Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

40results about How to "Strong turnover" patented technology

Construction technology of one-time molding of concrete pouring on top of construction column and construction device thereof

The invention provides a construction technology of one-time molding of concrete pouring on the top of a construction column and a construction device thereof. The construction device comprises a concrete beam plate, a reinforcement cage and a first construction column template; the reinforcement cage is arranged on the lower portion of the concrete beam plate, and the reinforcement cage is connected with the concrete beam plate in an anchoring mode; a first construction column template and a second construction column template are correspondingly arranged on two sides of a wall body; and template wood beams are arranged on the outer sides of the first construction column template and the second construction column template. Through improvement of the construction technology of the one-time molding of the concrete pouring on the top of the construction column and the construction device thereof, the construction column being cast and molded at one time is realized; and the protruded concrete at the feed opening portion at the top end does not need to be chiseled. The construction technology and the construction device have the advantages that the operation is convenient, the pouring quality is excellent, recycle is convenient, manpower is saved, the construction cost is lowered and the construction period is shortened, and therefore the problem and the defect in the backgroundtechnology are effectively solved.
Owner:JIANGSU SUZHONG CONSTR GROUP

Reinforced composite board and production technology thereof

The invention relates to the technical field of boards, in particular to a reinforced composite board and a production technology thereof. The reinforced composite board comprises a color steel plate layer formed by a steel plate which is subjected to baking varnish treatment, and a fireproof material layer compounded on the color steel plate layer; and is characterized in that at least one reinforced rib layer is arranged between the color steel plate layer and the fireproof material layer or inside the fireproof material layer. The invention has the beneficial effects that the structure is novel and simple, and the original board is internally additionally provided with the reinforced rib layer, thus greatly improving tensile property and toughness and using strength of boards, preventing cracking of core material caused by heat expansion and cold contraction, transportation, installation and the like, improving the repeated using property of a product, achieving the purpose of saving energy, and having the advantages of green and environmental protection property, non-ignitable property and fire resistance, high efficiency and heat insulation, ventilation and mould resistance, water resistance, good weather resistance, strong revolving capability and the like; in addition, the production technology is simple, the cost is low, and the properties are good, thus being widely applied to the fields of temporary buildings, road sound-proof walls, refrigeration, freezing storehouses and the like.
Owner:SHANGHAI JITUO STEEL STRUCTURE

Material storing device for constructional engineering

The invention provides a material storing device for constructional engineering and belongs to the technical field of building construction. A supporting frame comprises at least four supporting bodies; each supporting body comprises a pedestal and an upright post; each upright post is provided with a plurality of sleeves; the upper part of each upright post is provided with an angle regulating device; each set of storing unit comprises a cross brace, a lifting ring and a universal wheel; the two ends of each cross brace horizontally extend toward the outer side to form horizontal rods; the end part of each horizontal rod is bent downwards to form a vertical rod; every two lifting rings are correspondingly arranged on the horizontal rods at the two ends of the corresponding cross brace; the universal wheels are arranged at the bottoms of the cross braces in a spaced manner; the vertical rods at the two ends of each storing unit are correspondingly inserted into the sleeves of the upright posts which are arranged oppositely; a shielding device comprises a controller, an alarming machine and two shielding plates; the top of each shielding plate is provided with a humidity sensor; oneshielding plate is connected with the angle regulating device on the upright post at one side; and the other shielding plate is connected with the angle regulating device on the upright post at the other side. The material storing device is reasonable in structure, realizes classified storage of building materials and lowers the engineering cost investment.
Owner:HENAN UNIV OF ECONOMICS & LAW

Building plastic formwork and preparation method thereof

The invention discloses a building plastic formwork and a preparation method thereof. The formwork consists of an upper layer, a lower layer and a middle layer, wherein the upper layer and the lower layer are both prepared from co-polypropylene, the middle layer is prepared from the following raw materials in percentage by weight: 25%-35% of polyethylene, 37.5%-45% of co-polypropylene, 18%-25% of polypropylene fiber, 3%-7% of calcium-magnesium powder and 1.5%-3% of a defoaming agent. The preparation method comprises the following steps: 1), mixing raw materials of the middle layer uniformly; 2), loading the uniformly mixed raw materials in step 1) for plastification; 3), performing plastification on co-polypropylene and performing vertical dividing; 4), performing extrusion forming on extruded and plastified materials in step 2) and materials subjected to dividing in step 3) simultaneously, cooling and polishing, and making air holes and nail holes, naturally cooling after punching, and finally performing edge cutting, shaping and dimensioning. The building plastic formwork has the advantages that good waterproofness, wear resistance, toughness, high stress resistance, high easiness in demoulding are realized, and the formwork can be repeatedly used and recycled. The preparation method is simple in process, low in preparation cost and suitable for industrial production.
Owner:HONGHU EWANG PLASTIC PROD

