Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

36results about How to "Easy laying work" patented technology

Two-dimensional code, RFID (radio frequency identification) and GPS (global positioning system) trinity based electrical product positioning system and positioning method thereof

The invention discloses a two-dimensional code, RFID (radio frequency identification) and GPS (global positioning system) trinity based electrical product positioning system and a positioning method thereof. The system is characterized by comprising a plurality of electrical products, handheld devices, servers and a positioning and monitoring platform; each electrical product is provided with a two-dimensional code card, an RFID tag and a GPS monitoring terminal; the handheld devices are used for reading the two-dimensional code cards and RFID tag information of the electrical products; the servers are loaded with information of the electrical products; the positioning and monitoring platform is used for displaying locations and distribution information of current operating electrical products in the background in real time; the GPS positioning terminals and the handheld devices are connected with the servers through wireless networks, and the servers are connected with the positioning and monitoring platform through the wireless networks or wired networks. The system has the advantages of completeness in function, high operability, convenience, rapidness, high efficiency and the like, and is applicable to links such as production and manufacture, circulation and sales, after-sales service or scrap recovery of the electrical products.
Owner:AUCMA

Soft soil roadbed geosynthetic material three-dimensional reinforcement treatment construction method

InactiveCN111764214ARelieve pressureEnhance the ability to resist restraint on the sideRoadwaysSoil scienceCrushed stone
The invention relates to a soft soil roadbed geosynthetic material three-dimensional reinforcement treatment construction method, which comprises the steps of 1, treating a lower bearing layer, and compacting and leveling the lower bearing layer; 2, laying geotextile, specifically, flatly laying the geotextile on the lower bearing layer, and partially overlapping the adjacent geotextile together;3, laying geogrids, specifically, laying the geogrids on the geotextile, enabling the widths of the two sides of each geogrid to be the same as the width of the roadbed, and partially overlapping theadjacent geogrids together; 4, laying a graded gravel cushion layer, laying gravel on the geogrids, and compacting the gravel layer; and 5, laying a gabion box, filling the gabion box with human headstone and a gravel cushion layer, laying the gabion box on the graded gravel cushion layer, and then feeding the human head stone and the graded gravel a to the gabion box in the mode that the human head stone is taken the main material and gaps are filled with the graded broken stone. The construction method has the effects of increasing the construction speed and reducing the construction cost to a certain extent.
Owner:湖南省交建工程集团有限公司

Degaussing cable trough, laying device for ship cable and cable laying method

The invention provides a degaussing cable trough, a laying device for a ship cable and a cable laying method and relates to the technical field of cable laying. The degaussing cable trough comprises a cable trough body, a cover board and a cable fastening hook for fixing the cable, wherein the section of the cable trough body is rectangular and an opening is formed in the top; the cover board covers the opening in the top of the cable trough body; the cable fastening hook is internally arranged in the cable trough body and comprises a U-shaped bracket and two opposite and parallel lifting rods; the U-shaped bracket is formed by two vertical bars and a bottom bar; two grooves are formed in the inner side of each lifting rod and are correspondingly limited in the outer ends of the two vertical bars; and the two lifting rods are connected through a fastener. The laying device for the ship cable is formed by connecting a plurality of degaussing cable troughs and two adjacent degaussing cable troughs are connected through one sleeve. The cable laying method is implemented by adopting the laying device for the ship cable. The cable laying work of a constructor can be greatly facilitated through laying the cable in each cable trough body, and a scratched injury to the cable is reduced.
Owner:宝应帆洋船舶电器配件制造有限公司

Wire arrangement-oriented circuit bridge with opening having self-locking function

