The invention relates to underground water conveying pipeline construction placement equipment. The equipment comprises a moving device, a fixing device I and a fixing device II, wherein the fixing device I and the fixing device II are symmetrically and fixedly arranged on the left side and the right side of the upper end of the moving device correspondingly; and the fixing device I comprises a long supporting plate, a telescopic support, a supporting plate, sliding rails, clamping frames and an electric push rod, and the clamping frames comprise inverted-L-shaped plates, pressing plates, limiting plates, telescopic rods, clamping plates, large springs, large balls and rubber plates. According to the underground water conveying pipeline construction placement equipment, the equipment is fixed through the moving device, through the cooperation between the fixing device I and the fixing device II, a pipeline is fixed on one side of the equipment, and the pipeline is mounted and positioned on the other side of the equipment, so that the purpose of improving the machining efficiency of the equipment is achieved; and meanwhile, the pipeline is clamped and fixed through the gravity of the water conveying pipeline, so that the energy loss of the equipment is reduced, and therefore the working efficiency of the equipment is improved.