Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

33results about How to "Reduce outages" patented technology

Short message platform optimization system and method of distribution network first-aid repair command platform

The invention discloses a short message platform optimization system and method of a distribution network first-aid repair command platform. The short message platform optimization system comprises a distribution network first-aid repair command platform. The distribution network first-aid repair command platform obtains user information from an electric power marketing service application system, obtains data from a power utilization information collection system, obtains distribution network fault information from a distribution automation system, collects user repair reporting information from a 95598 system, and obtains geographical coordinate information from a power grid GIS system. All the obtained information is stored in a fault information list. Fields are extracted from the fault information list to generate a short message template database. When a real fault work sheet is received, an address fuzzy query means is adopted in the short message template database to extract corresponding contents, and a first-aid repair work sheet short message is generated. The distribution network first-aid repair command platform sends the first-aid repair work sheet short message to a mobile terminal of a first-aid repair team, and provides a first-aid repair result of the first-aid repair team to a mobile terminal of a user as feedback in real time.
Owner:STATE GRID CORP OF CHINA +2

Method and system for quickly identifying power utilization abnormal behaviors

The invention provides a method and system for quickly identifying power consumption abnormal behaviors. The system comprises the following modules: a power consumption difference trend analysis module which calculates power consumption difference trends based on a power consumption information big data analysis method, compares the similarity of the power consumption difference trends between different users and different periods, and deduces the probability of power consumption anomaly; a power utilization curve similarity analysis module which is used for establishing a power consumption quantity curve and a line loss curve of lines, users and transformer areas, calculating the form similarity of the power consumption quantity curve and the line loss curve, and calculating the similarity of various curves by using a shortest distance method; and a transformer area user information anomaly analysis module which is used for analyzing a transformer area power supply quantity, a power selling quantity and transformer area line loss by utilizing a big data technology, and calculating the probability of transformer area user information anomaly on the basis of parameters such as the transformer area maximum power supply radius and the transformer area linear distance. With the method and system adopted, the quick recognition of the abnormal power consumption behaviors can be realized, the abnormal probability of the user information in the transformer areas can be calculated, and the troubleshooting workload is reduced as much as possible, and a power failure range can be narrowed as much as possible.
Owner:EAST INNER MONGOLIA ELECTRIC POWER COMPANY +1

Active power scheduling method for power distribution network-level optical storage cluster and power distribution network measurement and control device

ActiveCN107994618AReduce light rejection rateBreak down barriers to integrated schedulingClimate change adaptationSingle network parallel feeding arrangementsLoad forecastingPower grid
The invention discloses an active power scheduling method for a power distribution network-level optical storage cluster. The optical storage cluster includes two or more of a group consisting of a photovoltaic power station, an energy storage device, a household optical storage device and a household uncontrollable photovoltaic device. The method includes the step of scheduling active power of each device in the optical storage cluster through an active power scheduling value delivered by a power distribution network. Moreover, the invention also discloses a power distribution network monitoring and control device adopting the method. According to the active power scheduling method for the power distribution network-level optical storage cluster, direct scheduling control is performed ondistributed devices such as photovoltaic and energy storage devices, the barrier of integrated dispatching of a photovoltaic power plant and an energy storage device in a traditional dispatching modeis broke through, and the load forecasting link is processed by a power grid scheduling center, so that the scheduling operation of the active power is more accurate and more reliable.
Owner:BEIJING JIAOTONG UNIV