The invention discloses a wire arrangement-oriented circuit bridge with an opening having a self-locking function. The circuit bridge comprises a lower main body frame, an upper main body frame, wiresand a through hole; the upper main body frame is arranged on the upper side of the lower main body frame; the wires are arranged in the upper main body frame and the lower main body frame; a lower pressing sheet is mounted on supporting rods; the lower side of the lower pressing sheet is connected with the upper main body frame; first threaded columns are arranged at the lower ends of the supporting rods; second nuts are installed at the lower ends of the first threaded columns; an outer flange is fixedly arranged at the outer end of a movable sealing plate and located on the outer side of asliding way; an inner flange is fixedly arranged at the inner end of the movable sealing plate; and a fixing hole is formed in the inner side of the inner flange. According to the wire arrangement-oriented circuit bridge with the opening having the self-locking function, the opening work of the circuit bridge can be facilitated, so that the laying work of the wires between the lower main body frame and the upper main body frame can be facilitated, therefore, the laying efficiency of the wires is improved, and the use efficiency of the circuit bridge is improved.
Owner:YANGZHOU YAGUANG CABLE

Walking type charging intelligent robot

The invention discloses a walking type charging intelligent robot. The walking type charging intelligent robot comprises a walking base main body, a frame main body, a camera, a generator, a current stabilizer and an inverter, the frame main body is welded and fixed to the top end of the walking base main body, the camera is fixed to the left side face of the frame main body through screws, and aplacement plate is connected into the frame main body in a clamped mode; a non-slip mat is arranged on the upper surface of the placement plate in an attached mode, fixing rods are fixed to the left end and the right end of the non-slip mat through screws, mounting grooves are connected to the outer sides of the fixing rods in a clamped mode, and the placement plate is fixed to the outer sides ofthe mounting grooves; and a transverse rod is connected to the interior of the bottom face of the walking base main body through a bearing, and walking wheels are in key connection with the outer sides of the front and rear ends of the transverse rod. According to the walking type charging intelligent robot, mechanical energy generated by the walking wheels is converted into electric energy through the generator on the basis of an original charging base and an original charging pile, so that the intelligent robot is directly charged during working.
Owner:朱佳敏

Municipal garden turf laying equipment and method

The invention discloses municipal garden turf laying equipment and method, and mainly relates to the field of turf laying devices. The municipal garden turf laying equipment comprises a movable frame body and a laying device arranged on the frame body, wherein the laying device comprises a turf laying assembly, a river sand laying assembly and a land leveling assembly; the river sand laying assembly is arranged between the turf laying assembly and the land leveling assembly; and the turf laying assembly, the river sand laying assembly and the land leveling assembly can be matched with one another. The municipal garden turf laying equipment and method provided by the invention have the beneficial effects that the turf laying task can be conveniently carried out on the ground needing turf laying, the soil preparation and sand laying steps needed by traditional turf laying are omitted, the turf laying task can be completed at a time through the device, and workers can conveniently carry out turf construction.
Owner:宋鹏

Steel bridge asphalt pavement shear fatigue detection equipment

The invention discloses steel bridge asphalt pavement shear fatigue detection equipment. The equipment comprises a device shell, a clamping plate, a heat dissipation frame, rolling wheels and supporting rods; and a worm is rotationally connected into the device shell, a first driving motor is fixedly welded to the heat dissipation frame, the output end of the first driving motor is connected witha transmission belt in a meshed mode, the output end of the first driving motor is connected with a cooling fan through a shaft, a storage box is connected into the heat dissipation frame through screws, a small water pump is connected to the storage box through a flange, and a cooling pipe is connected to the small water pump through bolts. The steel bridge asphalt pavement shear fatigue detection equipment is provided with the heat dissipation frame, under the action of the small water pump, cooling liquid in the storage box can be conveyed into a cooling pipe, air around a cooling fan can be rapidly cooled, an asphalt sample can be rapidly and effectively cooled and formed, and the use efficiency of the equipment is effectively improved.
Owner:安徽荣港建筑工程有限公司

Geological disaster monitoring, predicting and early warning equipment based on artificial intelligence and use method thereof

