Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

41results about How to "Sufficient deformability" patented technology

Instrument of novel circuit board module structure

The invention discloses an instrument of a novel circuit board module structure. The instrument comprises a shell and a circuit board module arranged in the shell and is characterized in that the circuit board module comprises four circuit boards which are assembled to form a square frame structure in the upper direction, the lower direction, the front direction and the back direction, and abutting connection portions of the adjacent circuit boards are in circuit connection through plug-in connectors and provided with bayonets and bayonet flanges, wherein the bayonets and bayonet flanges are used for steady connection and are clamped with each other. According to the circuit board module structure, circuit connection and structural fixation between the circuit boards are achieved by means of the fixing effect of the plug-in connectors, it is ensured that the circuit board module is steadily and fixedly installed in the shell through the plug-in connectors in cooperation with a clamping structure, limiting reinforcing flange bodies and the like, no clamping grooves or other structures need to be formed in the shell of the instrument, no screws or other parts are needed, disassembly and assembly are convenient, the processing technology of the instrument is simplified, the product cost is reduced, the structure of the instrument has the good radiating effect, and the instrument is safe and reliable.
Owner:南京深科博业电气股份有限公司

Energy consumption damper based on tension compression and yield of trepanning steel plate

Theinvention relates to an energy consumption damper based on the tension compression and yield of a trepanning steel plate, and belongs to the field of buildings. The energy consumption damper basedon the tension compression and yield of the trepanning steel plate comprises a trepanningcore plate, external constraint plates and cone-shaped connecting pieces; a first connecting hole and a secondconnecting hole which are used for connecting the cone-shaped connecting pieces are formed in the trepanning core plate, and a third connecting hole used for connecting the externalconstrain plates isformed in the trepanning core plate; the cone-shaped connecting pieces are located at the upper and lower ends of the trepanning core plate, and the inner ends of the cone-shaped connecting piece canslide relatively on the trepanning core plate through a second fastener located in the secondconnecting hole under the action of external force; and the external constrain plates arelocated on the twosides of the middle of the trepanning core plate, and are connected with the trepanning core plate through a third fastener located in the third connecting hole. The invention provides a novel energyconsumption device for structure seismic of props, piers and the like.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Concrete wall and prefabricated profiled steel sheet composite plate connecting structure and construction process thereof

The invention discloses a concrete wall and prefabricated profiled steel sheet composite plate connecting structure and a construction process thereof, and belongs to the technical field of building structures. The concrete wall and prefabricated profiled steel sheet composite plate connecting structure comprises a concrete wall body and a prefabricated profiled steel sheet concrete composite plate, a first connecting piece is embedded in the concrete wall body, the first connecting piece is fixedly connected with a plurality of connecting studs, and a post-pouring area is reserved in the prefabricated profiled steel sheet concrete composite plate. Stud holes are reserved in a profiled steel sheet located in the post-pouring area, the prefabricated profiled steel sheet concrete composite plate is arranged above the part, located outside the concrete wall body, of the first connecting piece, the connecting studs are inserted into the stud holes of the profiled steel sheet, and high-strength concrete or high-strength mortar is poured in the post-pouring area. According to the concrete wall and prefabricated profiled steel sheet composition plate connecting structure and the construction process thereof, the structure is simple, construction is convenient, the force transmission mode between components is clear, enough deformation capacity is achieved at the connecting position, and the integrity and safety of the structure are enhanced.
Owner:辽宁省城乡市政工程集团有限责任公司

Window opening forming superimposed shear wall coupling beam assembling construction method

The invention relates to a window opening forming superimposed shear wall coupling beam assembling construction method which comprises the following steps: prefabricating a superimposed shear wall wallboard comprising a window upper wall coupling beam and a window lower wall coupling beam, and transporting the wallboard to a construction site for assembling; and adopting interlayer vertical connecting rebars and post-poured core concrete to effectively connect upper-layer and lower-layer superimposed wallboards. According to the construction method, through changing the quantity of vertical connecting rebars in window upper wall and window lower wall core post-poured concrete when window opening forming superimposed wallboards are assembled, all-pass seam and zero connection coupling beams, half-pass seam and weakly-connected coupling beams, half-pass beam and equi-connection coupling beams can be formed separately to meet different anti-seismic demands; the half-pass seam and weakly-connected upper-lower superimposed deep coupling beams can realize multi-stage working mechanism; this types of coupling beams have sufficient resistant-lateral rigidity and deformation capacity underthe action of frequent earthquakes and earthquakes with the design intensity and can be converted into double coupling beam stress mechanism under the action of the rare occurrence earthquake to meetthe performance objective at different stages.
Owner:WUHAN UNIV OF TECH +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products