Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

42 results about "Method engineering" patented technology

Method engineering in the "field of information systems is the discipline to construct new methods from existing methods". It focuses on "the design, construction and evaluation of methods, techniques and support tools for information systems development".

GIS (Geographic Information System) fault diagnosis system and method based on vibration signal spectrum analysis

The invention discloses a GIS (Geographic Information System) fault diagnosis system and method based on vibration signal spectrum analysis, belonging to the field of GIS fault monitoring. The system comprises a vibration acceleration sensor, a charge amplifier, a data acquisition instrument and a PC (Personal Computer) all of which are successively connected together in series, wherein the vibration acceleration sensor comprises three vibration sensors which are fixed on the outer surface of a GIS box in the X-axis, Y-axis and Z-axis directions, respectively. The diagnosis method of the system comprises the following steps of: acquiring GIS vibration signals in the X-axis, Y-axis and Z-axis directions by means of the three vibration sensors; performing wavelet de-noising on the vibration signals intercepted by a full period and then performing spectrum analysis; calculating energy at 50 Hz and the sum of energy at 100 Hz, energy at 200 Hz and energy at 300 Hz respectively; comparing the calculated values with the normal state; and determining the GIS fault according to the result of comparison in combination with a threshold. The method is easy in engineering realization, obvious in feature and capable of effectively diagnosing the GIS fault.
Owner:JIANGSU ELECTRIC POWER CO +2

Light and convenient electromagnetic high-energy dynamic compaction device and method and application

The invention discloses a light and convenient electromagnetic high-energy dynamic compaction device and method and an application. In the light and convenient electromagnetic high-energy dynamic compaction device, an electromagnet assembly is arranged above an outer sleeve, an impact rod is arranged in the outer sleeve, an impact hammer assembly is arranged under the outer sleeve, multiple levels of electromagnetic accelerating coils are arranged on the inner lateral wall of the outer sleeve and respectively connected with circuit control systems externally, and a hook ring is arranged at the top of the impact rod. By means of the method, the impact rod is accelerated through the electromagnetic effect of the multiple levels of electromagnetic accelerating coils during the process that the impact rod falls down to strike the impact hammer, and accordingly the impact energy and speed can be improved. The device is applied to foundation reinforcing in civil engineering, the total weight of the device is less than 1/10 of the weight of a traditional dynamic compaction device with the same compaction energy, the occupied space is greatly reduced, the problem of heavy construction devices, difficult transportation, limited construction speed, high cost, high energy consumption, limited device using space and the like of construction devices in dynamic consolidation method engineering application can be well solved or improved, and the efficient, environment-friendly, safe and wide application can be promoted.
Owner:GUANGDONG UNIV OF TECH

Probability technology based thermal protection system design method

The invention discloses a probability technology based thermal protection system design method. The probability technology based thermal protection system design method comprises the steps of firstly building a parameterized model of a thermal protection system in consideration of random distribution of thermal random variables; then generating various random input samples by utilizing an efficient sampling technology; then carrying out transient thermal analysis on samples in probability analysis and regarding a temperature characteristic quantity at one position and at one moment of the thermal protection system in a flying process as an output variable; then building a polynomial response surface model on the basis of a small amount of existing samples; and finally, carrying out Monte Carlo direct sampling on the response surface model to obtain probability distribution of the temperature characteristic quantity of the thermal protection system. According to the probability technology based thermal protection system design method, probability design of the thermal protection system is realized, a system reliability index and input random variable sensitivity are obtained, and a direction for scheme design and optimization of the thermal protection system is provided. In addition, the calculation efficiency is greatly improved through combination of the efficient sampling technology and a numerical integration algorithm; and the method engineering provided by the invention is available.
Owner:CHINA ACAD OF LAUNCH VEHICLE TECH

