34results about How to "Reduce on-site construction costs" patented technology

Intelligent identification method of road traffic status

The invention relates to an intelligent identification method of a road traffic status. In the method, road section traffic statuses are defined into five grades of smoothness, normality, crowdness, blockage and severe blockage, and traffic flow ratios and occupation ratios are both defined into five grades of very small, small, medium, large and very large; a fuzzy reasoning method is used for intelligently identifying the road section traffic statuses; mode combination is carried out to form a fuzzy relation according to the traffic flow ratio, the traffic occupation ratio and a traffic status rule, and then actual measurement data of the traffic flow ratio and the occupation ratio is used as an input to work out a fuzzy set; and finally, the traffic status at that time is obtained by adopting fuzzy decision. The invention has the advantages that the traffic status is synergetically measured by the two main parameters: the traffic flow ratio and the occupation ratio, thus the accuracy is high; only one traffic flow detector needs to be arranged for measuring the traffic flow and the occupation ratio, thus the site construction cost is lower; and the traffic statuses are expanded to five grades, thus the integrity and the systematicness are high.
Owner:TRAFFIC MANAGEMENT RES INST OF THE MIN OF PUBLIC SECURITY

Gravel masonry dam material filling construction method in cold region

The invention discloses a gravel masonry dam material filling construction method in a cold region. The construction method includes: plane surveying of filling units; side boundary measuring and paying off of the filling units; acceptance inspection of basic planes; material exploitation, material feeding and material discharging; digging and loading of filling materials, and water adding outside a dam; material leveling and layer thickness controlling; watering replenishing; grinding; and grinding quality checking. The material exploitation is performed in a belt-shaped interval exploitation method, namely, when stock ground exploitation is performed in non-low-temperature seasons, a belt-shaped material source is reserved for exploitation in low-temperature seasons during the exploitation, and by means of natural water loss of the reserved belt-shaped material source, moisture content in gravel stone materials is lower than 2%; and the grain size of the gravel masonry dam shell materials is smaller than 0.075mm, particle content is lower than 3%, moisture content is no lower than 5%, and nonuniform coefficient Cu is larger than or equal to 15. The gravel masonry dam material filling construction method solves the technical problem of uneven sediment of deep covering layer in the dam body filling by stages, fully utilizes gravel masonry dam shell material filling construction in low-temperature seasons of winter to speed up engineering process, and ensures construction image and construction quality.
Owner:中国安能集团第三工程局有限公司

Heat transfer surface and microporous flow passages or small-hole flow passages integrated planar perforated-plate heat exchanger

The invention relates to a heat transfer surface and microporous flow passages or small-hole flow passages integrated planar perforated-plate heat exchanger which comprises a flow distribution pipe, a flow collection pipe and a heat exchange perforated plate. The heat exchange perforated plate is connected between the flow distribution pipe and the flow collection pipe, the heat exchange perforated plate is internally and parallelly provided with a plurality of microporous flow passages or small-hole flow passages, and two ends of the microporous flow passages or the small-hole flow passages are communicated with the flow distribution pipe and the flow collection pipe respectively. Sections of the flow distribution pipe and the flow collection pipe are C shaped, and two ends of the heat exchange perforated plate are welded C-shaped openings of the flow distribution pipe and the flow collection pipe respectively to form an integral flow passage communicated structure. Compared with a traditional capillary network heat exchanger, the planar perforated-plate heat exchanger structurally has the advantages of avoidance of secondary construction for forming of the heat exchange surface, high heat exchange efficiency, low cost, convenience in mounting and the like.
Owner:王文虎