Coke oven top plate pipe laid assembled type fixing rack and assembling method thereof

InactiveCN106753447AEasy to control displacementEasy to removeCoke oven detailsEngineeringTower
The invention discloses a coke oven top plate pipe laid assembled type fixing rack which comprises a plurality of pre-laid bar dowels, a plurality of longitudinal horizontal tubes, a plurality of transverse horizontal tubes, a plurality of lower laid ejection tubes, a plurality of laid cleaning tubes, a plurality of laid temperature testing tubes and a plurality of control elevation short tubes, wherein the pre-laid bar dowels are pre-laid on frame column heads of a coke oven foundation top plate; the control elevation short tubes are welded on the pre-laid bar dowels; the longitudinal horizontal tubes are erected along a frame column longitudinal tower and are fixedly connected with the control elevation short tubes; the transverse horizontal tubes are fixedly erected on the longitudinal horizontal tubes; the longitudinal horizontal tubes and the transverse horizontal tubes form an overall scaffold grid net; the lower laid ejection tubes and the laid temperature testing tubes are fixedly mounted on the transverse horizontal tubes; the laid cleaning tubes are fixedly mounted between two adjacent transverse horizontal tubes. The coke oven top plate pipe laid assembled type fixing rack is convenient and rapid to assemble and fix, good in transfer usability, easy in disassembling fixed laid tubes and relatively convenient to control elevation, displacement and mounting process adjustment, and moreover as a fixing rack material can be transferred and recycled, the cost can be reduced.
Owner:MCC TIANGONG GROUP

A large bridge bearing grouting formwork

The invention relates to a large-scale bridge support grouting formwork frame which is characterized by mainly comprising four formworks. A grouting die cavity is formed by connecting the four formworks in an enclosing and fastening mode. A rotary bridge support supporting mechanism is arranged on the upper surfaces of at least on pair of opposite formworks. The rotary bridge support supporting mechanism is provided with a rotary limiting device and a lifting adjusting mechanism. The bridge support supporting mechanism is adjustably installed on an upper installation plate. Fine adjustment bottom feet are arranged at the four corners of the formwork frame. By the adoption of the technical scheme, in the actual construction process, support axis and plane elevation adjustment can be achieved at a time, bridge support grouting procedure construction is smoothly carried out, repeated adjustment operations and working procedure interference are avoided, and working efficiency is improved; in addition, the large-scale bridge support grouting formwork frame further has the advantages of being high in circulation performance, convenient to assemble and disassemble, firm, reliable, easy and convenient to operate, high in construction control precision and the like.
Owner:CHINA RAILWAY 15TH CONSTR BUREAU GRP +1

Post-cast strip pouring supporting system and post-cast strip pouring construction method

The invention provides a post-cast strip pouring supporting system and a post-cast strip pouring construction method, and belongs to the technical field of rail engineering. The post-cast strip pouring supporting system comprises a limiting side mold, an inserting plate and a supporting assembly. Technical effects are that: before the self-compacting concrete filling layer is poured, an insertingplate is arranged on the post-cast strip to block the previous self-compacting concrete filling layer, and the post-cast strip and the lower space of the next track plate form a communicating structure; when the post-cast strip is poured, pouring of the self-compacting concrete filling layer is synchronously achieved, pouring does not need to be conducted after the self-compacting concrete fillinglayer meets the strength requirement; the time difference between the post-cast strip and the next track plate is reduced, the construction efficiency is improved, and continuous line production canbe achieved; and meanwhile, the limiting side molds and the supporting assemblies are used for achieving position fixing and position adjusting of the inserting plates, the supporting assemblies can avoid steel bars between the adjacent track plates, the operability is high, the problem that a traditional end mold is difficult to take out is solved, the dismounting and mounting are easy and convenient, the turnover rate is high, and the construction difficulty is reduced.
Owner:中铁十七局集团第三工程有限公司

