Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

148 results about "Real-time database" patented technology

A real-time database is a database system which uses real-time processing to handle workloads whose state is constantly changing. This differs from traditional databases containing persistent data, mostly unaffected by time. For example, a stock market changes very rapidly and is dynamic. The graphs of the different markets appear to be very unstable and yet a database has to keep track of current values for all of the markets of the New York Stock Exchange. Real-time processing means that a transaction is processed fast enough for the result to come back and be acted on right away. Real-time databases are useful for accounting, banking, law, medical records, multi-media, process control, reservation systems, and scientific data analysis.

System for multi-stage planning of construction processes and resource allocation

A system for multi-stage planning of construction processes and resource allocation, consisting of: a central planning engine configured to receive input data, including architectural design models, structural constraints, procurement schedules, and historical performance indicators; a task decomposition processor that is operationally connected to the central planning engine and configured to generate a hierarchical construction task graph by decomposing macro-level construction milestones into mid-level and micro-level subtasks, with each subtask having time estimates, location identifiers, resource requirements, and mutual dependencies; a hybrid planning processing unit configured to resolve time and resource constraints across the entire task diagram; a resource coordination controller that is operationally connected to the central planning engine, wherein the resource coordination controller includes a real-time database of work units, machines and material stocks, each resource being tagged with attributes such as availability, usage history, operating status and spatial location; a multitude of distributed execution units distributed across the construction zones, each distributed execution unit comprising an embedded controller, sensor interfaces, task status processing logic, and communication circuitry, each distributed execution unit being configured to receive planning instructions from the central planning machine, execute localized control logic for task confirmation and resource activation, and transmit task execution data back to the central planning machine; an adaptive conflict resolution processing unit that is operationally connected to the central planning engine and configured to detect conflicts in task execution or resource conflicts, simulate alternative task-resource allocation scenarios using a real-time multi-agent model, and autonomously update the task graph with revised task sequences and resource allocations; and A dashboard for the construction process, configured to visualize task progress, deviations from the planned schedule, and resource efficiency metrics, with the dashboard also being able to receive manual override inputs or approve automated conflict resolution proposals generated by the adaptive conflict resolution module.
Owner:1XL INFRA & REAL ESTATE DEVELOPMENT LLC +2

Urban road moving source intelligent monitoring method and system based on multi-source data coupling

The invention discloses an urban road mobile source intelligent monitoring method and system based on multi-source data coupling, and relates to the technical field of environment monitoring and intelligent traffic. Utilizing a machine learning algorithm to construct a pollutant emission, carbon emission and energy consumption prediction model; acquiring vehicle inventory data in the city, and calculating the pollutant emission, energy consumption and carbon emission of the whole city; the method comprises the following steps of: constructing a dynamic distribution diagram of automobile emission in a city by using real-time position data of vehicles and urban road network information, introducing an atmospheric diffusion model, simulating pollutant migration by combining urban geographic information and environmental data, comparing and verifying a simulated migration result with actually measured data of a national control site, and optimizing parameters of the atmospheric diffusion model; and storing the result into a real-time database, and displaying the pollutant distribution, emission, energy consumption and carbon emission of the urban road network in real time through a visual interface. According to the invention, the temporal-spatial resolution and prediction precision of data are effectively improved.
Owner:SHANDONG UNIV

Multi-objective constraint solving method for fire-fighting monitoring and generator set collaborative optimization

The invention discloses a fire-fighting monitoring and generator set collaborative optimization multi-target constraint solving method, which comprises the following steps: carrying out real-time acquisition and structured processing on multi-source data, acquiring safety monitoring and equipment operation data through a sensor network, and storing the data in a distributed real-time database after preprocessing; carrying out dynamic thermodynamic field modeling and risk area division, discretizing a plant area as a grid unit, solving a heat conduction equation in combination with heat source modeling and boundary conditions, and dividing three levels of risk areas; building a multi-objective optimization model, defining three types of core constraints, building a normalized objective function, and realizing multi-objective decoupling through dynamic weight adjustment; according to an asymmetric load migration strategy, differential load adjustment is implemented according to an optimization result, an auxiliary system is linked, constraints are verified in real time, and closed-loop control is formed. According to the technology, the collaborative goals of safety risk controllability, system efficiency maintenance and equipment redundancy optimization are achieved, and the method is suitable for fire prevention and efficient operation in an energy production scene.
Owner:SEVENTH SENSE IOT (SHANGHAI) CO LTD

