Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

79results about How to "Easy hanging installation" patented technology

Assembly connection structure and method of coupling beams of shear walls of assembly concrete frame shear structure

ActiveCN104481031ASplit location is reasonableEasy to manufactureWallsCouplingEngineering
The invention relates to the field of assembly concrete structures, in particular to an assembly connection structure and method of coupling beams of shear walls of an assembly concrete frame shear structure. Grouting seams and equivalent bars are arranged between prefabricated coupling beams and prefabricated shear walls or between the coupling beams of the shear walls with half-span coupling beams for beam-wall or beam-beam connection. Holes are reserved in the prefabricated coupling beams and the coupling beams of the prefabricated shear walls or the shear walls with half-span coupling beams, spiral stirrups are arranged surrounding the holes in advance, the equivalent bars penetrate through the preserved holes, the reserved horizontal holes and the grouting seams between the beams and walls or between the beams are filled by grouting minimum inflation mortar, therefore the prefabricated coupling beams, the prefabricated shear walls and the equivalent bars, or the coupling beams of the shear walls with half-span coupling beams and the equivalent bars can be firmly integrated, and connection of the prefabricated coupling beams and the coupling beams of the prefabricated shear walls or the shear walls with half-span coupling beams can be achieved. The assembly connection structure and method greatly reduce the project construction cost and reduce site concreting wet construction.
Owner:浙江筑工科技有限公司

Construction method of connecting beam type spliced building structure

The invention provides a construction method of a connecting beam type spliced building structure. The construction method comprises the following steps that members are prefabricated in a workshop, including at least inner layers and outer layers of columns, cross beams, slabs and shear walls; joints of the columns are located at the positions among the slabs; the columns are hoisted; the shear walls are installed; the cross beams are hoisted and arranged on bracket supports of the columns, wherein the cross beams are prestressed beams; the ends of the cross beams are connected with one another or are connected with the columns by connecting tension steel wires ropes; the slabs are hoisted on the cross beams; a spliced building is obtained by repeating the steps in sequence. The problem can be solved that an existing assembled structure is poor in compressive strength and easily produces stress concentration, the problem of poor anti-seismic property of a cast-in-place concrete structure can be also solved, and the influence on a linear construction period is not large. Members can be decreased by 30%-50%, the hoisting weight can be reduced by 20%-35%, and the construction periodis remarkably shortened compared with a cast-in-place structure. The overall anti-seismic property of the building is effectively improved.
Owner:HUBEI PEI HAN CONSTR CO LTD

Cable sheath fault monitoring device and method based on broadcast synchronization signals of multiple Rogowski coils

The invention relates to a cable sheath fault monitoring device and method based on broadcast synchronization signals of multiple Rogowski coils. The method comprises the following steps of: 1, setting the primary-secondary transformation ratios of Rogowski coils in a grounding current acquisition sensor and a cable load acquisition sensor to be less than or equal to 1000: 1; 2, installing the grounding current acquisition sensor at the direct grounding position or the cross interconnection grounding position of each monitored line, and installing the cable load acquisition sensor on a cable body; 3, detecting a grounding current and a cable load current, respectively transmitting the grounding current and the cable load current to each monitoring host for signal processing, and transmitting the results to a server through a communication module; 4, when it is judged that a pulse load comes from the grounding circulation signal, enabling the hosts to broadcast control signals, and enabling all the monitoring hosts to collect the control signals at the same time within a preset time to make the synchronization error within 0.1 s; and 5, analyzing and processing the signals monitoredby the plurality of hosts, and predicting whether a fault occurs or not.
Owner:郑州中聖电子科技有限公司

Assembled monolithic shear wall building structure and construction method thereof

