The invention discloses a
storm-resistant double-
deck equipment transport ship which comprises a fixing device, a power device, an
advection device, a
forecastle deck and a bridge building, a single-side
tail building is arranged on one side of the fixing device, the power device is fixedly connected with the fixing device, the
advection device is fixedly connected with the fixing device, and the
forecastle deck is arranged on the upper side of the fixing device. The bottom end of the
forecastle deck is connected with the upper side of the fixing device in a fastening mode, a bridge is arranged at the upper end of the forecastle deck, one side of the bridge is connected with one side of the forecastle deck in a fastening mode, the fixing device comprises sheet body assemblies, a connecting bridge and a main deck, the sheet body assemblies are arranged on the two sides of the connecting bridge respectively, and each sheet body
assembly comprises a sheet body. The bottom side of the main deck is fixedly connected with the sheet body and the upper side of the connecting bridge, the upper side of the main deck is fixedly connected with the lower side of the forecastle deck, one side of the single-side
tail building is movably connected with one side of the main deck, and the two ends of the connecting bridge are fixedly connected with one side of the sheet body.