Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

35results about How to "Ensure a solid connection" patented technology

Station crossing device and method for shield tunneling machine

The invention discloses a station crossing device for a shield tunneling machine. The station crossing device comprises a bracket, a piston mechanism and a jacking mechanism; the bracket is used for receiving and bearing the shield tunneling machine and serves as a reaction frame used when the shield tunneling machine starts tunneling, the piston mechanism comprise a piston component connected with the shield tunneling machine and the bracket and is used for horizontal moving between shield tunneling machine and the bracket, and the jacking mechanism comprises a jacking component connected to the shield tunneling machine and is used for jacking the shield tunneling machine and the bracket to be separated from a foundation. By applying the device, self-waling movement of the shield tunneling machine and the bracket is achieved by means of cooperation movement of the piston mechanism and the jacking mechanism, and a roller steel plate structure or a rail transportation structure which can enable the bracket to move does not need to be arranged for the bracket separately; meanwhile, after the shield tunneling machine crosses a station, the bracket directly serves as the reaction starting frame of the shield tunneling machine, the piston mechanism supports the shield tunneling to tunnel forwards, and the reaction starting frame does not need to be installed independently. The device is simple in structure and easy and convenient to operate, the station crossing working difficulty of the shield tunneling station is greatly reduced, the working time is shortened, the construction efficiency is improved, and the cost is reduced.
Owner:CHINA RAILWAY NO 2 ENG GRP CO LTD

Middle and small span bridge grouting miniature steel pipe pile, pile foundation and construction methods thereof

The invention discloses a middle and small span bridge grouting miniature steel pipe pile, a pile foundation and construction methods thereof. The pile construction method comprises the following steps of geological exploration; fixed-point drilling; hole cleaning; machining and manufacturing of a miniature steel pipe; welding of a centering frame; lowering of the miniature steel pipe and a grouting pipe; secondary hole cleaning; primary grouting; secondary grouting; and obtaining of the grouting miniature steel pipe pile with sealing and flattening. The pile foundation construction method comprises the following steps that the outer surfaces of the side walls of the pile tops are provided with a cushion layer, and group piles are connected into a whole through the cushion layer; and the outer surface of the side wall of the pile top of each pile above the cushion layer is uniformly welded with at least three reinforcing steel bars, and the reinforcing steel bars extend into a bearingplatform at at least 30 times of the diameter of the steel bars to obtain the grouting miniature steel pipe pile foundation. By combining the miniature steel pipe piles with a tunnel pipe shed grouting technology, the construction methods are simple to operate and high in pile forming quality, can solve the problems that surrounding buildings are influenced by pile body damages and static pressuretype pile pressing caused by traditional hammer type pile sinking and the like can be effectively solved and is capable of obviously improving the construction efficiency, reducing pollution and lowering the cost at the same time.
Owner:HEBEI UNIV OF TECH

Brickwork structure wall-breaking and hole-forming pre-jacking recovery construction method

ActiveCN108265996AEnsure a solid connectionRestoration of load transfer pathsBuilding repairsPre treatmentEngineering
The invention relates to a brickwork structure wall-breaking and hole-forming pre-jacking recovery construction method. The brickwork structure wall-breaking and hole-forming pre-jacking recovery construction method comprises the following steps that 1, holes are cleared and pretreated; 2, new walls are built in the holes; 3, when the distances between the top faces of the built new walls and thetops of the holes reach set values, buried-in-type controllable unloaders are mounted between the top faces of the built new walls and the tops of the holes; 4, gaps between the built new walls and old walls around the holes are grouted for closing; and 5, finally, the closed holes are subjected to formwork removal and curing. According to the brickwork structure wall-breaking and hole-forming pre-jacking recovery construction method, compact connection of the new walls and the old walls at the holes can be ensured, the new walls built at the holes are preloaded by arranging the buried-in-typecontrollable unloaders, the load transmitting paths of the building walls are effectively recovered, the safety and reliability of hole recovery are improved, thus the structural safety of a buildingis ensured, and the potential safety hazard is effectively eliminated.
Owner:浙江核力建筑特种技术有限公司