The invention relates to the technical field of geological disaster monitoring equipment, in particular to geological disaster monitoring, predicting and early warning equipment based on artificial intelligence and a using method thereof.The geological disaster monitoring, predicting and early warning equipment comprises a centralized pressurization monitoring structure, a first laying monitoring structure and a second laying monitoring structure; the other end of the centralized pressurization monitoring structure communicates with a second laying monitoring structure, the centralized pressurization monitoring structure comprises a connecting frame, a supporting plate frame, a limiting guide plate, a stable connecting frame, an arc-shaped guide frame and a communicating groove pipe, the lower end of the connecting frame is fixedly connected with the supporting plate frame, and the lower end of the supporting plate frame is fixedly connected with the limiting guide plate; the rear end of the limiting guide plate is fixedly connected with a communicating groove pipe, and the center position of the supporting plate frame is fixedly connected with the stable connecting frame and the arc-shaped guide frame. Through the arrangement of the centralized pressurization monitoring structure, the first laying monitoring structure and the second laying monitoring structure, geological disaster monitoring and early warning work is achieved.
Owner:SICHUAN UNIVERSITY OF SCIENCE AND ENGINEERING

Cable laying system with adjustable winding radius for electric power engineering

The invention discloses a cable laying system with adjustable winding radius for electric power engineering. The cable laying system comprises a first transverse plate and wheels, wherein a pluralityof wheels are fixedly connected to the lower part of the first transverse plate, and a collecting device is mounted above the first transverse plate. According to the cable laying system for electricpower engineering, the structures such as a vertical plate, a roller and a cable are matched with one another, the device can be moved to a place where the cable needs to be laid through the wheels, therefore, the labor force is saved, the structures of a first motor, a second bevel gear roller, the cable are matched with one another, the first motor can drive the second bevel gear to rotate, thesecond bevel gear drives a first bevel gear to rotate, the first bevel gear drives the roller to rotate, and therefore cable pay-off work can be conducted, through mutual cooperation of an arc-shapedtoothed plate, a first connecting rod, a second connecting rod, a lantern ring and other structures, the cable can be evenly wound, and cable laying work can be conveniently conducted.
Owner:张乙顺

Pipeline laying device for house drainage engineering

The invention discloses a pipeline laying device for house drainage engineering. The pipeline laying device comprises a working bottom plate, a pipeline box, base mechanisms, an upper working plate, aretracting mechanism, a pulley mechanism and a transmission mechanism. The pipeline box is fixedly mounted on one side of the upper surface of the working bottom plate through fixing bolts, a plurality of wall pipelines are mounted in the pipeline box, a sealing cover is fixedly mounted on the upper surface of the pipeline box through fixing bolts, the two base mechanisms are fixedly mounted on the other side of the upper surface of the working bottom plate, to-be-laid pipes are arranged on the upper surfaces of the base mechanisms, tail lantern rings sleeve the outer walls of the tail ends below the to-be-laid pipes, and top fixing rings sleeve the outer walls of the top ends of the to-be-laid pipes. The pipeline laying device for the house drainage engineering has the beneficial effectsthat when the pipeline laying device for the house drainage engineering is used, laying work of outdoor pipelines of a house can be extremely and conveniently completed; meanwhile, good fixing performance is achieved, the angle of the pipelines can be conveniently adjusted, and using performance is good; and the structure is simple, layout is reasonable, manufacturing and maintaining costs are low, and the pipeline laying device is suitable for manufacturing, popularization and use.
Owner:绍兴权电科技有限公司

Device and method for packaging quick-frozen fruits and vegetables

The invention discloses a device and method for packaging quick-frozen fruits and vegetables, and relates to the technical field of fresh food packaging. The device comprises a conveying belt, the conveying belt is provided with a plurality of charging buckets, and a suspension frame is arranged above the conveying belt; a bag placing mechanism, a feeding mechanism, a bouncing mechanism, a heat sealing mechanism and a discharging mechanism are sequentially arranged at the bottom of the suspension along a conveying line of the conveying belt, the bag placing mechanism comprises a first shell, a film barrel and a transmission wheel are symmetrically arranged in the first shell, a bag film is wound on the film barrel, and the end, away from the film barrel, of the bag film is fixedly connected with the transmission wheel. A first hydraulic cylinder is arranged over the bag film, the output end of the first hydraulic cylinder is fixedly connected with a push column, and a film outlet is fixedly formed in the bottom of the first shell. According to the fruit and vegetable bagging device, the shape of the bag film can be automatically controlled, the bag film is cylindrical, fruits and vegetables can be stably wrapped, the bagging stability is improved, manual operation is not needed, and the production efficiency is improved.
Owner:山东凯欣绿色食品股份有限公司