Pressing block and roof photovoltaic system comprising same

The invention discloses a pressing block and a roof photovoltaic system comprising the same. The pressing block comprises a pressing plate and two side plates arranged on two opposite sides of the pressing plate; the two side plates are abutted against the same surface of the pressing plate, and a clamping groove is formed by the pressing plate and the two side plates in a surrounding mode; the outer side wall on one side, far away from the clamping groove, of the side plate is provided with a pressing piece used for pressing a photovoltaic module; the outer side wall on one side, far away from the clamping groove, of the side plate is provided with a clamping part used for clamping the photovoltaic module; the pressing piece is arranged close to the bottom of the clamping groove; and theclamping part is arranged close to the opening of the clamping groove. According to the pressing block, the upper surface of the photovoltaic module does not need to be perforated and damaged, so thata water leakage phenomenon is avoided, and the phenomenon that the photovoltaic module breaks down due to rainwater entering caused by the perforation is avoided; and the construction cost and the later maintenance cost are lowered, firmness and reliability are achieved, and the wind resistance is excellent.
Owner:ARCTECH SOLAR HLDG CO LTD

Pole tower prefabricated assembly type concrete stepped foundation and assembling method thereof

The invention relates to a pole tower prefabricated assembly type concrete stepped foundation and belongs to the technical field of power communication transmission equipment. The pole tower prefabricated assembly type concrete stepped foundation comprises a core column, a stepped hoop and steel plate connecting keys. The core column comprises a plurality of splicing columns. The splicing columnsare of the same structure and are sequentially spliced into the core column through splicing grooves and splicing strips. The core column comprises an upper column body and a lower prismoid body fixedto the lower end of the upper column body. The stepped hoop comprises a plurality of annular sleeves with different outer diameters and inner diameters. The multiple steel plate connecting keys are mounted on the outer side of the core column and the periphery of the upper end of the stepped hoop. The steel plate connecting keys are fixed to the upper end of the stepped hoop through embedded anchors. The steel plate connecting keys are fixed to the core column through through anchor bars. The pole tower prefabricated assembly type concrete stepped foundation is ingenious in structure design,all construction projects are changed into all prefabricated modules, by splicing all the modules, the operation efficiency is improved, the construction period is shortened, and an assembling methodof the pole tower prefabricated assembly type concrete stepped foundation is simple and convenient to operate.
Owner:JIANGSU ELECTRIC POWER CO +2

Beam-slab integrated precast concrete structure and construction method

The invention relates to a beam-slab integrated precast concrete structure and a construction method. The beam-slab integrated precast concrete structure comprises precast beam-slab units, precast laminated frame beams, concrete stand columns and a cast-in-place concrete surface layer; the concrete stand columns are distributed in an array mode, and bearing pieces A and B are arranged at the upper ends of the concrete stand columns; the two ends of the precast laminated frame beams are erected at the upper ends of the adjacent concrete stand columns correspondingly, and each precast laminated frame beam is provided with a bearing piece C; the precast beam-slab units are arranged between the two parallel precast laminated frame beams; the precast beam-slab units, the top surfaces of the precast laminated frame beams and all beam column joints are cast in place with concrete to form the cast-in-place concrete surface layer; the construction method comprises the steps that firstly, array construction of the concrete stand columns is completed; and then the precast beam-slab units and the precast laminated frame beams are installed in order, and finally the cast-in-place concrete surface layer is poured. The beam-slab integrated precast concrete structure and the construction method have the advantages that support-free and mold-free construction of precast concrete structure on-site construction is achieved, the construction speed can be remarkably increased, and the on-site construction cost is remarkably reduced.
Owner:FCEC PREFABRICATED BUILDING RES INST CO LTD

Self-supporting semi-dry method prefabricated column connection and construction method thereof

The invention discloses a self-supporting semi-dry method prefabricated column connection and a construction method thereof. The connection comprises an upper prefabricated column and a lower prefabricated column, wherein a first reserved hole is formed in the lower end of the upper prefabricated column, a second reserved hole is formed in the upper end of the lower prefabricated column, the firstreserved hole and the second reserved hole are opposite to each other, an enclosed area is used for placing a shear resistant mechanism and pouring mortar, a connecting box and a first longitudinal rib are arranged in the upper prefabricated column, a second longitudinal rib is arranged in the lower prefabricated column, and a top plate and a bottom plate of the connecting box are correspondinglyconnected with the first longitudinal rib and the second longitudinal rib; the construction method comprises the following steps that a, the end head of the first longitudinal rib is screwed into aninner threaded hole; b, the shear resistant mechanism is placed in the first reserved hole and the second reserved hole; c, the second longitudinal rib penetrates through a bottom plate hole and is fixed by a bolt; and d, the mortar is filled through a first reserved hole channel and a second reserved hole channel. According to the self-supporting semi-dry method prefabricated column connection and the construction method thereof, the anti-seismic performance of a prefabricated column connecting node can be basically equivalent to that of a cast-in-place column, a design method of the cast-in-place column can be used continuously, and the engineering design is facilitated.
Owner:SOUTHEAST UNIV