Current collector assembly, battery cell and battery pack

The invention discloses a current collector assembly, a battery cell and a battery pack. The current collector assembly comprises a current collector, wherein the current collector comprises a plurality of layers of tabs, a conductive connection assembly comprises a protection plate and a connection plate, the protection plate is arranged on one side of the plurality of layers of tabs in the thickness direction, and the connection plate is arranged on the other side of the plurality of layers of tabs in the thickness direction; and one of the connecting plate and the protection plate is provided with bulges, the bulges penetrate through the plurality of layers of tabs through high-frequency vibration and are electrically connected with the plurality of layers of tabs, and the frequency of the high-frequency vibration is in a range of 15KHz to 40KHz. According to the current collector assembly, the bulges pierce the plurality of layers of tabs through high-frequency vibration, the high-frequency vibration acts on the contact surfaces of welded objects, the surfaces of the two objects rub against each other to generate heat, fusion between molecular layers is formed, and then the welding speed between the bulges and the plurality of layers of tabs is increased; by arranging the protection plate covering the bulges, the top parts of the bulges are prevented from exceeding a protective cover, the bulges are prevented from being damaged, and the service life of the current collector assembly is prolonged.
Owner:XIAMEN HAICHEN NEW ENERGY TECH CO LTD

Box-type membrane separation device

The invention discloses a box-type membrane separation device, and relates to the technical field of membrane separation equipment. The box-type membrane separation device comprises a box with an opening in the top; a box cover is arranged at the top of the box in a matching manner; a plurality of supporting plates are arranged up and down inside the box longitudinally side by side; the opposite ends of the supporting plates are fixedly connected to the side surface of the box through connecting plates; a plurality of mounting holes are formed in the surfaces of the supporting plates side by side; membrane assemblies are arranged inside the mounting holes through fixing mechanisms; the tops of the membrane assemblies are connected to a first liquid conveying pipe through connecting pipes;the first liquid conveying pipe is positioned above the box cover; one end of the first liquid conveying pipe is connected to a liquid draining pipe; the bottoms of the membrane assemblies are connected to a second liquid conveying pipe through connecting pipes; the second liquid conveying pipe is positioned below the box; one end of the second liquid conveying pipe is connected with a liquid inlet pipe. Through the arrangement of the membrane assemblies in the box with good sealing performance and coordination with the fixing mechanisms, the service lives of the membrane assemblies are effectively prolonged, and the production cost of a product is reduced; the box-type membrane separation device is suitable for popularization.
Owner:芜湖新瑟安智能科技有限公司

A Restoration Construction Method of Pre-roofing by Opening Hole of Broken Wall of Masonry Structure

ActiveCN108265996BAccurate and reliable scheduled loading valuesEnsure a solid connectionBuilding repairsArchitectural engineeringStructural safety
The invention relates to a brickwork structure wall-breaking and hole-forming pre-jacking recovery construction method. The brickwork structure wall-breaking and hole-forming pre-jacking recovery construction method comprises the following steps that 1, holes are cleared and pretreated; 2, new walls are built in the holes; 3, when the distances between the top faces of the built new walls and thetops of the holes reach set values, buried-in-type controllable unloaders are mounted between the top faces of the built new walls and the tops of the holes; 4, gaps between the built new walls and old walls around the holes are grouted for closing; and 5, finally, the closed holes are subjected to formwork removal and curing. According to the brickwork structure wall-breaking and hole-forming pre-jacking recovery construction method, compact connection of the new walls and the old walls at the holes can be ensured, the new walls built at the holes are preloaded by arranging the buried-in-typecontrollable unloaders, the load transmitting paths of the building walls are effectively recovered, the safety and reliability of hole recovery are improved, thus the structural safety of a buildingis ensured, and the potential safety hazard is effectively eliminated.
Owner:浙江核力建筑特种技术有限公司