Underground coal mine stress field principal stress direction predicting method

The invention relates to an underground coal mine stress field principal stress direction predicting method. The method is mainly characterized by including the steps that a regional stress field type is preliminarily predicted according to the regional structure evolution history and the modern structure movement characteristics; crossed tunnels with the basically same supporting type in the same stratum are selected for further judging and observing the regional stress field type; the maximum horizontal principal stress direction of the stress field at an observation site is judged according to the underground stress trace geometrical characteristics; through the combination of the stress field type and the maximum horizontal principal stress direction, the maximum principal stress direction, the intermediate principal stress direction and the minimum principal stress direction of the stress field are judged. By means of the method, the problems that an existing coal mine stress field testing method is high in engineering cost and complicated in process are solved; by means of the relations of tunnel deformation, stress trace characteristics, stress field type and principal stress direction, the economical, practical and effective underground coal mine stress field principal stress direction predicting method is put forward.
Owner:HENAN POLYTECHNIC UNIV

In-orbit fuel consumption balancing method of formation satellite system

The invention relates to an in-orbit fuel consumption balancing method of a formation satellite system. The method comprises the following steps that 1) after kth formation control, the fuel consumption Ek of the formation control is calculated; 2) after the kth formation control, a formation control parameter [delta]lk of two satellite orbit periods is determined; 3) the sum SEk of cumulative fuel consumption of formation control and a residual error [delta]lk of present formation control are substituted into a formula SEk>=k1&&[delta]lk>=k2 for determination; and 4) if the formula is valid, marks of main and auxiliary satellites are switched autonomous on the satellites, main and auxiliary satellite switching control is carried out via a ground annotation instruction or on satellites autonomously so that a new main satellite operates in a reference orbit, parameters are set as initial values, a new auxiliary satellite executes a formation control task, and the steps 1) to 3) are repeated; or if the formula is invalid, the original auxiliary satellite continues to carry out formation control. The method is high in engineering realization performance, can be used to save fuels, requirements of formation satellite tasks are taken into consideration, and the autonomous level of the satellites can be improved.
Owner:SHANGHAI AEROSPACE CONTROL TECH INST

Engineering reentry guidance method oriented to moving mass aircraft

ActiveCN110425943AWell formedGood engineering application performanceSelf-propelled projectilesRolling angleMethod engineering
The invention discloses an engineering reentry guidance method oriented to a moving mass aircraft. The engineering reentry guidance method is used for solving the technical problem of poor engineeringapplicability of an existing moving mass aircraft reentry guidance method. According to the engineering reentry guidance method, on the basis of the most common proportional guidance law in the engineering, the landing velocity and the landing angle constraint of the moving mass aircraft is converted into an augmented item, the augmented item parameter is further subjected to robustness expandingdesign, so that the guidance parameter is a function of the flight state deviation of the moving mass aircraft, the guidance precision is ensured when the moving mass aircraft is interfered, and finally the guidance instruction, namely the roll angle instruction size, is determined on the basis of the required overload and the available overload relation. According to the method, on the basis ofa proportional guidance law, the augmented item of the landing angle and the landing speed constraint is added, trajectory lifting and reduction are achieved, meanwhile, the landing angle and the landing velocity constraint are met, and meanwhile, the robustness expanding design is carried out on the augmented term coefficient on the basis, and the method is a moving mass aircraft strong robust guidance method which is simple in form and good in engineering application performance.
Owner:NORTHWESTERN POLYTECHNICAL UNIV