Lightning arrestor mounting base

The invention provides a lightning arrester mounting base. The lightning arrester mounting base is characterized in that the lightning arrester mounting base comprises an upper installation plug, a lower installation plug, and upper and lower plug sockets for a lightning arrester; when the lightning arrester is installed on the lightning arrester mounting base, the upper installation plug is inserted into the upper plug socket and the lower installation plug is inserted into the lower plug socket; an upper end and a lower end of the lightning arrester are connected respectively to an upper copper bar and a lower copper bar through screws, wherein the upper copper bar is provided with a operating hole; the upper plug socket comprises an upper plug base, a locking spring and a clamping spring; and the lower plug socket comprises a spring compression plate, a spring buckling plate and a socket sleeve and is connected fixedly to an angle iron on the mounting base thereby forming a ground connection, wherein one end of the socket sleeve, one end of the spring compression plate and one end of the spring buckling plate are built up into a stack. An insulating bar is utilized in an assembly process and a disassembly process of the lightning arrester, thus the assembly process and the disassembly process of the lightning arrester have the characteristics of continuous power supply, no need of ascent, low labor intensity, high work efficiency and favorable power supply reliability. The lightning arrester mounting base has the advantages of concise structure, good workability, low cost and vast market prospect.
Owner:陈家斌 +2

Real-time comprehensive fault rate calculation method and system for power distribution equipment

The invention discloses a real-time comprehensive fault rate calculation method and system for power distribution equipment, and the method comprises the steps: carrying out the statistics of fault factors of power distribution equipment in a to-be-evaluated region, and dividing the fault factors into two types: gradient fault factors and sudden fault factors according to the intensity of the impact on the fault rate of the power distribution equipment from the fault factors; calculating the fault rate lambda'of the power distribution equipment under the influence of the gradient fault factoraccording to the online monitored operation and maintenance data of the power distribution equipment to be evaluated and the synergistic effect between different gradient fault factors; calculating the sudden potential fault rate lambda ''of the power distribution equipment according to the real-time intensity, the equipment level and the grid structure level of the sudden fault factor of the environment where the to-be-evaluated power distribution equipment is located; and calculating the real-time comprehensive fault rate lambda re = lambda '+ lambda' 'of the to-be-evaluated power distribution equipment. According to the method, the influence of equipment operation risks, the intensity of sudden fault factors and equipment and grid structure levels on the potential fault rate is considered, and the real fault rate of the equipment can be reflected more accurately.
Owner:CHONGQING UNIV

Manipulator device for workpiece moving and using method

The invention provides a manipulator device for workpiece moving and a using method, and belongs to the field of manipulators. The manipulator device comprises a driving mechanism and an emergency stop switch arranged on one side of the driving mechanism, a connecting mechanism is arranged on the driving mechanism, a protection box is arranged on one side of the connecting mechanism, a plurality of suction cup mechanisms are arranged on the protection box, and an adjusting trigger mechanism is arranged in the protection box. Third springs are arranged in the suction cup mechanisms, the third springs can support supporting pipes and rubber suction cups through check rings, so that the rubber suction cups in the multiple suction cup mechanisms are located on the same plane, and when the suction cup mechanisms make contact with a workpiece with the uneven top, the protection box continues to be driven by the driving mechanism to move downwards, at the moment, the heights of the bottom ends of the multiple suction cup mechanisms can change along with the actual situation of the top of the workpiece, so that part of the suction cup mechanisms can make contact with the concave position of the workpiece, the number of the suction cup mechanisms making contact with the workpiece can be increased, and then the workpiece adsorption strength is improved.
Owner:湖南力云智能科技有限公司

Feeder maximum load estimation method for distribution transformers

The invention discloses a method for predicating the maximum load of feeder lines of a distribution transformer, relates to the technical field of electric power, and aims to solve the technical problem that the future maximum load value of the distribution transformer cannot be accurately predicted. The method includes the steps as follows: firstly, historical load values of each feeder line in the year before a predicting day are acquired; then, an average load value of each feeder line at each sampling time of a sampling day is calculated on the basis of the historical load values; the maximum demand of daily declaration electricity is predicted on the basis of the calculated average load value and the historical maximum demand of daily declaration electricity, and the maximum prediction load value of the distribution transformer at each predicting time in the predicting day is calculated; the maximum value is chosen from the maximum prediction load values at each predicting time in the predicting day and taken as the maximum prediction load value of the distribution transformer in the predicting day; and the predicting time corresponding to the maximum prediction load value of the distribution transformer in the predicting day is taken as a time interval with the maximum load value of the distribution transformer in the predicting day. With the adoption of the method provided by the invention, investment waste of the volume of the feeder lines of the distribution transformer can be effectively avoided.
Owner:SUZHOU CHINT ENTERPRISE DEV