Pipettor

The invention relates to a pipettor which comprises an outer frame, an inner frame, a liquid path pipe, a ball head connecting rod, a ball head and a de-sucking head mechanism, wherein the inner frame is fixedly connected with a power rod and is driven to move by the power rod; the outer frame is suitable for sliding up and down along the inner frame; the ball head connecting rod penetrates through the inner and outer frames; the top end of the ball head connecting rod is fixedly connected with the inner frame and is electrically insulated with the inner frame; the ball head is fixed at the bottom end of the ball head connecting rod and is used for clamping a suction head; the liquid path pipe vertically penetrates through the inner and outer frames, and passes through the ball head connecting rod and the ball head; the de-sucking head mechanism comprises an ejector pin, a rocker and a sleeve; the sleeve is arranged at the bottom of the outer frame, and is arranged outside the ball head connecting rod and the ball head in a sleeving manner, and is opposite to the position of the suction head; the top end of the ejector pin is limited in a hollow cavity of the inner frame; the ejector pin is suitable for sliding up and down along the inner frame; the rocker and the inner frame are hinged, one end of the rocker props against the top end of the ejector pin and the other end of the rocker props against the outer frame. The pipettor is compact in structure, is used for automatically extracting the suction head and the de-sucking head when medical / chemical and various measuring devices transfer liquid and is capable of detecting whether the suction head is in contact with the liquid surface.
Owner:SHANGHAI UNITED INTELLIGENCE ROBOTICS INC

Connector with novel plug-in structure

The invention relates to the technical field of connectors, in particular to a connector with a novel plug-in structure, which comprises a metal shell and a plastic shell, a plurality of terminal mounting columns are arranged on the metal shell in an array manner, the plastic shell is provided with a plurality of mounting cavities, and the terminal mounting columns of the metal shell are inserted into the mounting cavities of the plastic shell. A plug-in concave part is arranged between the terminal mounting columns, the plug-in concave part comprises a plurality of symmetrically arranged T-shaped grooves, a plug-in convex part is correspondingly arranged on the plastic shell, the plug-in convex part is a T-shaped column arranged corresponding to the T-shaped grooves, the T-shaped grooves comprise an outer groove and an inner groove, and clamping hooks are arranged on two sides of a notch of at least one of the outer groove and the inner groove. The T-shaped column comprises an outer column and an inner column which are connected together, the adjacent side faces of the outer column and the inner column abut against the step face of the outer groove, the connector is compact in structure, mold structure design is facilitated, the metal shell and the plastic shell are convenient to assemble and plug, connection is tight, the connection strength is high, looseness is avoided, and stable connection of the terminals in the connector is effectively guaranteed.
Owner:AMPHENOL AUTOMOTIVE CONNECTION SYST CHANGZHOU CO LTD

Immersed tube sinking device capable of buffering

ActiveCN111608203AImproving the accuracy of sinking and laying constructionAchieve fixationArtificial islandsUnderwater structuresImmersed tubeMechanical engineering
The invention discloses an immersed tube sinking device capable of buffering. The immersed tube sinking device capable of buffering comprises a guide part and a sinking assembly, wherein at least partof the structure of the guide part is used for being inserted into the water bottom; the sinking assembly comprises a connecting frame and a sinking body, the connecting frame comprises a frame bodyand three frame side seats, the frame body comprises a first frame body and a second frame body, the first frame body is connected with a tube main body section, and the second frame body is connectedwith a tube connecting section; the first frame body and the second frame body are provided with telescopic adjusting assemblies, the heights of the first frame body and the second frame body in theextending direction of the guide part are adjustable, two frame side seats in the three frame side seats are connected to the first frame body and the second frame body and are oppositely arranged, and the other frame side seat is connected between the two oppositely arranged frame side seats; an accommodating groove is defined by the three frame side seats, the first frame body and the second frame body, and the sinking body is embedded in the accommodating groove, connected with the guide part and capable of moving in the extending direction of the guide part. According to the technical scheme, the sinking construction precision of an immersed tube is improved.
Owner:CHINA CONSTR ENG HONG KONG