Mulching film laying device for crop heat preservation in agricultural production

InactiveCN112314296ASimple layingSave the work of manual pulling and fixingPlant protective coveringsAgricultural scienceAgricultural engineering
The invention discloses a mulching film laying device for crop heat preservation in agricultural production, and relates to the technical field of agricultural production. The mulching film laying device comprises a base and a supporting column, the supporting column is fixedly connected to the right end above the base, a mounting roller is rotatably connected to the upper end of the supporting column, a notch is formed in the left end of the base, and a locking mechanism is arranged on the base; and a cutting mechanism is arranged at the left side of the locking mechanism and fixedly connected to the base, mounting grooves are formed in the positions, at the front side and the rear side of the notch, of the base, limiting assemblies are arranged in the mounting grooves, and putting assemblies are arranged on the limiting assemblies. Compared with the prior art, the mulching film laying device has the beneficial effects that one end of a mulching film is clamped and fixed through the putting assemblies, so that the work that the laying starting end needs to be pulled and fixed manually is omitted; and after the mulching film is laid, the mulching film is cut off through the cuttingmechanism, and a sensor controls the locking mechanism to fix the mulching film, so that self shrinkage of the mulching film is avoided, next laying work is facilitated, and the practical use effectof the device is good.
Owner:姚磊

Electrical wire pipe laying process and auxiliary equipment

The invention discloses an electrical wire pipe laying process and auxiliary equipment, and belongs to the technical field of wire pipe laying. The electric wire pipe laying process and auxiliary equipment comprise a moving seat, wherein a motor A is fixedly arranged at the position, opposite to a wheel groove, of the left wall of a moving rod, a conveying belt is connected between a driving wheel and a driven wheel, a cavity is formed in the rear side of the top face of the moving seat, a power supply box is fixedly arranged at the right end of the front side of the cavity, two grooves are symmetrically formed in the upper ends of the inner walls of the two sides, an axis is arranged between the two grooves, two baffles are symmetrically and fixedly arranged on the front sides and the rear sides of the grooves, guide plates are fixedly arranged on the top faces of the baffles, a reel is arranged in the middle of the axis in a sleeving mode, a cable is wound around the middle of the reel, a pay-off assembly is arranged on the lower portion of the cavity, a fixing plate is fixedly arranged at the lower end of the rear wall of the moving seat, and a soil shifting plate is fixedly arranged in the middle of the bottom face of the fixing plate. According to the invention, the integrity of pipeline laying work is improved, ditching, paying-off and burying work can be conducted in sequence, the pipeline laying efficiency is improved, and practicability is high.
Owner:张勇明

Geotextile laying device for shoal land

The invention relates to the technical field of shoal land geotextile laying, in particular to a geotextile laying device for a shoal land. The device comprises a driving box and a laying frame, driving motors are fixed to the two ends of the interior of the driving box, first rotary shafts are fixed to output ends of the driving motors, moving wheels are fixed to the ends, away from the driving motors, of the first rotary shafts, sinking resisting blocks are uniformly inserted in the moving wheels in the circumferential directions, a dragging mechanism is fixed to the part between the drivingbox and the laying frame, rotary mechanisms are fixed to the tops of the two sides of the laying frame, a rotary shaft is connected with the part between the rotary mechanisms, a geotextile roll is fixed to the rotary shaft, the bottom of the laying frame is an arc-shaped structure, a first clamping groove is formed in the end, away from the driving box, of the bottom of the laying frame, and a fixing mechanism is clamped and fixed to the interior of the first clamping groove. By means of the laying device, the geotextile can be efficiently laid on the shoal land, the moving is convenient, the feeding is easy, and the operation is simple.
Owner:盐城市华志工程材料有限公司