Overheating protection device for switch cabinet

The invention relates to the technical field of switch cabinets, in particular to an overheating protection device for a switch cabinet. The conventional switch cabinet has the disadvantages that theoverheat protection is insufficient when the cabinet is used, and that the temperature change state of the internal components cannot be effectively analyzed during the using. The invention provides the following technical scheme: the device comprises a switch cabinet body; an electrical appliance mounting plate arranged in the vertical direction is mounted inside the switch cabinet body; one sideof the electrical appliance mounting plate is provided with U-shaped supports, which are arranged equidistantly in the vertical direction; and division plates are vertically mounted between the adjacent supports. According to the overheating protection device for the switch cabinet, the device is simple in structure, convenient and fast to operate. On the one hand, the device can effectively monitor the temperature change of the electrical appliances in the switch cabinet during the operation, thereby providing a data basis for the performance analysis of the switch cabinet, and providing a theoretical basis for the subsequent upgrade and the improvement of the switch cabinet. On the other hand, the device can effectively and quickly reduce the temperature of the electrical appliances inside the switch cabinet and the occurrences of the power failure of the switch cabinet, thereby reducing the loss caused by the power failure.
Owner:襄阳赛克斯电气股份有限公司

Active power scheduling method and distribution network measurement and control equipment for distribution network-level optical storage cluster

The invention discloses an active power scheduling method for a power distribution network-level optical storage cluster. The optical storage cluster includes two or more of a group consisting of a photovoltaic power station, an energy storage device, a household optical storage device and a household uncontrollable photovoltaic device. The method includes the step of scheduling active power of each device in the optical storage cluster through an active power scheduling value delivered by a power distribution network. Moreover, the invention also discloses a power distribution network monitoring and control device adopting the method. According to the active power scheduling method for the power distribution network-level optical storage cluster, direct scheduling control is performed ondistributed devices such as photovoltaic and energy storage devices, the barrier of integrated dispatching of a photovoltaic power plant and an energy storage device in a traditional dispatching modeis broke through, and the load forecasting link is processed by a power grid scheduling center, so that the scheduling operation of the active power is more accurate and more reliable.
Owner:BEIJING JIAOTONG UNIV

A real-type test system and application method for distribution cables based on multi-dimensional digital fault inversion

The invention discloses a real-type test system and application method of distribution cables based on multi-dimensional digital fault inversion. The system includes: a distribution cable channel simulation system for simulating the real distribution cable laying mode, operating environment and faults conditions, to reproduce the working conditions of distribution cables under actual operating conditions; the distribution cable test control system is used to carry out true-type tests of various distribution cables according to the simulated environment of the distribution cable channel simulation system, under different experimental conditions Carry out the verification of distribution cable fault detection and diagnosis technology. The present invention proposes a real-type test system for distribution cables based on multi-dimensional digital fault inversion; by simulating and reproducing the cable running state under abnormal working conditions in the real-type cable test system, the power distribution system under various complex conditions is developed. Cable fault conditions and operational performance tests can comprehensively evaluate the effectiveness and accuracy of distribution cable fault detection methods.
Owner:ELECTRIC POWER RES INST OF STATE GRID ZHEJIANG ELECTRIC POWER COMAPNY +1

A kind of overheat protection device for switchgear

The invention relates to the technical field of switch cabinets, in particular to an overheating protection device for a switch cabinet. The conventional switch cabinet has the disadvantages that theoverheat protection is insufficient when the cabinet is used, and that the temperature change state of the internal components cannot be effectively analyzed during the using. The invention provides the following technical scheme: the device comprises a switch cabinet body; an electrical appliance mounting plate arranged in the vertical direction is mounted inside the switch cabinet body; one sideof the electrical appliance mounting plate is provided with U-shaped supports, which are arranged equidistantly in the vertical direction; and division plates are vertically mounted between the adjacent supports. According to the overheating protection device for the switch cabinet, the device is simple in structure, convenient and fast to operate. On the one hand, the device can effectively monitor the temperature change of the electrical appliances in the switch cabinet during the operation, thereby providing a data basis for the performance analysis of the switch cabinet, and providing a theoretical basis for the subsequent upgrade and the improvement of the switch cabinet. On the other hand, the device can effectively and quickly reduce the temperature of the electrical appliances inside the switch cabinet and the occurrences of the power failure of the switch cabinet, thereby reducing the loss caused by the power failure.
Owner:襄阳赛克斯电气股份有限公司