Industrial big data simulation verification system based on digital twinning

The invention relates to the technical field of industrial automation and intelligent manufacturing, and discloses an industrial big data simulation verification system based on digital twinning, and the system comprises a physical entity module which is used for deploying an industrial sensor array and collecting the real-time parameter data of production equipment; the digital twin mirror image module is linked with the physical entity module through a data mapping engine, and synchronously updates a virtual mirror image model at a millisecond level according to the parameter change of the physical entity; and the data transmission module is used for transmitting the data acquired by the physical entity module to the digital twin mirror image module and the multi-source data fusion module through a 5G or industrial Ethernet, and is used for cleaning the acquired multi-modal industrial data and eliminating noise data. Through the physical entity-digital twin mirror image real-time linkage design, the limitation that traditional simulation is disjointed with entities is broken through. The industrial sensor array is combined with the edge calculation module, so that rigid linkage of physical production equipment, a real-time database and a digital twin mirror image is realized.
Owner:HARBIN UNIV OF SCI & TECH

Fire water tanker emergency intelligent scheduling method and system based on cloud platform

The invention discloses a fire water tanker emergency intelligent scheduling method and system based on a cloud platform, and relates to the technical field of intelligent scheduling management. According to the method, based on a multi-dimensional real-time database constructed by a cloud platform, multi-disaster data and priority data in a to-be-dispatched vehicle data dynamic acquisition and classified storage process are acquired, and preliminary dispatching distribution of to-be-dispatched vehicles is synchronously completed, so that a dispatching response initial period is shortened; after preliminary scheduling distribution, candidate scheduling schemes are generated, and meanwhile, an optimal scheduling scheme is screened out so as to accurately match emergency requirements of each target area; after the optimal scheduling scheme is obtained, based on a received scheduling instruction, a driving route and task allocation are dynamically adjusted, and scheduling information is synchronously pushed to a command center and each task scheduling site, so that rescue delay caused by information lag is avoided. Full-process optimization of data processing, scheme screening and collaborative scheduling in a multi-disaster-situation concurrent scene is realized, so that the timeliness of emergency scheduling of the fire water tanker is effectively improved.
Owner:LONGYAN CHANGFENG SPECIAL VEHICLE CO LTD

Battery database access system and method based on Dify and large model question and answer mechanism

The invention relates to a battery database access system and method based on Dify and a large model question and answer mechanism, and the system comprises a front end interaction module which is responsible for carrying out information interaction with a user, receiving a natural language question of the user, and transmitting the question to a rear end for processing; the Dify agent management module is responsible for task distribution and user intention recognition; the Prompt generation and scheduling module is responsible for converting the user problem into a query request which can be understood and processed by the system; the database interface module is responsible for being connected with a new energy battery database; the large model generation module is used for generating natural language answers of the user questions through a large language model; and the context management module is responsible for storing and managing context information in multiple rounds of conversations. A user can intelligently interact with the new energy battery database through a natural language, and can easily and efficiently access information in the real-time database.
Owner:ZHENGZHOU AFFIRMATIVE TECH LTD

Intelligent optimization method and system for atmospheric and vacuum distillation unit based on deep reinforcement learning

The invention discloses an atmospheric and vacuum distillation unit intelligent optimization method and system based on deep reinforcement learning, and relates to the field of oil refining and chemical engineering, and the method comprises the steps: collecting historical operation data from a distributed control unit and a real-time database of an atmospheric and vacuum distillation unit, and carrying out the preprocessing, and obtaining a preprocessed historical data set; constructing a process mechanism feature network through a graph neural network by using the preprocessed historical data set, mining an association relationship among equipment parts, extracting abstract features representing a process principle, and constructing a digital twin environment; in a digital twin environment, a meta-reinforcement learning algorithm is adopted to train a deep reinforcement learning agent, so that the deep reinforcement learning agent obtains meta-strategies adapted to different crude oil properties. According to the method, safe, stable and efficient intelligent optimization control is realized through a closed-loop operation mechanism of safe mirror image drilling and credibility driving, and the problem of optimization response lag caused by manual model adjustment due to crude oil property change in a traditional optimization technology is solved.
Owner:CISINFO