Water conservancy project pipeline laying auxiliary device

The invention discloses a water conservancy project pipeline laying auxiliary device. The water conservancy project pipeline laying auxiliary device comprises a drainage channel, balance weight seats are arranged above the ground on the two sides of the drainage channel, the lower ends of the two balance weight seats are fixedly connected with four movable universal wheels distributed in a rectangular shape, the front ends and the rear ends of the opposite sides of the two balance weight seats are correspondingly and fixedly connected with connecting blocks, a fixing bolt is inserted into every two connecting blocks which are oppositely arranged in the left-right direction, fixing frames which are in a U shape in the overlook view are fixedly connected to the sides, close to the drainage channel, of the two balance weight seats and located among the four connecting blocks through bolts, and the two fixing frames are symmetrically arranged. The pipeline laying auxiliary device has the advantages that when a heavy pipeline is laid, the pipeline laying auxiliary device can be matched with a crane in an auxiliary mode to stably place the pipeline into the drainage channel, manual monitoring and adjustment in the drainage channel are not needed, safety of manual work is guaranteed, automatic and stable lowering work is achieved, and the pipeline laying speed is increased.
Owner:李垚

Assembly type floor facing integrated plate convenient for paving floor heating

The invention discloses an assembly type floor facing integrated plate convenient for paving floor heating. The plate comprises a floor plate body, protective frames and protective gummed paper; the protective frames are arranged at the four sides of the floor plate body; the protective gummed paper is connected with the upper side of the floor plate body in a glued mode; a heat insulation layer is arranged on the uppermost side face of the floor plate body; a pipe groove is integrally formed in the upper side face of the heat insulation layer; an aluminum foil heat insulation layer is arranged at the lower side of the heat insulation layer; and a leveling layer is arranged at the lower side of the aluminum foil heat insulation layer. According to the assembly type floor facing integratedplate convenient for paving floor heating, through the arrangement of the heat insulation layer, the aluminum foil heat insulation layer, the leveling layer and the protective gummed paper, when the assembly type floor plate is used, and a plurality of layers of heat insulation supporting devices do not need to be arranged on the floor plate during floor heating laying work, so that laying work issimplified, floor heating construction efficiency is improved; and through the arrangement of the protective frames, the outer side of the floor plate is protected through the protective frames whenthe plate is used, so that the floor plate is prevented from being collided and damaged in the hoisting and moving process.
Owner:GOLD MANTIS FINE DECORATION TECH SUZHOU CO LTD

Ecological drainage pavement

The invention discloses an ecological drainage pavement, and relates to the technical field of pavement construction. The ecological drainage pavement comprises a fine sand layer, the top of the fine sand layer is paved with a first stone layer, the top of the first stone layer is paved with a bottom filling layer, the top of the bottom filling layer is paved with an asphalt macadam layer, the top of the asphalt macadam layer is provided with a connecting plate, a limiting block is mounted at the top of the connecting plate. The top filling layer has certain viscosity, the bottom of the top filling layer can be reinforced through the connecting plate and the limiting block, the situation that the interior of the pavement cracks due to the pressure borne by the top of the pavement is avoided, finally through connection between a second stone layer with the small size and the asphalt layer, the pavement is smoothened; and the asphalt layer at the top is arc-shaped, so that water at the top of the pavement can be discharged to two sides, the situation of water accumulation is avoided, and the situation that the water is splashed to pedestrians in the vehicle driving process is avoided.
Owner:CHONGQING UNIV

Ccd-based image capture and contact identification acquisition device

The invention discloses a ccd-based image capture and contact identification acquisition device, which comprises a mounting assembly, a shell and a moving assembly, and is characterized in that a supporting frame is fixedly mounted at the bottom end in the shell. The supporting assembly is fixedly mounted at the top of the PC host, the PC host can be supported by a supporting frame, then a supporting plate is fixed by matching a through hole with a fastening bolt, and then a wire penetrates through a second wire conduit, so that a worker can perform laying work conveniently; then, a system timer, a single chip microcomputer and an image acquisition card are stored through a supporting plate, and then the time precision is controlled through the system timer; and the ccd-based image capture and contact identification acquisition device is high in precision, simple to operate, high in interpretation speed, high in automation degree, few in peripheral equipment and capable of sharing data in all links in time, personal error factors of traditional contact recognition are reduced, and the system has very important use value.
Owner:内蒙古科技大学包头师范学院