Control method based on outdoor power supply control system

The invention discloses a control method based on an outdoor power supply control system. The control method comprises an electric appliance charging method, a personal power supply management method and an outdoor power supply charging management method. According to the electric appliance charging method, the outdoor power supply can automatically cut off the electric appliance after the electric appliance is fully charged, and the charging safety of the electric appliance is ensured. According to the personal power supply management method, the use condition of the outdoor power supply and the residual electric quantity condition of the outdoor power supply can be tracked in real time, and the residual electric quantity of the outdoor power supply is reasonably distributed and used in time. According to the outdoor power supply charging management method, the specific time for charging the outdoor power supply during the travel of the user can be formulated in advance, and the situation of power failure is reduced. A control system based on an outdoor power supply comprises a single-chip microcomputer, the single-chip microcomputer is connected with an automatic power-off module, a power supply management module, a storage module, a display screen, an input module and a data transmission module, and the data transmission module is connected with a mobile terminal in a wireless communication mode.
Owner:SHENZHEN BETTERPOWER BATTERY +1

Oil product secondary logistics distribution optimization method and system based on variable neighborhood search algorithm

PendingCN113762886AImprove secondary logistics scheduling capabilitiesThe delivery plan is reasonableForecastingResourcesTime informationEnergy supply
The invention discloses an oil product secondary logistics distribution optimization method and system based on a variable neighborhood search algorithm. The method comprises the following steps: S1, obtaining distance information between an oil depot and each energy supply station, and driving time information required for transportation of distribution vehicles between the oil depot and each energy supply station; S2, acquiring oil depot information including the number of the distribution vehicles equipped in the oil depot, unit distance transportation cost, cabin capacity of each distribution vehicle and a transportation time window, and energy supply station information including unit time punishment cost of each energy supply station, oil product unit revenue, the demand quantity of each oil product order and delivery time of each oil product order; S3, establishing a distribution revenue maximizing model considering constraints of the transportation time window and the delivery time of the oil product orders; and S4, according to the distance information, the time information, the oil depot information and the energy supply station information, based on a variable neighborhood search algorithm, solving the distribution revenue maximizing model to obtain an optimal distribution scheme. The invention has the advantages that the constraints of the transportation time window and the delivery time are considered, and the distribution scheme is more reasonable.
Owner:浙江浙石油综合能源销售有限公司

A kind of manipulator device and using method for workpiece transfer

The application provides a manipulator device for workpiece transfer and a method of use, belonging to the field of manipulators, including a driving mechanism and an emergency stop switch arranged on one side of the driving mechanism, the driving mechanism is provided with a connecting mechanism, and one side of the connecting mechanism is provided with a The protective box is provided with a plurality of suction cup mechanisms, and the inside of the protective box is provided with an adjustment trigger mechanism. In the present application, the third spring in the suction cup mechanism is provided, and the third spring can support the support tube and the rubber suction cup through the retaining ring, so that the rubber suction cups in the multiple suction cup mechanisms are on the same plane. When the workpiece is in contact, the protective box continues to move down under the drive of the drive mechanism. At this time, the heights of the bottom ends of the multiple suction cup mechanisms will change with the actual situation on the top of the workpiece, so that some of the suction cup mechanisms can be in contact with the recesses of the workpiece. The number of contacts between the suction cup mechanism and the workpiece is increased, thereby improving the adsorption strength of the workpiece.
Owner:湖南力云智能科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products