Temporary emergency road surface equipment

The invention relates to road surface equipment, and especially relates to a temporary emergency road surface equipment unite plate body and the road surface equipment. The temporary emergency road surface equipment unite plate body comprises a road surface plate basal body, wherein the road surface plate basal body comprises a frame which is formed by two crosswise side plates and two lengthwise side plates; at least one group of one-way or two-way cross black metal fillets are arranged in the frame, and a concrete layer is integrally poured in the frame; four turnings and four corners of the frame are fixedly provided with connecting plates with mounting holes, or the frame is provided with four extending ends; the four extending ends are provided with mounting holes, when one group of fillets are adopted, the one group of fillets are close to the lower surface of the frame, and when two or more groups of fillets are adopted, two groups of the two or more groups of fillets are close to the upper and lower surfaces of the frame respectively; and the road surface equipment comprises multiple road surface plate basal bodies which are transversely or longitudinally spliced and then fixedly connected. The plate body and the road surface equipment provided by the invention are recycled, the energy is saved, the construction cost is reduced, further the service life of a road surface plate is prolonged, the environmental secondary pollution problem of concrete waste is effectively solved, and the construction is simple, thereby being suitable for the rapid installation, and being beneficial to popularization implement.
Owner:张恒亮

A storage device for construction materials

The invention provides a material storing device for constructional engineering and belongs to the technical field of building construction. A supporting frame comprises at least four supporting bodies; each supporting body comprises a pedestal and an upright post; each upright post is provided with a plurality of sleeves; the upper part of each upright post is provided with an angle regulating device; each set of storing unit comprises a cross brace, a lifting ring and a universal wheel; the two ends of each cross brace horizontally extend toward the outer side to form horizontal rods; the end part of each horizontal rod is bent downwards to form a vertical rod; every two lifting rings are correspondingly arranged on the horizontal rods at the two ends of the corresponding cross brace; the universal wheels are arranged at the bottoms of the cross braces in a spaced manner; the vertical rods at the two ends of each storing unit are correspondingly inserted into the sleeves of the upright posts which are arranged oppositely; a shielding device comprises a controller, an alarming machine and two shielding plates; the top of each shielding plate is provided with a humidity sensor; oneshielding plate is connected with the angle regulating device on the upright post at one side; and the other shielding plate is connected with the angle regulating device on the upright post at the other side. The material storing device is reasonable in structure, realizes classified storage of building materials and lowers the engineering cost investment.
Owner:HENAN UNIV OF ECONOMICS & LAW

Elevator shaft anti-falling net structure and construction process thereof

The invention relates to an elevator shaft anti-falling net structure and a construction process thereof. The elevator shaft anti-falling net structure comprises an anti-falling net and connectors, wherein the four sides of the anti-falling net are provided with connecting rings; each connector comprises a connecting bolt and a casing pipe which are cooperatively connected; one end of each connecting bolt is provided with a connecting ring hanging groove; the other end of each connecting bolt is provided with an outer thread and connected with a nut. The casing pipes are inserted into originalformwork screw rod reserved holes of an elevator shaft, and the connecting rings are arranged on the connecting ring hanging grooves and are tightly matched and fixed by the casing pipes. By applyinga limiting structure and adopting the original formwork screw rod reserved holes of the elevator shaft as connecting points, the steps of pre-embedding reinforcing steel bars, inserting expansion bolts and the like are omitted, the casing pipes are pushed into the elevator shaft from the outside through the connecting bolts, the connecting rings on the anti-falling net are hung into the connecting ring hanging grooves, and then the connecting ring hanging grooves are sleeved with the casing pipes to ensure the structural stability. During construction, constructors do not need to enter the elevator shaft for construction, so that the effects are achieved that the construction process is simple and convenient, construction is safe, and the strength is reliable.
Owner:ZHEJIANG CONSTR INVESTMENT GRP CO LTD

