Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

36results about How to "Reduce compressive load" patented technology

Highly compressed filter tow bales and process for their production

Disclosed is a packed, highly compressed cuboid-shaped filter tow bale, the top side and bottom side of which are free from noisome curvatures or constructions. The bale is characterized by the fact that (a) the bale has a packing density of at least 300 kg/m3, (b) the bale is entirely wrapped in an elastic packaging material which is provided with one or several convectively airtight connections, and (c) the upper side and lower side of the bale are substantially planar such that a flat plate which fully covers the bale can be pressed onto the upper side of the bale via a centrally effective normal force of 100 N and at least 90 percent of the surface of the upper side of the bale, which lies within the largest rectangle that can be inscribed by vertically projecting the bale onto the pressed plate, has a maximum distance of about 40 mm from the flat plate when the unopened bale is placed on a horizontal plane. A particularly suitable method for producing said bale comprises the following steps: (a) filter tow is supplied in a compressed form; (b) the compressed filter tow is enveloped in a wrapping; (c) the wrapping is closed in an airtight manner; and (d) the wrapped bale is relieved of the load. The wrapping of such a bale is largely prevented from bursting as a result of the prevailing internal pressure. The inventive bale has an ideal cuboid shape such that curvatures negatively affecting the bale during transport, or constructions hampering the behavior of the filter tow, are largely prevented from occurring.
Owner:RHODIA ACETOW AG

System for integrating mid-range and high-frequency acoustic sources in multi-way loudspeakers

InactiveUS7134523B2Improve acoustic power outputReduce spacingMetal casingsCabinetsIntegratorSound energy
This invention provides a radiation boundary integrator (“RBI”) for integrating sound radiation from mid-range and high-frequency sources in multi-way loudspeakers. The RBI is a substantially solid boundary that is placed over the mid-range speakers to provide smooth, wave-guiding side walls to control the angular radiation of the high-frequency sound waves emanating from the high-frequency sound sources. To allow the mid-range frequency sound waves generated from mid-range sound sources to pass through the RBI, the RBI is designed with openings. To further prevent the possibility of having high-frequency sound radiate through the openings in the RBI, the RBI may be designed with porous material in the openings of the RBI. The porous material would be transparent to the mid-range sound radiation, but would prevent the high-frequency sound radiation from being disturbed by the openings in the RBI. As such, the RBI provides an outer or front surface area that forms an acoustical barrier to high frequencies radiating across the front surface, yet is acoustically transparent to mid-range frequencies radiating through openings in the RBI. The RBI may also serve as a volume displacement device to compression-load the mid-range sound sources by contouring the back side of the RBI to the shape of the mid-range sound sources thus reducing the space between the RBI and the mid-range sound sources and loading the mid-range sound sources to generate greater mid-range sound energy.
Owner:HARMAN INT IND INC

Storm-resistant double-body deck equipment transport ship

PendingCN113022778AImprove the force rotation performanceImprove parking positioning performanceWatercraft hull designVessel safetyMarine engineeringPower apparatus
The invention discloses a storm-resistant double-deck equipment transport ship which comprises a fixing device, a power device, an advection device, a forecastle deck and a bridge building, a single-side tail building is arranged on one side of the fixing device, the power device is fixedly connected with the fixing device, the advection device is fixedly connected with the fixing device, and the forecastle deck is arranged on the upper side of the fixing device. The bottom end of the forecastle deck is connected with the upper side of the fixing device in a fastening mode, a bridge is arranged at the upper end of the forecastle deck, one side of the bridge is connected with one side of the forecastle deck in a fastening mode, the fixing device comprises sheet body assemblies, a connecting bridge and a main deck, the sheet body assemblies are arranged on the two sides of the connecting bridge respectively, and each sheet body assembly comprises a sheet body. The bottom side of the main deck is fixedly connected with the sheet body and the upper side of the connecting bridge, the upper side of the main deck is fixedly connected with the lower side of the forecastle deck, one side of the single-side tail building is movably connected with one side of the main deck, and the two ends of the connecting bridge are fixedly connected with one side of the sheet body.
Owner:上海爱船船舶科技有限公司

Method for rapidly hardening, pelletizing and filling tailings of abandoned open pit

The invention provides a method for rapidly hardening, pelletizing and filling tailings of a waste open pit. Comprising the following steps: S1, settling and thickening all tailings; s2, underflow deep dehydration; s3, carrying out rapid hardening, cementing and pelletizing; s4, solidifying and stacking the pellets; s5, transporting and stacking in an open pit; s6, soil dressing covering and ecological restoration. The method comprises the following steps: deeply dehydrating all tailings, adding a gelling agent and an accelerator, forming tailings pellets with a certain size by adopting a pelletizer, and transporting the tailings pellets to an open pit for mechanical stacking and discharging after rapid coagulation. A large number of pores among tailings pellets realize the light weight of a stacking body, and the pressing load on an open pit isolation ore pillar is reduced; a secondary reconstructed water source conservation body is formed, the surrounding hydrological environment of the open pit is not damaged, and ecological restoration of the open pit is facilitated; no bleeding exists in an open pit, the device is not affected by rainwater soaking when encountering rainfall, accumulated water can be rapidly filtered and discharged, and the key problems that the concentration of slurry conveyed by a tailing cemented filling pipeline in the open pit is low, bleeding is much, the strength is ineffective due to rainfall influence, and drainage is difficult can be effectively solved.
Owner:CENT SOUTH UNIV +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products