Dynamic intelligent stamping production line real-time monitoring strategy based on digital twinning

The invention relates to a dynamic intelligent stamping production line real-time monitoring strategy based on digital twinning, and adopts the technical scheme that a sensing layer acquires production total factor data related to a stamping production line in real time through multi-sensor fusion and an RFID (Radio Frequency Identification) technology, performs primary processing by utilizing edge calculation, and transmits the data to a real-time reaction layer; the real-time reaction layer quickly processes and analyzes multi-source data through edge calculation and a real-time database, detects faults in real time by using a multi-modal fusion technology, triggers an alarm mechanism, and feeds back to the interaction layer; and the interaction layer integrates intelligent production scheduling and NLP voice interaction through data interaction processing, error verification and multi-protocol adaptation to realize virtual factory visualization and equipment health real-time monitoring. Multi-modal data fusion is realized, an adaptive incremental learning and early warning mechanism is realized, an information island is broken, and millisecond-level response is realized. The strategy can improve the production efficiency, reduce the operation and maintenance cost, prolong the service life of equipment, and provide an efficient solution for intelligent transformation of the manufacturing industry.
Owner:YANGZHOU UNIV

Real-time database distributed query optimization method based on memory calculation

The invention relates to the technical field of distributed database optimization, and discloses a real-time database distributed query optimization method based on memory computing, comprising the following steps: modeling query delays, the query delays comprising computing delays and communication delays; and based on the modeling result of the query delay, the query progress and the resource allocation strategy of each node are determined, each node is a single calculation unit in the distributed database, the calculation delay of the node is inversely proportional to the resource allocation and query load of the node, and the communication delay between the nodes is determined by the data transmission quantity and the bandwidth between the nodes. Through an optimal control theory, a game theory model and a self-adaptive control mechanism, dynamic allocation of calculation and communication resources, collaborative optimization of resources among nodes, self-adaptive adjustment of query loads and resource scheduling optimization driven by historical data are realized, the query execution efficiency is effectively improved, and the overall query delay is reduced.
Owner:BEIJING YANNENG TECH CO LTD

Hydropower station multi-system intelligent linkage method, system, device and medium

The invention relates to the technical field of hydropower station intelligent regulation and control, and discloses a hydropower station multi-system intelligent linkage method, system and device and a medium. The method comprises the following steps: deploying sensors at key nodes of a plurality of subsystems in a hydropower station, constructing a distributed sensor network based on all the sensors, establishing a real-time database, then constructing opportunity constraint conditions for processing non-Gaussian disturbance in the subsystems, and converting the opportunity constraint conditions into CVaR-based deterministic constraints; according to the information of the whole system of the hydropower station, an optimization problem meeting deterministic constraints is constructed, and the optimization objective is to minimize the control deviation of the whole system of the hydropower station; obtaining an optimization result of the optimization problem based on an iterative solution algorithm of an interior point method; according to an optimization result, key control parameters in the corresponding subsystems are determined, and then a multi-system cooperative control strategy is generated; and executing intelligent regulation and control on the hydropower station based on a multi-system cooperative control strategy. The method realizes intelligent linkage regulation and control of multiple systems of the hydropower station.
Owner:THREE GORGES JINSHAJIANG CHUANYUN HYDROPOWER DEV CO LTD

Large model-based vertical field fine tuning optimization method and strip mine intelligent system

The invention discloses a vertical field fine tuning optimization method based on a large model and a strip mine intelligent system, and relates to the technical field of artificial intelligence. The vertical field fine-tuning optimization method based on the large model comprises the following steps: acquiring original data of one or more data sources, and performing data distillation on the original data to construct an industry high-quality data set; determining a pre-trained large language model according to the industry scene; the large language model is continuously trained using the industry high quality data set to lightly trim the large language model and generate an industry large model. The industrial normative file is segmented into semantic paragraphs, vector embedding corresponding to each semantic paragraph is generated, and the vector embedding is stored in a real-time database; and retrieving information related to the query of the industry large model in a real-time database to enhance the output response of the industry large model. By adopting the technical scheme of the invention, the adaptation degree of intelligent deployment and control of strip mine mining is improved.
Owner:JIANGSU HENGWANG DIGITAL TECH CO LTD

Distributed storage method and system of real-time database, electronic equipment and storage medium