Laminate structure with illumination function and mounting method thereof

The invention discloses a laminate structure with an illumination function and a mounting method thereof. The laminate structure comprises an upper side facing material, a composite plate steel framesupporting skeleton, fastening pieces, self-locking pins and independent illumination equipment; the bottom of a composite plate is preassembled with the independent illumination equipment; the fastening pieces are welded to the end surfaces of the two sides of the longitudinal end of the composite plate steel frame supporting skeleton respectively, and the end surfaces of the two sides are provided with the self-locking pins matched with the fastening pieces respectively; the self-locking pins and the fastening pieces commonly form a lock catch used for locking a vertical supporting ladder type parallel truss; and an access port of an independent illumination equipment power supply is preassembled between the two fastening pieces. For the laminate structure provided by the invention, by preassembling the illumination equipment at the bottom, various laminates at the later period adopt a light mould base pipe profile as a frame, is light in whole weight and liable to transport, can betimely repaired when damages are discovered and is good in revolving performance; meanwhile, by combining the supporting skeleton with ancillary facilities to form a one body, production modularization and mounting instrumentation of a house are realized.
Owner:中建集成科技有限公司

Attached climbing device and installation method of all-steel climbing frame at the retracted part of the structure

The invention relates to an attaching and climbing device of a full steel climbing frame in a structure retraction part and an installation method thereof, and particularly relates to the field of building construction. The attaching and climbing device comprises a steel vertical column, a bottom cantilever beam, attaching support seats and climbing hanging parts. The installation method of the device comprises the following parts of welding the steel vertical column at the end part of the bottom cantilever beam on a lower structure slab, welding a bottom diagonal brace between the bottom cantilever beam and the steel vertical column, welding an upper pull rod and an upper diagonal brace between the steel support column and a connecting embedding part in the structure slab at the retraction part, respectively fixing the attaching support seats at the upper and lower parts of the steel vertical column by screw rods, respectively fixing the climbing hanging parts at the upper and lower side edges of the steel vertical column by square connecting parts, correspondingly arranging a plurality of groups of steel vertical columns according to the number of guide rails of the full steel climbing frame, and welding and connecting the steel vertical columns into a whole by horizontal connecting rods and crossing connecting rods, so that the climbing construction of the full steel climbing frame is smoothly performed by the attaching and climbing device at the structure retraction part. The attaching and climbing device has the advantages that the construction is easy, the safety is good, the cost is low, the construction period is short, and the repeated use is realized.
Owner:THE SECOND CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU +3

Adjustable elevator shaft opening anti-falling platform

The invention discloses an adjustable elevator shaft opening anti-falling platform, the length of a plurality of square steel main keels is adjustable, one end of each square steel main keel is connected with an L-shaped embedded part, the L-shaped embedded parts are embedded before opening concrete pouring, and the other ends of the square steel main keels abut against a wall and are obliquely arranged; a plurality of secondary keel battens are connected to the square steel main keel in a clamped mode, a surface layer formwork is arranged on the top faces of the secondary keel battens, the square steel main keel and an L-shaped embedded part can be rotationally installed through a locking bolt, and after the square steel main keel and the L-shaped embedded part are rotationally installed in place, gaskets on the two sides are added for bolt connection. The ends, close to the wall, of the square steel main keels are wrapped and nested through end anti-skid rubber pads, end friction can be increased, damage to the wall can be reduced, the included angle between the whole anti-falling platform and a floor ranges from 5 degrees to 10 degrees, the ends of the square steel main keels make contact with the wall, an angle is formed, large friction force is generated, and the anti-falling effect is improved. Therefore, the friction force and the anchoring section are jointly stressed to maintain the stability of the whole anti-falling platform.
Owner:CHINA CONSTR 4TH ENG BUREAU 6TH

Construction tools for making fence topping

The present invention belongs to the field of construction, and concretely relates to a construction tool for manufacturing enclosing wall copings. The construction tool comprises an angle iron die and a fixture; the angle iron die comprises a first plate body which is perpendicular to an external wall of a wall body and arranged in a horizontal direction, and a second plate body which is away from the external wall of the wall body and disposed on the first plate body; a raised line for forming a larmier at a bottom face of an enclosing wall coping is arranged at an inner side of the angle iron die and on the plate face of the first plate body; the fixture comprises a first clamping arm and a second clamping arm which can be clamped onto the wall body in a thickness direction of the wall body; and a locking and fixing mechanism for fastening and fixing the angle iron die onto the external wall of the wall body is disposed on the first clamping arm and / or the second clamping arm. With adoption of the above fixture, the angle iron die can be effectively installed and positioned during pouring, integral forming of the larmier and the enclosing wall coping is realized, and the appearance of the enclosing wall coping is attractive. The construction tool is simple in structure, excellent in turnover performance and convenient to assemble and disassemble.
Owner:STATE GRID CORP OF CHINA +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products