Protection method of cold region dispersive soil side slope

The invention relates to a protection technology of a cold region dispersive soil side slope, in particular to a protection method of the cold region dispersive soil side slope. The protection method aims to solve the problems that frost heaving, stability losing and erosion damaging are prone to occurring in the cold region dispersive soil side slope, and an existing protection method is large in project amount and large in rain wash influence. The protection method comprises the steps that 1 a layer of geotechnical cloth is pre-laid at the position where a composite material is to be laid; 2 a polyurethane binder and gravel are mixed evenly to obtain the composite material; 3 the composite material obtained in the step 2 is laid on a channel side slope before solidification, wherein the laying thickness D satisfies the equation (please see the formula in the specifications), Hz refers to the effective wave height, R equals to 0,35, delta refers to the relative density of a slope protection layer, refers to a wave breaking parameter and is calculated according to the equation (please see the formula in the specifications), refers to the average wave length and alpha is the slope protection inclination; 4 a catch drain is excavate in the top of a channel; 5 the composite material obtained in the step 2 is laid in the foot fixing position at the bottom of the channel, and then protection of the cold region dispersive soil side slope is completed.
Owner:HEILONGJIANG PROVINCIAL HYDRAULIC RES INST

Method for determining acting range of biogas gas guiding well of municipal solid waste landfill

The invention provides a method for determining an acting range of a biogas gas guiding well of a municipal solid waste landfill, comprising the following steps of: drilling a plurality of gas guiding wells in the municipal solid waste landfill along the same straight line; selecting the two gas guiding wells to be respectively used as a gas pumping well and a detection well; if the pressure of the detection well is positive pressure, determining that the acting range of the gas guiding wells is less than the distance between the two wells; if the pressure of the detection well is negative pressure, determining that the acting range of the gas guiding wells is more than the distance between the two wells; selecting different gas guiding wells to be combined to gradually and accurately determine the acting range interval of the gas guiding wells; and when the pressure of the detection well is zero or weak negative pressure and the oxygen concentration is more than zero, determining that the distance between the detection well and the gas pumping well is the acting range of the gas guiding wells. According to the method for determining the acting range of the biogas gas guiding well of the municipal solid waste landfill, the problems of the existing method that the engineering period is long and the quantity of the drilled wells is more are solved, and the aim of determining the acting well of the gas pumping well by an optimized scheme is achieved; and the method is convenient to operate and is safe and practical.
Owner:CHINA URBAN CONSTR DESIGN & RES INST CO LTD

Multi-section combined earthwork vertical lifting device

The invention relates to a multi-section combined earthwork vertical lifting device. A bottom section of a structure framework is mounted on a foundation pit excavating surface; a standard section of the structure framework is mounted on the bottom section; a top section of the structure framework is mounted on the standard section; a supporting wheel is mounted on the structure framework; guide wheels are further mounted on the bottom section and the top section; track chains are mounted in the grooves of the supporting wheel and the guiding wheels; a hopper is mounted on a hopper shaft through a hinge; the hopper shaft is mounted between two track chains; a plurality of driving devices are mounted on a beam plate or a trestle of a top layer structure and beam plates of all structures in the lower layer, and are used for driving the track chain to drive the hopper to be lifted; a ratchet device is mounted at the bottom of the hopper; opening and closing control is performed through the ratchet device, so that unloading is accomplished. The device solves the problems that rotation operation is required when a long arm excavator or a caterpillar grab bucket shovel beside a soil outlet performs vertical lifting soil loading in reverse building method engineering, and large operating space is required, greatly improves the operating efficiency of earthwork soil discharging in the reverse building method engineering, and meanwhile reduces the space occupied by oil discharging operation.
Owner:SHANGHAI FOUND ENG GRP

Updating method of arid desert area populus diversifolia root searching and cutting

ActiveCN106962105AAvoid destructionAvoid during windy seasonCultivating equipmentsPopulus diversifoliaArid
The invention discloses an updating method of arid desert area populus diversifolia root searching and cutting. The method comprises the following steps of 1, updating area selection; 2, setting updating time; 3, predicting a populus diversifolia root system trend and selecting a reasonable root cutting position; 4, time-delay backfilling. Compared with an existing annular groove updating technology, the updating method has the following advantages that project updating implementation time is set, and the situations are avoided that operation is carried out in a strong wind season, a rooting cutting pit is buried by sand and the advantage conditions of populus diversifolia rooting cutting sprouting seedling are broken; at the same time, because a new sand source is formed by man-made soil disturbance, the strong wind season is avoided and sandy oil amount carried by wind erosion is reduced; the updating position is selectively determined, and the density of a populus diversifolia forest is reasonably distributed; the project amount of the method is decreased by over 78% than annular groove updating, and manpower and material resources are saved; the method is simple, easy to implement and master, quick in returns, good in effect and strong in practicability and operability.
Owner:INST OF AFFORESTATION & DESERTIFICATION PREVENTION & CONTROL XINJIANG ACADEMY OF FOREST SCI