AGV integrated navigation positioning method based on vision and imu or odometer

The invention discloses an AGV combined navigation and positioning method based on vision and IMU or odometer, belonging to the technical field of automatic control, including four steps of establishing a coordinate system, setting configuration files, AGV initialization and combined positioning. The controller processes the two-dimensional code information to obtain the initial pose of the AGV; when the visual camera collects effective ground information, the controller uses the Kalman filter algorithm to fuse vision and IMU or odometer data to correct the positioning error and complete the integrated navigation positioning. The beneficial effects of the present invention are: get rid of the dependence of the traditional method on special reference objects, only need the existing common ground reference objects, greatly reduce the cost, difficulty and workload of on-site construction; do not rely on radio frequency positioning signals (such as UWB, WIFI , Bluetooth, etc.), suitable for applications in complex electromagnetic environments such as stage theaters; the visual camera shoots the ground, and is not afraid of being blocked by people or obstacles (such as laser reflectors, lidar, etc.), suitable for applications in dynamic unstructured environments.
Owner:石家庄辰宙智能装备有限公司

Special channel-type multifunctional pipe box for marine modular drilling machine

The invention discloses a special channel-type multifunctional pipe box for a marine modular drilling machine. The special channel-type multifunctional pipe box for the marine modular drilling machine comprises a box body. A channel is arranged on the top of the box body. Supporting structures are arranged on the two sides of the box body. One end of the box body is connected with a DES module backflow tank, and the other end of the box body is arranged above a DES module slurry trough. The box body is divided into two spaces by a partition plate in the box body, and the two spaces do not communicate with each other. One end of the first space communicates with the upper portion of the DES module backflow tank. The second space is sealed relative to the DES module backflow tank. A pipe nozzle is arranged on the side portion of the second space. The bottom of the other end of the first space and the bottom of the other end of the second space are provided with liquid drainage holes right opposite to the DSM module slurry trough. By means of the special channel-type multifunctional pipe box for the marine modular drilling machine, the technical problems that as for a traditional marine modular drilling machine, a pipeline 16'' from the DES module backflow tank to the DSM module slurry trough occupies part of the height space of a safety channel and interference exists between an outlet bend of the backflow pipeline 16'' and the DSM module slurry trough are thoroughly solved.
Owner:CHINA NAT OFFSHORE OIL CORP +2

Intelligent identification method of road traffic status

The invention relates to an intelligent identification method of a road traffic status. In the method, road section traffic statuses are defined into five grades of smoothness, normality, crowdness, blockage and severe blockage, and traffic flow ratios and occupation ratios are both defined into five grades of very small, small, medium, large and very large; a fuzzy reasoning method is used for intelligently identifying the road section traffic statuses; mode combination is carried out to form a fuzzy relation according to the traffic flow ratio, the traffic occupation ratio and a traffic status rule, and then actual measurement data of the traffic flow ratio and the occupation ratio is used as an input to work out a fuzzy set; and finally, the traffic status at that time is obtained by adopting fuzzy decision. The invention has the advantages that the traffic status is synergetically measured by the two main parameters: the traffic flow ratio and the occupation ratio, thus the accuracy is high; only one traffic flow detector needs to be arranged for measuring the traffic flow and the occupation ratio, thus the site construction cost is lower; and the traffic statuses are expandedto five grades, thus the integrity and the systematicness are high.
Owner:TRAFFIC MANAGEMENT RES INST OF THE MIN OF PUBLIC SECURITY

Outside-cabinet auxiliary guide rail device for floor type circuit breaker of switch cabinet

