Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

39results about How to "Durability impact" patented technology

Preparation device and preparation method of directional steel fiber reinforced concrete prefabricated component

The invention relates to the field of prefabricated type concrete structures, and particularly discloses a preparation device of a directional steel fiber reinforced concrete prefabricated component.The preparation device comprises a bottom supporting frame, the supporting frame is a rectangular metal frame, two first sliding rails in the horizontal direction are arranged on the upper surface ofthe supporting frame, and the two first sliding rails are symmetrically arranged; a coil is arranged on the first sliding rails, pulleys are fixed to the bottom of the coil, and the coil is slidably connected to the first sliding rails through the pulleys; two symmetrically-arranged steel supports are placed at the bottom of the supporting frame, the upper surfaces of the steel supports are located in the internal space of the coil, the steel supports are located between the two first sliding rails, a non-metal formwork is placed on the steel supports and penetrates through the coil, and vibrating rods are arranged on the coil; and a current exchanger is further arranged beside the supporting frame and electrically connected with the coil. The preparation device aims to solve the problem that tensile strength of a concrete matrix is insufficient due to steel fiber random distribution and low unidirectional reinforcement efficiency in an existing steel fiber concrete component.
Owner:TAIZHOU UNIV

Concrete curing device and curing method for winter construction in cold region

ActiveCN109940751AWell-maintained locationAvoid the defect of incoherent maintenance effectCeramic shaping apparatusPhase-change materialEnergy consumption
The invention relates to a concrete curing device and a curing method for winter construction in a cold region. During winter construction in the cold region, a current concrete curing measure is highin energy consumption, has potential safety hazard, and is difficult to fit for concrete curing in winter in the cold region. The curing device is a rectangular frame body sequentially enclosed by four side plates, wherein concrete is filled in the rectangular frame body; a top plate and a bottom plate are horizontally arranged on the top part and the bottom part of the rectangular frame; a phase-change material layer is arranged on the outer wall of a template frame and is an electrified and heat-storage layer body; and a heat insulating layer is arranged on the outer wall of the phase-change material layer. According to the method provided by the invention, the phase-change material layer located between the template frame and the heat-insulating layer transfers heat to the concrete through the template frame, and continuously heats and cures the concrete through a repetitive heating and heat releasing way. The concrete curing device and the curing method for winter construction inthe cold region provided by the invention are used for concrete curing in winter site construction in the cold region.
Owner:HARBIN INST OF TECH

Horizontal embedded anchorage foundation

The invention relates to a horizontal embedded anchorage foundation and relates to the technical field of bridge engineering. The horizontal embedded anchorage foundation comprises an anchor body, anembedded wall, a buttress, a cable-stayed beam and an anchor chamber. As the embedded wall is arranged below the bottom surface of the anchor body and is horizontally embedded in bed rock, a larger part of anti-slip bearing capacity can be provided for the anchorage foundation; and compared with a gravity type anchorage foundation, the required anchor body weight is smaller when the same; in addition, a boss is arranged at the bottom of the anchor body to meet the requirement of an anchoring system for an anchoring space, and the situation that the foundation pit excavation amount is increaseddue to overall downward moving of the anchor body base surface can be avoided; and the bottom surface of the boss is arranged on the sea level or above the underground water level line, so that underground water can be prevented from immersing into the anchor body to influence the durability of the main cable anchoring system anchored in the anchor body boss. Therefore, the anchor foundation scale can be reduced, the material consumption can be reduced, the mountain excavation amount can be reduced, and the durability of a main cable anchoring system can be ensured.
Owner:CHINA MAJOR BRIDGE ENERGINEERING

Anti-slip device for existing cable clamp of flexible suspension bridge and method

The invention discloses an anti-slip device for an existing cable clamp of a flexible suspension bridge and a method. The anti-slip device includes a limiting mechanism, the limiting mechanism includes two cable clamp buckles and a fastener, each cable clamp buckle includes a clamping part and a lug plate, the two clamping parts form a clamping buckle for clamping a steel cable, and the inner sideof the clamping buckle is provided with a clamping groove; the use method comprises the steps of determining the size of the clamping groove, processing the cable clamp buckles and installing the limiting mechanism. According to the anti-slip device, through the arrangement of the limiting mechanism, the existing cable clamp is effectively limited, the relative sliding between the existing cableclamp and a main cable is limited, and the reliability and durability of the existing cable clamp are ensured; the middle of the clamping buckle is provided with the spiral clamping groove, the friction force and biting force between the clamping buckle and the main cable are increased, the anti-slip force of a limiting body is effectively increased, the purpose of limiting the existing cable clamp is accordingly achieved, the change of the line shape and appearance of the main cable is prevented, and the durability of the bridge is influenced.
Owner:ZHONGJIAO TONGLI CONSTR

Concrete pipe pile offshore pile sinking construction method

InactiveCN110777780AReduce roughnessInjection resistance decreasesBulkheads/pilesStructural engineeringSandcrete
The invention belongs to the technical field of offshore pile sinking, and discloses a concrete pipe pile offshore pile sinking construction method. The method comprises the steps that firstly, a grouting rotary spraying pipe for high-pressure nozzle operation and a prefabricated concrete pipe pile are vertically placed over a pile sinking position, and the concrete pipe pile is arranged outside the grouting rotary spraying pipe in a sleeving mode and clamped and fixed through a pile holding device; then, drilling and high-pressure rotary spraying operation are carried out, after the groutingrotary spraying pipe descends by a section depth, the concrete pipe pile is downwards conveyed by the same section depth through the pile holding device, and the steps are repeated until the concretepipe pile reaches the designed elevation position; then, the grouting rotary spraying pipe is upwards lifted out of the concrete pipe pile; and finally, standing and curing are carried out until the strength of cement sand meets the requirement. According to the method, the problem that the concrete pipe pile is difficult to sink due to the strong friction resistance of the sand in the high-stressstate to the pile wall can be effectively solved, the connection strength of the sand and the pile interface can be effectively improved, the effective pile diameter of the concrete pipe pile is enlarged, the bearing capacity is improved, one-time construction of offshore pile sinking can be realized, and the construction period is saved.
Owner:TIANJIN UNIV