Lifting pot cover

The invention relates to a lifting pot cover. The lifting pot cover is used for solving the problems of collision, clamping injury and the like caused by excessive descending of a lifting pot cover, and comprises a top device, a lifting device and a pot cover which are vertically connected, the upper end of the top device is fixedly connected with a ceiling, the lower end is connected with a plug arranged at the upper end of the lifting device, and the lower end of the lifting device is elastically connected to the pot cover. The lifting device comprises: a telescopic sleeve which comprises an outer pipe and an inner pipe, wherein the inner pipe is arranged in the outer pipe, and the lower end of the inner pipe is elastically connected to the pot cover; a transmission assembly, wherein the transmission assembly is arranged in the inner pipe; and a clutch assembly which comprises a matching piece and a joint piece, wherein the matching piece and the joint piece are arranged in the outer pipe, the matching piece is arranged at the upper end of the inner pipe, and the joint piece is arranged on the transmission assembly. The transmission assembly controls lifting motion of the inner pipe through separation and connection of the joint piece and the matching piece, and when descending of the inner pipe is blocked, the joint piece is separated from the matching piece.
Owner:GUANGDONG GAJUM IND CO LTD

Fan power station with photovoltaic power generation function

The invention relates to the field of machinery, in particular to a fan power station with a photovoltaic power generation function. A fan power station with a photovoltaic power generation function comprises at least three wind driven generators, each wind driven generator comprises a windmill tower, and each windmill tower comprises a tubular body with a circular cross section; a first installation frame is arranged on the outer side of the tubular body, a first flexible solar cell panel is installed on the inner side of the first installation frame, and the first flexible solar cell panel is attached to the outer surface of the tubular body. By means of the design, the fan power station with the photovoltaic power generation function is provided, through cooperative work of the windmill tower barrel, the first installation frame, the first flexible solar cell panel and other components, it is guaranteed that the first flexible solar cell panel is stably connected with the windmill tower barrel, and the use effect of a wind driven generator is improved; the power generation modes of the fan power station are increased, the utilization rate of the windmill tower drum is improved, and the power generation effect of the fan power station is further improved.
Owner:NANTONG QIANGSHENG PHOTOVOLATIC TECH

Immersion tube sinking device that can be buffered

ActiveCN111608203BImproving the accuracy of sinking and laying constructionAchieve fixationArtificial islandsUnderwater structuresImmersed tubeMechanical engineering
The invention discloses an immersed tube sinking device capable of buffering, which includes a guide piece and a sinking assembly. The guide piece has at least a partial structure for being inserted into the bottom of the water; the sinking assembly includes a connecting frame and a sinking body, and the connecting frame It includes a frame body and three frame side seats. The frame body includes a first frame body and a second frame body. The first frame body is connected to the main pipe section, and the second frame body is connected to the pipe connection section; the first frame body and the second The frame body is equipped with a telescopic adjustment assembly, the height of the first frame body and the second frame body in the direction of the extension of the guide can be adjusted, and two of the three frame side seats are connected to the first frame body and the second frame body. The frame body is arranged oppositely, and the other frame side seat is connected between the two frame side seats that are oppositely arranged; the three frame side seats, the first frame body and the second frame body are enclosed to form a storage tank, and the sinking The storage body is embedded in the accommodating groove, is connected with the guide piece, and can move along the extending direction of the guide piece. The technical scheme of the invention improves the construction precision of sinking and placing immersed tubes.
Owner:CHINA CONSTR ENG HONG KONG

Cavel structure for front auxiliary frame and front auxiliary frame

The cleat structure is arranged on the left side and the right side of the middle of the front auxiliary frame and comprises cleat supports arranged on the tops of corresponding longitudinal beams of the front auxiliary frame up and down, and the lower ends of the cleat supports wrap the top faces of the corresponding longitudinal beams and are fixed to the top faces of swing arm supports on the outer sides of the longitudinal beams. The upper end of the cleat support is provided with a connecting hole channel which vertically extends and allows a connecting bolt connected with a vehicle body to penetrate through, the outer side of the hole wall of the connecting hole channel is broken in the height direction and exposed, the lower end opening of the connecting hole channel is in a closed state, and the upper end opening of the connecting hole channel is exposed out of the top face of the cleat support and is in an open state. And the connecting bolt is communicated with the crevasse of the connecting hole channel to form a separation notch for separating the connecting bolt when the vehicle collides. According to the front auxiliary frame, the connecting bolt can be easily separated from the cleat support when a vehicle is collided, the situation that the front auxiliary frame moves backwards and is embedded into a passenger compartment is avoided, and the life safety of a driver and passengers is protected.
Owner:NINGBO JIANXIN CHASSIS SYST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products