserving and tying are difficult. A heat preserving layer space is utilized to serve as a steel skeleton partition wall system, and the structure system mainly comprises a ganged brick outer wall, a steel skeleton waterproof heat preserving isolating layer and a main body steel structure. In the construction process, the steel skeleton and wall body tie bars are arranged on the heat preserving layer between construction columns, a metal waterproof layer seals the outside, the steel skeleton is filled with heat preserving rock cotton, a calcium silicate board seals the inside, and thus the steel skeleton waterproof heat preserving isolating layer is formed. By arranging the steel skeleton waterproof heat preserving isolating layer, the requirement for starting construction of outer wall ganged brick building and indoor decorating and finishing can be met, a great deal of construction period can be saved on the condition with the limited construction period, and the system has theadvantage of ensuring acceleration of the work progress.
Owner:SHANGHAI CONSTRUCTION GROUP

Permanent magnet power-assisted double-ended vacuum insulation earthing switch

The invention discloses a permanent magnet power-assisted double-ended vacuum insulation earthing switch. The permanent magnet power-assisted double-ended vacuum insulation earthing switch comprises apositioning mounting plate, a mounting support, an auxiliary contact assembly, a synchronous connecting plate, an insulating pull rod, a substrate plate, a contact spring, a soft connecting line, a vacuum switch tube, a linear bearing, a rack shaft, an insulating pole, a double-thread screw, a screwed plug, a connecting rod, a gear shaft and a permanent magnet chuck, wherein the rack shaft and the gear shaft are mounted on the substrate plate through the mounting support, the positioning mounting plate and the linear bearing; the permanent magnet chuck and the auxiliary contact assembly are arranged between the substrate plate and the synchronous connecting plate; the end of the insulating pole is fixed on the substrate while the vacuum switch tube is mounted inside the insulating pole; and a vacuum degree monitoring sensor is preinstalled at the static end of the vacuum switch tube. The vacuum insulation type technology is reliable, a high-voltage fracture is closed, the journey is compact, the structure is flexible and convenient in overall arrangement, the mechanism is smart, simple and labor-saving, and the mechanical property matched thinking is novel.
Owner:BEIJING CED RAILWAY ELECTRIC TECH

Terrace field type ecology landscape lake and construction method thereof

The invention discloses a terrace field type ecology landscape lake and a construction method thereof. The bottom of the landscape lake from the center to the bank is in a trend of being gradually risen as a whole, corresponding bottom cofferdams are arranged at a plurality of stages of contour lines at intervals from the center to the bank of the landscape lake, each circle of the bottom cofferdam surrounds the landscape lake for one circle, the landscape lake is divided into a plurality of surrounding lake areas by all bottom cofferdams; sinking water landscape plants are planted at the bottom of the lake. Due to adoption of the stage-shaped bottom cofferdams the bottom of the lake is divided into the plurality of the surrounding lake areas, and together with radial partitioning walls each surrounding lake area is further divided into a plurality of cofferdam blocks. Therefore, in the overall construction process of the landscape lake, sectional soil construction can be implemented,and planting and water injection can be implemented at different times, so that the construction progress is compact, and the construction process is effectively increased. In addition, the sinking plants can be maintained and replaced at an early state at a low primary maintenance water level, so that problems of tedious later plant replenishing and the like after large-scale death of aquatic plants are avoided.
Owner:中铁四川生态城投资有限公司

Breathing type gravity prefabricated box ecological embankment structure and construction method thereof

The invention discloses a breathing type gravity prefabricated box ecological embankment structure which comprises prefabricated boxes, a backfill material, a gravel foundation bed, a plain concrete cushion, a prefabricated small caisson, planting soil and bottom protection structures. The plain concrete cushion is arranged on the gravel foundation bed and provided with the prefabricated small caisson. The prefabricated boxes are arranged on the prefabricated small caisson, and the front portions and the rear portions of the multiple prefabricated boxes are arranged in a step manner. Accordingto the breathing type gravity prefabricated box ecological embankment structure, a soft soil foundation on the side of a riverway is firstly subjected to filling of the gravel foundation bed, the prefabricated small caisson and the prefabricated boxes are arranged on the filling gravel foundation bed, and the breathing type gravity prefabricated box ecological embankment structure is jointly formed; and horizontal force behind a wall and other loads are borne by the embankment structure, the function that the structure is safe, stable and reliable is achieved, and the aims of high efficiency,energy saving, ecological operation, environment friendliness, convenient and rapid construction and good economic performance can also be achieved.
Owner:CCCC THIRD HARBOR CONSULTANTS

A permanent magnet power-assisted double-terminal vacuum insulated grounding switch

ActiveCN109616365BOptimize layoutVacuum-insulated form of technical reliabilityHigh-tension/heavy-dress switchesEarthing switchesEngineeringControl theory
The invention discloses a permanent magnet power-assisted double-ended vacuum insulation earthing switch. The permanent magnet power-assisted double-ended vacuum insulation earthing switch comprises apositioning mounting plate, a mounting support, an auxiliary contact assembly, a synchronous connecting plate, an insulating pull rod, a substrate plate, a contact spring, a soft connecting line, a vacuum switch tube, a linear bearing, a rack shaft, an insulating pole, a double-thread screw, a screwed plug, a connecting rod, a gear shaft and a permanent magnet chuck, wherein the rack shaft and the gear shaft are mounted on the substrate plate through the mounting support, the positioning mounting plate and the linear bearing; the permanent magnet chuck and the auxiliary contact assembly are arranged between the substrate plate and the synchronous connecting plate; the end of the insulating pole is fixed on the substrate while the vacuum switch tube is mounted inside the insulating pole; and a vacuum degree monitoring sensor is preinstalled at the static end of the vacuum switch tube. The vacuum insulation type technology is reliable, a high-voltage fracture is closed, the journey is compact, the structure is flexible and convenient in overall arrangement, the mechanism is smart, simple and labor-saving, and the mechanical property matched thinking is novel.
Owner:BEIJING CED RAILWAY ELECTRIC TECH

Etching equipment for wafers

The invention relates to the field of production and machining of wafers and in particular relates to a corrosion device for wafers. The corrosion device comprises a liquid tank, wherein a ladder-shaped high platform is fixedly arranged along the inner bottom of the liquid tank; the high platform comprises a first-grade high platform located in the middle of the liquid tank and a second-grade high platform higher than the first-grade high platform; the first-grade high platform is fixedly connected with a compression spring; the upper end of the compression spring is fixedly connected with a tray; a baffle is arranged at the peripheral edge of the tray; one end of the tray can be arranged on the second-grade high platform; the other end of the tray is fixedly connected with a pull rope; the pull rope is fixedly connected with a sliding cover; the sliding cover is connected onto a water inlet in a sliding manner; a liquid spraying roller capable of spraying a corrosion solution into the tray is arranged above each of two sides of the liquid tank. According to the corrosion device, the tray slightly sways leftward and the rightward, namely the corrosion solution and the wafers are correspondingly stirred, so that all the wafers and all surfaces of the wafers can be in contact with the corrosion solution, and the wafers are more uniformly corroded; after the wafers are corroded, clean water is poured to wash the wafers; the time is short and the excessive corrosion is avoided.
Owner:重庆晶宇光电科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products