The invention relates to the technical field of gas adsorption and purification, and discloses an adsorption and purification device for semi-
coke coal gas, which comprises a
spray tower, a spray
dust fall component, a regeneration
tower, a first heating jacket, a regeneration shaft, a second heating jacket, a second heating jacket, a second heating jacket, a third heating jacket, a fourth heating jacket and a fourth heating jacket, a plurality of groups of
nitrogen spray holes distributed in a circumferential array are formed in the regeneration shaft, a spiral lifting sheet is mounted on the regeneration shaft and corresponds to the inner side of the regeneration
tower, a spiral dust filtering sheet is mounted on the regeneration shaft and corresponds to the inner side of the
spray tower, and the regeneration
tower is communicated with two symmetrically arranged adsorption purification modules. When the adsorption purification device is used for purifying
coal gas, the integrated regeneration of the adsorption
filter material and the refilling of the regenerated adsorption
filter material can be realized, so that the automatic maintenance of the
coal gas purification device is realized, and the purification and adsorption performance of the purification device is maintained.