A simulation test device for visual monitoring of bulk ore and rock migration

The invention discloses a simulation test device for visual monitoring of bulk ore and rock migration, which includes a model box, a counterweight and an image recognition device; the model box includes a base and a box with an open top, and the box includes a first The side board, the second side board, the third side board and the fourth side board, the first side board is made of transparent material and the bottom of the first side board is provided with a ore outlet; the box is detachably provided with a partition, A preset interval is maintained between the partition plate and the first side plate; the counterweight is placed at the top opening of the box to exert a preset pressure on the ore particles filled in the box, simulating the discharge under different pressures. Mine test; image recognition equipment is arranged in front of the first side plate to monitor the migration and changes of ore particles during the ore drawing process. The invention can observe the displacement, velocity, stress, deformation and fracture of bulk ore particles in real time during the ore drawing process, thereby overcoming the shortcomings of the traditional ore drawing test device that cannot be observed in real time, visualized and continuously.
Owner:UNIV OF SCI & TECH BEIJING

Cement paving equipment for blind passage

The invention relates to a cement paving equipment, in particular to a cement paving equipment for a passage for the blind. The purpose of the present invention is to provide a cement paving equipment for the blind passage that can be recognized by the blind, assist the blind to walk, ensure the safety of the blind to a certain extent, reduce the risk of the blind traveling, and reduce the frequency of traffic accidents. The technical solution of the present invention is: a cement paving equipment for the blind passage, including a mounting plate, wheels, collecting frames, etc.; at least two wheels are connected to the outside of the mounting plate, and a collecting frame is slidably connected between the inner sides of the mounting plate, and the mounting plate Both sides of the top are provided with through holes, and a lifting mechanism is connected between a part of the mounting plate away from the wheel and the through holes. Through the cooperation of templates, rotating shafts, sliding sleeves, rotating rods and hand push rods, it can meet the cement laying of blind passages at different heights, and facilitate the staff to carry out cement laying work.
Owner:合肥蓝川生态科技有限公司

Blind passage cement paving equipment

The invention relates to cement paving equipment, in particular to blind passage cement paving equipment. The invention aims to provide the blind passage cement paving equipment which can be identified by the blind, assist the blind in walking, ensure the safety of the blind to a certain extent, reduce the travel danger of the blind and reduce the frequency of traffic accidents. According to the technical scheme, the blind passage cement paving equipment comprises mounting plates, wheels, a collecting frame and the like; wherein the wheels are at least connected to two sides outside the mounting plates, the collecting frame is slidably connected between inner sides of the mounting plates, through holes are formed in two sides of the tops of the mounting plates, and a lifting mechanism is connected between one parts, away from the wheels, of the mounting plates and the through holes. And through cooperation of a template, a rotating shaft, sliding sleeves, rotating rods and a hand pushrod, cement paving of blind passages of different heights is met, and workers can conveniently conduct cement paving work.
Owner:合肥蓝川生态科技有限公司

A kind of steel bridge asphalt pavement shear fatigue testing equipment

The invention discloses a steel bridge asphalt pavement shear fatigue testing equipment, which comprises a device casing, a clamping plate, a heat dissipation frame, a roller and a support rod. A worm is rotatably connected in the device casing, and the heat dissipation frame is welded and fixed. There is a first drive motor, and the output end of the first drive motor is engaged with a transmission belt, and the output end shaft of the first drive motor is connected with a cooling fan, the heat dissipation frame is screwed with a storage box, and the upper flange of the storage box is A small water pump is connected, and a cooling pipe is bolted to the small water pump. The steel bridge asphalt pavement shear fatigue testing equipment is provided with a heat dissipation frame. Under the action of a small water pump, the cooling liquid in the storage box can be transported to the cooling pipe, and the air around the cooling fan can be quickly cooled down. The asphalt sample is effectively cooled and formed, which effectively improves the use efficiency of the device.
Owner:安徽荣港建筑工程有限公司