The invention provides a distributed storage method and system of a real-time database, electronic equipment and a storage medium, and relates to the technical field of power grid dispatching automation systems. The distributed storage method of the real-time database comprises the following steps: constructing the real-time database according to an electric power public information model of a monitored power grid; setting a plurality of fragments for storing data in the plurality of physical nodes; the first content in the real-time database is stored in the corresponding fragment in the multiple fragments in a fragment storage mode; respectively storing the second content in the real-time database into a plurality of fragments in a copy storage mode; and storing the third content in the real-time database into the first fragment in the plurality of fragments in a centralized storage manner. While the data fragmentation is realized, the local integrity of the on-chip power grid model is maintained, and the on-chip application can still perform efficient processing in a local shared memory mapping file mode based on the fragmentation.
Owner:NR ELECTRIC CO LTD +1

Water conservancy Internet of Things system and control method thereof

The invention relates to the technical field of Internet of Things and water conservancy informatization, and discloses a water conservancy Internet of Things system and a control method thereof, and the system comprises an Internet of Things management platform, a business system, a water conservancy intelligent device, and a message queue service, a real-time database, a real-time monitoring system and an Internet of Things gateway which are in communication connection with the Internet of Things management platform. The business system is in communication connection with the real-time monitoring system and the message queue service, the real-time monitoring system is in communication connection with the message queue service, and the water conservancy intelligent equipment is in communication connection with the Internet of Things gateway. The problems of poor compatibility and the like in the prior art are solved. Through the cooperation of the protocol conversion service and the Internet of Things gateway, the plug-and-play of more than 90% of industrial equipment in an irrigation area is supported; the message queue service is combined with the MQTT protocol, so that the end-to-end delay is reduced to be less than 50ms; based on strategy optimization of data driving, manual intervention is reduced, and the scheduling efficiency is improved by more than 30%.
Owner:YUNNAN WATER INVESTMENT INFORMATION TECHNOLOGY CO LTD

Real-time evaluation method and system for power production data quality

The invention discloses a real-time evaluation method and system for power production data quality, and belongs to the technical field of power generation industry data security. Classified data quality measurement points and overall data quality measurement points are created in a real-time database according to the types of measurement points in an I / O (input / output) list of a power production monitoring system; an evaluation rule is established on the basis of five items of data including effective measuring points, normal data quality information, non-out-of-range data, normal multi-selection measuring point data and timely data refreshing, the quality of the power production data is evaluated in real time according to the types of the measuring points, and the production data quality is comprehensively evaluated from the aspects of effectiveness, accuracy and timeliness of the data. Abnormal conditions in the production process are accurately positioned, the use value of data is guaranteed, and the requirements of power enterprises for big data analysis and data security management are met.
Owner:XIAN THERMAL POWER RES INST CO LTD

Method for automatically drawing DCS picture into real-time database picture

The invention relates to the technical field of computer graphic processing, and discloses a method for automatically drawing a DCS (Distributed Control System) picture into a real-time database picture, which comprises the following steps of: firstly, identifying a DCS source file format, directly analyzing a public text format or intercepting a bottom layer rendering instruction for a private binary format, and extracting standardized discrete data; constructing an intermediate vector model, and performing coordinate normalization and curve smoothing processing on the static primitives by using an affine transformation matrix; meanwhile, syntactic analysis is conducted on the control script to construct an abstract syntax tree, and dynamic logic is converted; then recombining a composite object based on spatial semantics, and repairing pipeline topology connection by utilizing automatic adsorption and an orthogonal routing algorithm; and finally, calling a target system interface to complete object instantiation and persistent storage. According to the invention, the automatic high-fidelity migration of the DCS picture to the real-time database is realized, the labor cost is reduced, and the consistency and accuracy of the monitoring picture are ensured.
Owner:NINGBO EASTSEA LINEFAN TECH CO LTD

Method and apparatus for parallel maintenance of power common information model based on fragmentation

The application provides a power common information model-based sharding parallel maintenance method and device and electronic equipment. The method comprises the following steps: dividing a power common information model into multiple shards according to a maintenance range division and a hierarchical relationship of the power common information model, each shard containing a complete hierarchical structure of the power common information model; generating an offline maintenance copy corresponding to each shard from a real-time database storing the power common information model according to the divided shards, the offline maintenance copy containing data of a model object in the power common information model; performing an add, delete, modify and query operation on the offline maintenance copy corresponding to each shard, and publishing the maintained shard offline maintenance copy to the real-time database.
Owner:NR ELECTRIC CO LTD +1