ActiveCN112952624AEasy to adapt to assembly needsAssembly accuracy is lowSwitchgearControl theoryCircuit breaker
The invention relates to an outside-cabinet auxiliary guide rail device for a floor type circuit breaker of a switch cabinet, and the device comprises guide rail assemblies at two sides, which are distributed at intervals in the left-right direction, and are used in cooperation to provide slope support, thereby guiding the floor type circuit breaker to climb forward to enter the switch cabinet; the guide rail assembly on each side comprises a base used for being supported on a corresponding fixed foundation; and a guide rail plate which extends along the front-back direction and is used for supporting and guiding the floor type circuit breaker; wherein the guide rail plate is installed on the base in a pitching adjustable mode along an arc path so that the height of the guide rail plate can be adjusted according to actual needs. The guide rail plate is installed on the corresponding base in a pitching adjustable mode along the arc path, the guide rail plate can be adjusted to the proper height according to the actual height requirement, then the assembly requirements of installation places with different heights can be conveniently met, the assembly precision requirement for the installation position height can be effectively lowered, and the site construction cost is lowered.
Owner:TIANJIN PINGGAO INTELLIGENT ELECTRIC +2

Water-saving type fabricated concrete manure ditch and mounting method thereof

The invention discloses a water-saving type fabricated concrete manure ditch and a mounting method thereof. The manure ditch comprises a plurality of prefabricated foundations, prefabricated slope adjusting beams, first prefabricated folded plates, second prefabricated folded plates, prefabricated leveling strips and prefabricated leaking seam plates, wherein the prefabricated foundations are sequentially placed in an excavated foundation trench in pairs in the front-back direction; each prefabricated slope adjusting beam is erected between every two paired prefabricated foundations; each first prefabricated folded plate is erected between every two adjacent prefabricated slope adjusting beams; each second prefabricated folded plate is located between every two adjacent prefabricated slope adjusting beams and erected on every two corresponding first prefabricated folded plates; the prefabricated leveling strips are placed at the tops of the first prefabricated folded plates and the second prefabricated folded plates; and each prefabricated leaking seam plate is erected between every two rows of prefabricated leveling strips. During mounting, the prefabricated foundations are placed in the foundation trench firstly, and then other prefabricated components are mounted in order to achieve mounting of the manure ditch. The water-saving type fabricated concrete manure ditch and the mounting method thereof have the advantages that the longitudinal gradient of the manure ditch can be ensured, meanwhile, the dimensional precision of the manure ditch with the special-shaped section is ensured, the surface smoothness of the inner side of the manure ditch is improved, the water-saving type fabricated concrete manure ditch adapts to the site transportation condition of pig farm construction, the construction speed can be remarkably increased, and the construction cost can be reduced.
Owner:福州鼓楼区智慧乐享科技合伙企业(有限合伙)

Method for implementing fabricated concrete house building by using members with novel connecting ends

PendingCN114370108AQuality improvementGood heat insulation, sound insulation and heat insulation functionConstruction materialHeat proofingHouse buildingRebar
The invention relates to a method for implementing fabricated concrete house building by using a member with a novel connecting end, which is characterized in that stress member columns and beams (including a roof truss beam and a stair beam) for fabricated construction have the following common characteristics: the end surfaces of the stress member columns and beams are plates integrally welded with reinforcing bars in the members, a plurality of holes are formed in the plates, and a certain distance is reserved between the plates and concrete on the back surfaces of the plates; therefore, the components can be conveniently connected through high-strength bolts. After the components are mutually connected, concrete can be conveniently poured at the connecting position, the connecting strength of the finished component nodes is not lower than or even higher than the strength of the nodes finished through the technology that the concrete is poured after steel bars are bundled on site, and the frame assembled on site actually becomes a whole. And on-site concrete pouring is only carried out at the joints, and the pouring amount is far smaller than that of traditional concrete construction. Aerated concrete wallboards are adopted in the maintenance system, and it is guaranteed that the building has good heat preservation, sound insulation and heat insulation functions. The method has the beneficial effects that the assembly rate of a concrete assembly type building is greatly improved; the investment of a concrete member factory is reduced; the supply distance of a concrete member factory is expanded; the on-site construction cost is reduced, and the house building quality is improved.
Owner:万平华 +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products