Ring network cable laying device

The invention relates to a looped network cable laying device, and the device comprises a pay-off rack structure which comprises at least one coil holder assembly and at least one first guide assembly, and the first guide assembly is disposed at the output end of the coil holder assembly, and is used for guiding a cable outputted by the coil holder assembly; the pay-off arm structure comprises a pay-off assembly, a second guide assembly and a binding belt part, the binding belt part and the second guide assembly are arranged at the two ends of the pay-off assembly respectively, the second guide assembly can convey the cable to the binding belt part through the pay-off assembly, and the cable is bound by the binding belt part; and the cable conveying structure is arranged between the pay-off rack structure and the pay-off arm structure, and the cable conveying structure is used for conveying the cable in the first guide assembly into the second guide assembly. Mechanical construction of cable pay-off is achieved, working efficiency is improved, labor intensity of operators is reduced, and laying work of looped network cables is facilitated.
Owner:CHINA CREC RAILWAY ELECTRIFICATION BUREAU GRP

Water application method optical cable laying and construction method

A water-installing optical cable installation construction method for construction technique fields pushes the optical cable into a pipe by a mechanical optical cable thruster. Simultaneity, the press-added current which forms a drag force on the surface of the optical cable is inputted into the pipe through a water intake apparatus by using a water press. The press of the water acts on a steering seal structure connected with the optical cable head to form a forward force. The optical cable is under a floating state by the flotage of the water. The AC servo motor and the water press are controlled by a controllor to install the optical cable. The invention has the advantages of: low energy consumption, high speed of installation, applicability of the complicated pipe path, achievement of safe and long-distance optical cable installation, samll volume of the whole equipment and applicability of the field work.
Owner:SHANGHAI JIAOTONG UNIV

A manufacturing process of a rectangular cable

The invention discloses a manufacturing process of a rectangular cable, which comprises the following steps: a plurality of conductive wires are bunched into one strand by a bunching machine to form aconductive wire body; A plurality of conductive wires are stranded into a circular conductor through a pipe of a pipe strander; The circular conductor forms a rectangular conductor through a die press; A rectangular conductor coats an inner film layer on the outer surface of the rectangular conductor through an extruder to form a conductor body; The two conductor bodies are stacked, and the widerfaces of the two conductor bodies coincide with the wider faces of the two conductor bodies; A net-like shielding layer is woven on the external surface of the stacked conductor body by tin plating wire; Coating an outer film layer on the surface of the shielding layer; The rectangular cable is produced by the technology of bundle wire, stranded wire, stamping die, coating, stacking, weaving andcoating. The technology is simple and the efficiency is high.
Owner:GUANGDONG ZHONGDE CABLE

An auxiliary device for laying tiles indoors

The invention provides an auxiliary device for laying tiles indoors, comprising: a base, a sliding structure, a lifting structure, a bracket, a bracket, a cement tank, an extrusion structure, a propulsion structure, a smearing structure and a connecting pipe. The upper surface of the base is provided with A sliding structure that can move laterally, the end of the sliding structure is fixedly installed with a lifting structure that can move up and down, the upper surface of the base is located on both sides of the bracket and the brackets are fixed symmetrically, and the brackets are located above the lifting structure Sliding superimposed ceramic tiles, the upper part of the tiles is provided with a cement tank that can hold the cement slurry, and the inside of the cement tank near the tiles is provided with an extrusion structure that can squeeze out the cement slurry, which reduces the labor intensity of the workers , effectively increases the working space of the workers, facilitates the laying work of the workers, effectively avoids the phenomenon that the tiles are broken due to accidents, saves the cost of decoration to a certain extent, and makes the grout spread more evenly on the back of the tiles .
Owner:芜湖小白葱信息科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products