Polymer cement adhesive construction method

The invention relates to a polymer cement adhesive construction method, which belongs to the civil engineering field. The method comprises the following steps: (1) clearing dirt on the concrete surface, treating the base surface, sprinkling water on the concrete surface and keeping the concrete surface to be wet; (2) evenly mixing and stirring ordinary polymer emulsion and cement in a proportion of 1:2, timely painting and brushing after polymer cement adhesive is mixed, wherein the thickness of the painting and brushing is in a range of 0.5mm-1mm; and (3) beginning to pour concrete when the surface of the polymer cement adhesive solidifies and is no longer sticky, wherein the time that the polymer cement begins to solidify is related with temperature, wind-force, humidity and the like. The construction progress is quicker by using the method compared with common methods, and material sources are abundant. The construction is safer, and the economic benefit is good. The process is simple and can enable the concrete of different pouring dates to be combined well, no construction cold joint is generated, and requirements of construction devices are simple and convenient. The construction pollution is small, thereby facilitating environmental protection and health of construction operating workers.
Owner:XINJIANG BEIXIN ROAD & BRIDGE GRP

Method of the update of fixed cured natural licorice root in arid desert area

InactiveCN107027534AAvoid during windy seasonReduce the amount of sand transported by wind erosionHorticulture methodsAridLicorice roots
The invention discloses a method of the update of fixed cured natural licorice root in arid desert area. The method comprises the steps of 1, selection of update area; 2, selection of the implementation time of update project; 3, prognosis of the growing trend of licorice root, selection of reasonable cured parts; 4, backfill extension. The update method has the advantages that, in comparison with the old annular furrow update method, regulations are provided for the implementation time of the update project, construction in the windy season is prevented, the burying of curing holes by sand is prevented, the destruction of the favorable conditions of licorice root cured sprouting seedling is kept away; at the same time, the formation of new sand source due to human destabilization of soil is prevented, windy season is avoided, the wind erosion and the amount of wind carrying sand are subsided; the update location is selectively determined, the density of licorice is wisely controlled; the work amount of the method is reduced by 57% or above compared with the update of the annular groove, manpower and material resources are economized. The method of the update of fixed cured natural licorice root in arid desert area is simple and easy, quick and effective, and is very practical and operable.
Owner:INST OF AFFORESTATION & DESERTIFICATION PREVENTION & CONTROL XINJIANG ACADEMY OF FOREST SCI

Method for Predicting the Principal Stress Direction of Underground Stress Field in Coal Mine

The invention relates to an underground coal mine stress field principal stress direction predicting method. The method is mainly characterized by including the steps that a regional stress field type is preliminarily predicted according to the regional structure evolution history and the modern structure movement characteristics; crossed tunnels with the basically same supporting type in the same stratum are selected for further judging and observing the regional stress field type; the maximum horizontal principal stress direction of the stress field at an observation site is judged according to the underground stress trace geometrical characteristics; through the combination of the stress field type and the maximum horizontal principal stress direction, the maximum principal stress direction, the intermediate principal stress direction and the minimum principal stress direction of the stress field are judged. By means of the method, the problems that an existing coal mine stress field testing method is high in engineering cost and complicated in process are solved; by means of the relations of tunnel deformation, stress trace characteristics, stress field type and principal stress direction, the economical, practical and effective underground coal mine stress field principal stress direction predicting method is put forward.
Owner:HENAN POLYTECHNIC UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products