Intelligent environmental protection large model desulfurization scene identification interaction method, system, medium and product

The application provides a smart environmental protection large model desulfurization scene identification interaction method, system, medium and product, which comprises the following steps: firstly, the desulfurization role scene is matched through multi-modal instructions, and a graphical sand table and a global conversation state are initialized; after a diagnosis report generation instruction is received, multi-dimensional operation parameters of equipment associated with a role ID and a space-time context are obtained from a real-time database; a diagnosis result is obtained through analysis of a diagnosis large model and is mapped to a corresponding equipment graph element of the sand table; fault keywords are extracted to match a three-level differentiated solution scheme of quick solution, medium-term optimization and long-term upgrade; in response to a target scheme selection instruction, a quantitative evaluation result is generated through an efficiency estimation model combined with real-time working condition data, and finally, the result is visually presented to an interaction terminal. The whole process realizes a closed-loop intelligent interaction from intention recognition to decision support, and improves operation and maintenance efficiency and precision.
Owner:TIANJIN GUOLIAN ENERGY TECH CO LTD

Security test method and device for industrial real-time database and storage medium

The invention discloses a security test method and device for an industrial real-time database and a storage medium, and relates to the technical field of industrial internet. The method comprises the following steps: based on a three-security partition architecture, realizing security test on the industrial real-time database by verifying the transmission security of each interval. The logic isolation test between the first security zone and the second security zone emphatically checks access control strategies, industrial protocol transmission integrity and abnormal traffic filtering. The physical isolation test between the first security area or the second security area and the third security area comprises the steps of verifying one-way transmission and data integrity of the forward isolation device and verifying formats and security policies by the reverse isolation device. The cross-three-zone linkage transmission test covers end-to-end data transmission security verification, a simulation attack penetration test from a third security zone to a first security zone, and an emergency mechanism test under an isolation device fault. According to the method, the safety of the industrial real-time database can be improved through a three-partition testing method.
Owner:CHINA IND INTERNET RES INST

A deep reinforcement learning-based intelligent optimization method and system for a crude oil unit

ActiveCN121254787BSolve the optimization response lag problemFast Adaptive OptimizationChemical industryData set
The application discloses a kind of based on deep reinforcement learning's atmospheric and vacuum distillation unit intelligent optimization method and system, it is related to oil refining chemical industry, including, from the distributed control unit of atmospheric and vacuum distillation unit and real-time database collection historical operation data, and pre-processing, obtain the historical data set after pre-processing;Using the historical data set after pre-processing, process mechanism characteristic network is constructed by graph neural network, the correlation between equipment components is mined and abstract feature representing process principle is extracted, and digital twin environment is constructed;In digital twin environment, meta-reinforcement learning algorithm is used to train deep reinforcement learning agent, so that deep reinforcement learning agent obtains meta-strategy suitable for different crude oil properties.The application realizes safe, smooth, efficient intelligent optimization control through safety mirror image drill and trust degree driven closed-loop operation mechanism, solves the optimization response lag problem caused by manual adjustment model due to the change of traditional optimization technology crude oil property.
Owner:CISINFO

Data updating method, medium, apparatus, and computing device

Embodiments of the present disclosure provide a data updating method, medium, device and computing device. The method comprises: obtaining authorization information from a message queue, the authorization information comprising change information of authorization data; obtaining first target authorization data from a real-time database; extracting authorization data calculation logic from the authorization information; updating the first target authorization data by using the authorization data calculation logic, and storing the updated first target authorization data to the real-time database. According to the above scheme, the authorization information is obtained in real time through the message queue, and the authorization data in the database is updated, so that the data is updated in real time.
Owner:HANGZHOU NETEASE CLOUD MUSIC TECH CO LTD

A ship painting plant field environment monitoring system

The application discloses a kind of ship painting workshop field environment monitoring systems, including field detection unit, control center and data acquisition network, field detection unit is installed in the integrated monitoring point of ship painting workshop field, for measuring the environmental parameter of integrated monitoring point;Control center is connected with field detection unit by data acquisition network, receives the data collected by field detection unit;The control center at least includes real-time database and and software management system, and software management system includes eight functional modules of system management module, real-time display module, prediction analysis module, alarm management module, interface module, report management, basic data management and green evaluation system etc..The application precisely monitors and traces the environmental quality of painting workshop, realizes targeted management;It can also carry out multi-dimensional analysis on monitoring data, provide decision support for environmental pollution prevention and control, and enhance the rapid response and disposal capacity of environmental emergencies.
Owner:BEIJING RES INST OF AUTOMATION FOR MACHINERY IND +1

