The invention relates to the technical field of
oil field water injection wells, in particular to an underground separated injection
pipe column and a separated layer water injection method, and aims to solve the problem that high-pressure layer injection of an existing separated injection
pipe column is insufficient. The underground separate injection tubular column comprises a first packer, a water
distributor, a second packer, a sliding sleeve, a screen
pipe and a screwed plug which are sequentially arranged. The sliding sleeve is used for opening and closing the water injection hole; a first water injection layer is arranged between the first packer and the second packer, and a second water injection layer is arranged at the end, away from the first packer, of the second packer. The water
distributor is used for injecting water into the first water injection layer, the water injection hole and the screen pipe are used for injecting water into the second water injection layer, and the oil layer pressure of the second water injection layer is higher than that of the first water injection layer; the plug is used for plugging the
tail end of the tubular column. According to the underground separate injection tubular column, water injection is conducted on a low-pressure layer through the water
distributor, water injection is conducted on a high-pressure layer through the water injection holes and the screen pipe in the mode that the water injection holes are opened through the sliding sleeve, and the problem that injection of the high-pressure layer is insufficient is avoided.