Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

34results about How to "Reduce error frequency" patented technology

Stalling synchronisation circuits in response to a late data signal

A data processing circuitry for processing data is disclosed. The data processing circuitry comprises: a plurality of synchronisation circuits for capturing and transmitting the data in response to a clock signal and a plurality of combinational circuits arranged between the synchronisation circuits for processing the data, the plurality of synchronisation circuits being arranged in at least two groups; an error detecting circuit for determining if the data input to one of the plurality of synchronisation circuits is stable during a predetermined time and for signalling an error if the data input is not stable, the predetermined time being less than a half cycle of the clock signal; control circuitry responsive to said error detecting circuit signalling said error to transmit a control signal to at least one of said groups of synchronisation circuits that contains a subsequent synchronisation circuit that said synchronisation circuit with said unstable input is configured to transmit said data to; each of said group of synchronisation circuits being configured to respond to receipt of said control signal to stall for a clock cycle and to transmit a stall signal to at least one further group of synchronisation circuits that said group of synchronisation circuits is configured to transmit data to or receive data from; each of said group of synchronisation circuits being configured to respond to receipt of said stall signal provided they have not stalled in a preceding clock cycle to stall for a clock cycle and to transmit a stall signal to said at least one further group of synchronisation circuits.
Owner:RGT UNIV OF MICHIGAN

A visual management method of equipment installation using a two-dimensional code

The invention provides a visual management method for equipment installation using a two-dimensional code, which comprises the following steps: a visual management module for equipment installation using a two-dimensional code is created; The pipeline to be modeled is disassembled in segments, and the two-dimensional code is subjected to an input production program; generating a two-dimensional code by printing a printer which prints a two-dimensional code of paper; reasonably dividing the area where the equipment is installed; The site management personnel and the construction and installation personnel can know the installation information of the equipment by scanning the corresponding two-dimensional code through the intelligent code scanning terminal. The invention are economical and reasonable, the installation space at subway stations and so on is small, In the electromechanical installation project with compact pipeline installation and complex installation process, time and labor are saved, and the installation information of the equipment is obtained by scanning the corresponding two-dimensional code through the intelligent code scanning terminal, which reduces the error frequency, greatly reduces the rework amount, effectively saves human resources, accelerates the construction progress, and improves the efficiency of equipment management.
Owner:INSTALLATION ENG CO LTD OF CCCC FIRST HARBOR ENG +1

Variable-length data transmission method in access control system

The invention discloses a data transmission method in an access control system. The data transmission method comprises the following steps of: sending a protocol data unit by using an access controller, wherein the protocol data unit consists of a synchronization header, a protocol information header, a data length information unit, a data unit and check bytes sequentially; verifying the synchronization header and the protocol information header by using a computer host; reading length data of the data unit after the synchronization header and the protocol information header are qualified in the validation; judging whether the length data of the data unit is equal to data in the data length information unit; receiving the data unit and the check bytes if the length data of the data unit is equal to the data in the data length information unit; performing CRC (cyclic redundancy check) to ensure the validity of received data; processing the data unit if the data is correct in the check;and otherwise, finishing the transmission. According to the data transmission method, various kinds of data can be flexibly transmitted, the electromagnetic anti-jamming capability can be improved, data is difficult to lose in the process of data transmission, the coupling of data synchronization is reduced, and the receiving of effective data is improved.
Owner:ELECTRIC POWER RES INST OF GUANGDONG POWER GRID

Stalling synchronisation circuits in response to a late data signal

A data processing circuitry for processing data is disclosed. The data processing circuitry comprises: a plurality of synchronization circuits for capturing and transmitting the data in response to a clock signal and a plurality of combinational circuits arranged between the synchronization circuits for processing the data, the plurality of synchronization circuits being arranged in at least two groups; an error detecting circuit for determining if the data input to one of the plurality of synchronization circuits is stable during a predetermined time and for signalling an error if the data input is unstable, the predetermined time being less than a half cycle of the clock signal; control circuitry responsive to said error detecting circuit signalling said error to transmit a control signal to at least one of said groups of synchronization circuits that contains a subsequent synchronization circuit that said synchronization circuit with said unstable input is configured to transmit said data to; each of said group of synchronization circuits being configured to respond to receipt of said control signal to stall for a clock cycle and to transmit a stall signal to at least one further group of synchronization circuits that said group of synchronization circuits is configured to transmit data to or receive data from; each of said group of synchronization circuits being configured to respond to receipt of said stall signal provided they have not stalled in a preceding clock cycle to stall for a clock cycle and to transmit a stall signal to said at least one further group of synchronization circuits.
Owner:RGT UNIV OF MICHIGAN

A multi-station unified verification and acceptance method for power system monitoring signals

The present invention discloses an electric power system monitoring signal multi-station uniform checking and accepting method. The method comprises the steps of reading a checking and accepting card, constructing a temporary database to receive the point table information uploaded by a regulation and control system, analyzing and comparing the information of the checking and accepting card and the point table information, determining whether the information of the checking and accepting card and the point table information are consistent, if the information of the checking and accepting card and the point table information are inconsistent, modifying the point table information of the regulation and control system, reanalyzing, otherwise taking the information of the checking and accepting card as the standard checking and accepting information to import to the regulation and control system; receiving the standard checking and accepting information, determining a to-be-checked and accepted station, real-timely reading the standard checking and accepting information, determining a to-be-checked and accepted measurement point, circularly receiving the alarm direct transmission signals reported by the measurement point, comparing the reported signals and the standard checking and accepting information, determining whether the format and the sequence match, if the format and the sequence match, checking and accepting the measurement point, otherwise, prompting the errors. According to the present invention, the information of a power substation can be checked and accepted automatically.
Owner:STATE GRID SHANDONG ELECTRIC POWER +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products