Methods, systems, equipment, and media for synchronizing configuration data in real-time database systems

This invention relates to a method, system, device, and medium for synchronizing configuration data in a real-time database system. The method includes: when a configuration client publishes configuration data for configuration updates, the business configuration synchronization modules of each node in the business subsystem receive the configuration data distributed by the configuration server and synchronize the configuration data to their respective nodes according to a configuration update strategy. When a user publishes configuration updates to various business subsystems of the real-time database, the configuration server synchronizes data with one or more first-level nodes in the system. Then, the first-level nodes synchronize data with their subscribed slave nodes. The subscribed slave nodes select the node with the highest version and latest priority from among the subscribed first-level nodes as the update data source. This invention, based on the interconnection of various configuration business nodes and using a multi-master, multi-slave strategy and a multi-stage publishing mechanism, ensures high availability and high performance of real-time database configuration distribution.
Owner:ZHEJIANG SUPCON SOFTWARE +1

Power production data quality monitoring method, system, equipment and medium

The invention belongs to the technical field of power production and operation core data index monitoring, and discloses a power production data quality monitoring method, system, device and medium, and the method comprises the steps: obtaining the production core data of each power generation enterprise, and storing the production core data in a real-time database of a power generation group; reading production core data of each power generation enterprise in a first preset time period before the current moment from a real-time database of the power generation group, and averaging the production core data to obtain an average value of the current production core data; comparing the average value of the current production core data with the average value of the production core data read last time to obtain an average value comparison result; according to the mean value comparison result and the change condition of the mean value of the current production core data in a second preset time period after the current moment, obtaining a power production data quality monitoring result; according to the invention, data problems can be timely and accurately found, load data conditions of groups and branch company units can be mastered anytime and anywhere, and potential problems can be timely found.
Owner:XIAN THERMAL POWER RES INST CO LTD +1

Transformer substation multi-machine real-time data synchronization method and system based on safety bus

The invention belongs to the technical field of transformer substation data communication, and particularly relates to a transformer substation multi-machine real-time data synchronization method and system based on a safety bus, and the method comprises the steps: obtaining the real-time operation data of a transformer substation, and building a transformer substation real-time database; performing communication connection between the transformer substation host and the transformer substation standby machine by adopting an encrypted and authenticated security bus; based on the obtained communication connection and a real-time database, determining a communication link between the transformer substation host and the transformer substation standby; according to the determined communication link, the substation host and the substation standby respectively send own communication equipment lists to each other through a safety bus; and based on the communication link and the communication equipment list, the transformer substation host and the transformer substation standby respectively carry out data processing to complete real-time data synchronization.
Owner:SHANDONG LUNENG SOFTWARE TECH

A real-time database monitoring method based on ordered queue

The application discloses a kind of real-time database monitoring methods based on ordered queue, including according to system design throughput and machine configuration, set initial parameter respectively set working thread and distribution thread number and memory capacity alarm threshold, according to the number of working thread adjustment shunt storage queue number ensure that thread queue number match, management node starts, start receiving heartbeat request, and according to preset hash algorithm is shunted storage, new received heartbeat request is stored in ordered double linked list queue head, then according to host IP information to hash table inquires whether heartbeat record exists, if the new received heartbeat record does not exist, for new online client, client information is stored to hash table then triggers new online event and persists to client database table write-in process ends.The application solves the problem that a large amount of data heartbeat information detection detection complexity rises exponentially with data volume rising by hash and double linked list structure.
Owner:CHINA TELECOM CLOUD TECH CO LTD

Transactionally consistent database exports

Techniques for data management are described. A file may be saved that includes a representation of an exported database, where the representation may be based on a live database being exported from a computing system via an export operation that spans a time period. A determination that one or more transactions were committed to the live database during the time period may be made. Based on the determination, a log indicating the one or more transactions may be obtained from the computing system. Based on the log, a determination of whether the exported database captured the one or more transactions may be made. Based on the determination, the file may be updated to represent an updated database that reflects an updated version of the live database, the updated version of the live database reflection application of the one or more transactions to the exported database.
Owner:RUBRIK INC