Digital full-color pen connecting method for repairing ancient calligraphy and painting

The invention belongs to the technical field of cultural relic protection. The invention particularly discloses a digital full-color pen connecting method for repairing ancient calligraphy and painting. The method comprises the following steps: firstly, carrying out high-precision scanning on ancient calligraphy and painting before full color, then carrying out full-color pen connection on incomplete parts of the ancient calligraphy and painting in a computer by using digital painting software, then carrying out color correction on the whole process by using a color management system, and finally copying repaired works by using artistic micro-spraying equipment. The problems that original artistic styles of the ancient calligraphy and paintings are damaged due to the fact that no basis isprovided for pen connection during ancient calligraphy and painting restoration, and picture content cannot be comprehensively displayed during ancient calligraphy and painting exhibition due to the fact that pens cannot be connected are solved. The method is quick and safe to operate and high in reversibility, does not influence the strength, color, durability and other properties of the ancientpainting and calligraphy image layer, and conforms to the principle of minimum intervention of cultural relic protection.
Owner:XIAN TECHNOLOGICAL UNIV

Refrigeration cycle device

A refrigeration cycle device comprises a heat pump cycle (10), a high-temperature-side heat medium circuit (21), and a low-temperature-side heat medium circuit (30). The heat pump cycle has a compressor (11), a high-temperature-side heat medium-refrigerant heat exchanger (12), a heat absorption decompression unit (14b), and a low-temperature-side heat medium-refrigerant heat exchanger (16). The high-temperature-side heat medium circuit has a heat exchanger (23) for heating that exchanges heat between a high-temperature-side heat medium and a fluid of which the temperature is to be adjusted. The low-temperature-side heat medium circuit has a plurality of heat absorption devices (31, 32, 36, 38) that causes heat to be absorbed in a low-temperature-side heat medium flowing out from the low-temperature-side heat medium-refrigerant heat exchanger; and heat absorption amount adjusting parts (33, 33a, 35a, 35b, 37) that change the heat absorption amounts of the low-temperature side heat mediums in the heat absorption devices, respectively. When the heat absorption amount adjusting parts change the heat absorption amounts of the low-temperature side heat mediums in the heat absorption devices, respectively, the refrigeration cycle device reduces the flow rate of a refrigerant flowing into the low-temperature-side heat medium-refrigerant heat exchanger.
Owner:DENSO CORP

An underground energy storage device arranged in an underground continuous wall

An underground energy storage device arranged in an underground diaphragm wall comprises an air compressor, gas storage steel pipe tail sections, main gas storage steel pipes, continuous gas storage steel pipe sections and oblique gas storage steel pipe sections, wherein the two ends of each continuous gas storage steel pipe section are connected with the corresponding oblique gas storage steel pipe section and the corresponding gas storage steel pipe tail section respectively to form an independent gas storage steel pipe unit; one independent gas storage steel pipe unit is pre-buried in each of the two sides of each underground diaphragm wall unit; the two oblique gas storage steel pipe sections inside each underground diaphragm wall unit are connected with the first main gas storage steel pipe; the two gas storage steel pipe tail sections inside each underground diaphragm wall unit are connected with the second main gas storage steel pipe; the air compressor is arranged at one end of the first main gas storage steel pipe; one end of the second main gas storage steel pipe is an air outlet pipeline. By the adoption of the structure, the space inside the underground diaphragm wall is fully utilized, a compressed air energy storage system is formed without affecting the stability of the underground diaphragm wall, and the functions of cool supply, heat supply, pressure potential energy power generation and deformation detection of the underground diaphragm wall are achieved.
Owner:CHINA THREE GORGES UNIV

A concrete maintenance device and maintenance method for winter construction in cold regions

ActiveCN109940751BWell-maintained locationAvoid the defect of incoherent maintenance effectCeramic shaping apparatusInsulation layerArchitectural engineering
The invention relates to a concrete curing device and a curing method for winter construction in a cold region. During winter construction in the cold region, a current concrete curing measure is highin energy consumption, has potential safety hazard, and is difficult to fit for concrete curing in winter in the cold region. The curing device is a rectangular frame body sequentially enclosed by four side plates, wherein concrete is filled in the rectangular frame body; a top plate and a bottom plate are horizontally arranged on the top part and the bottom part of the rectangular frame; a phase-change material layer is arranged on the outer wall of a template frame and is an electrified and heat-storage layer body; and a heat insulating layer is arranged on the outer wall of the phase-change material layer. According to the method provided by the invention, the phase-change material layer located between the template frame and the heat-insulating layer transfers heat to the concrete through the template frame, and continuously heats and cures the concrete through a repetitive heating and heat releasing way. The concrete curing device and the curing method for winter construction inthe cold region provided by the invention are used for concrete curing in winter site construction in the cold region.
Owner:HARBIN INST OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products