Veneer reeling machine production task dynamic scheduling method and system based on equipment state perception

The invention provides a veneer reeling machine production task dynamic scheduling method and system based on equipment state perception, and relates to the technical field of production scheduling, and the method comprises the steps: obtaining an equipment real-time database; performing feature extraction on the equipment real-time database to obtain an equipment real-time feature set; analyzing the equipment real-time feature set by applying a preset threshold rule, outputting a preliminary health level state, and updating the equipment real-time feature set based on the preliminary health level state; based on the updated real-time feature set of the equipment, deep evaluation of the health state of the equipment is realized, and a comprehensive state diagnosis result of the equipment is obtained; and obtaining a production task, and constructing a dynamic scheduling scheme in combination with the equipment comprehensive state diagnosis result. The technical problems that in the prior art, efficient and reliable scheduling of production tasks of the plate rolling machine is difficult to achieve, and production plan interruption and overall efficiency reduction are easily caused by sudden equipment failures are solved.
Owner:SHIP LIFT (DALIAN) CO LTD

Real-time database adaptive curve compression method and system

The invention discloses a real-time database adaptive curve compression method and system, and belongs to the technical field of industrial real-time database time sequence data compression. The method disclosed by the invention comprises the following steps: S1, carrying out dynamic segmentation processing on a to-be-compressed time sequence data stream to obtain a plurality of data segments; s2, according to the obtained multiple data segments, calculating four control points of a Bezier curve corresponding to each data segment, and according to the data segments of the four control points, performing fitting to generate the Bezier curve; s3, performing maximum error verification on the generated Bezier curve, if the maximum error verification is met, outputting a compression curve fitted by four control points, and if the maximum error verification is not met, re-segmenting the control points which do not meet the error verification, and executing S2 on the newly segmented data segments until the maximum error verification is met; and S4, substituting parameters of the Bezier curve into the compression curve to carry out curve interpolation solution. According to the method, the technical problems of trend feature loss and poor static compression mechanism adaptability of the existing method are solved.
Owner:HUANENG POWER INT CO LTD RIZHAO POWER PLANT +2

Polymer film quality inspection system with real-time data comparison

The invention discloses a real-time data comparison polymer film quality inspection system, which relates to the technical field of film quality inspection, and comprises a first detection module, a second detection module, a third detection module and a surface defect final inspection module, the four detection modules are sequentially arranged along a conveying path of a polymer film production line and are respectively connected with the central processing unit through shielded twisted pairs, and the central processing unit receives film related data acquired by the four detection modules and processes and analyzes the data through a built-in comparison algorithm. The central processing unit is in signal connection with the real-time database server, the alarm execution module and the visualization module. According to the invention, by installing the four detection modules with complementary functions, the function of multi-dimensional comprehensive detection is realized, synchronous online detection of four key quality indexes of film thickness, components, light transmission and surface defects is realized, the coverage is comprehensive, and a data basis is provided for subsequent data comparison and process adjustment.
Owner:NANTONG CANGFENG NEW MATERIAL TECH CO LTD

Data automatic synchronization method and system for active-active architecture real-time database

The invention belongs to the technical field of electric signal data processing, and discloses a data automatic synchronization method and system for an active-active architecture real-time database, and the method comprises the steps: after a real-time database service is started, one end of a main database is responsible for processing a time sequence data write-in request of a client, and after the main database receives data, the main database is responsible for processing a time sequence data write-in request of the client; writing the data into a synchronous data queue, and writing the data into storage; when data exists in the synchronous data queue, writing the data into a synchronous cache file, and preparing to send the data to a slave library for synchronization; comparing the metadata information of the master library with the metadata information of the slave library, querying whether the metadata versions are consistent or not, and when the metadata are not synchronized, pausing data synchronization and performing metadata synchronization; under the metadata synchronization condition, the data synchronization process continues; and after receiving the synchronous data, the slave library writes the synchronous data. According to the method, the data synchronization rate of the two ends of the real-time database of the active-active architecture is improved, and the complete consistency and high availability of the data are ensured.
Owner:XIAN THERMAL POWER RES INST CO LTD +1