InactiveCN109594649AEasy seam connectionReliable seam connectionWallsBuilding material handlingTransverse grooveEngineering
The invention provides an assembled monolithic shear wall building structure and a construction method thereof. The assembled monolithic shear wall building structure comprises prefabricated walls (1)without windows, prefabricated walls (2) with windows, floor boards (3), first wall columns (4), second wall columns (5) and third wall columns (6), wherein each prefabricated wall (2) with windows comprises a window reserving frame, window reserving frame beams and walls on two sides of the window reserving frame; a plurality of parallel full-length connecting vertical holes (7) are formed in the prefabricated walls (1) without windows, the prefabricated walls (2) with windows, the floor boards (3), the first wall columns (4), the second wall columns (5) and the third wall columns (6) in theheight direction, and a plurality of full-length transverse grooves (8) are formed in the width direction; transverse main reinforcements (9) are arranged in the full-length transverse grooves (8), and vertical main reinforcements (10) are arranged in the full-length connecting vertical holes (7). The assembled monolithic shear wall building structure has the characteristics of high constructionspeed, reliable quality and good anti-seismic property.
Owner:NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER

Structure of connecting shear walls and coupling beam by U-shaped steel bars and connecting pieces, and assembling method

The invention relates to the field of assembly type concrete structures, and specifically relates to a structure of connecting shear walls and a coupling beam by U-shaped steel bars and connecting pieces, and an assembling method. A structure splitting and assembling system is formed by a coupling beam in prefabricated shear walls, and prefabricated shear walls, or a coupling beam of a shear wall with a half-span coupling beam, and U-shaped connecting steel bars, and the connecting pieces are pre-embedded in the prefabricated coupling beam, the prefabricated wall or the prefabricated wall with a beam. When the coupling beam of the shear walls in the assembly type concrete frame-shear wall structure is long, splitting is carried out at positions where two ends of the coupling beam are connected with the shear walls, and the prefabricated coupling beam and the two prefabricated walls connected with beam ends of the prefabricated coupling beam are respectively manufactured; and when the coupling beam of the shear walls in the assembly type concrete frame-shear wall structure is short, splitting is carried out at the midspan position of the coupling beam, and two prefabricated walls with a beam are formed after splitting is carried out, and the connection method is mentioned above. Connection of the shear walls and the coupling beam is achieved by the U-shaped steel bars and the connecting pieces, components are simple and workable, the assembling process is simple, time is saved and efficiency is high, and applicability is wide.
Owner:SHENYANG JIANZHU UNIVERSITY

Suspended air purifying equipment

The invention discloses suspended air purifying equipment. The suspended air purifying equipment comprises an equipment body and a suspension frame; the equipment body is located in the suspension frame; the suspension frame comprises a bottom bracket, a top pressing assembly and an upper baffle; the bottom bracket comprises a first bracket assembly and a second bracket assembly; the top pressingassembly is located on the upper portion of the equipment body; and the top pressing assembly is connected with the upper baffle. Through the design of the suspension frame, suspension mounting of theequipment body is more convenient, operations such as punching do not need to be conduct on the equipment body, meanwhile, the equipment body can be fully supported and clamped up and down,, back andfront, and left and right, the fastness of the equipment body after suspension is effectively ensured, through the suspension frame, suspension and fixing of the equipment body are achieved, and theequipment body is protected against dust, the service life of the equipment body is further prolonged, through the whole suspension frame, the contact area between the equipment body and air can be ensured, and thus the radiating rate of the equipment body is effectively ensured.
Owner:苏州乐赢科技咨询有限公司

Sound pressure calibration method for long linear array cable hydrophone

The invention relates to the technical field of array cable hydrophone performance measurement, and in particular relates to a sound pressure calibration method for a long linear array cable hydrophone. The method comprises the steps of S1 coiling a long linear array cable on a hollow measurement frame according to a certain interval distance, and meanwhile, keeping a hydrophone array element fixed at each relative position of the array cable; S2 vertically suspending and fixing a low-frequency sound source on the hollow measurement frame by using a nylon rope, tensioning the circumference ofthe sound source in four directions by using the nylon rope, so that the sound source does not swing forwards, backwards, leftwards and rightwards, and the circumferential radiation center of the sound source and the measured hydrophone array element are positioned at the same horizontal position; S3 installing a standard hydrophone at the position, a certain distance away from the sound source, of the hollowed measurement frame, and the standard hydrophone and the sound source being located at the same horizontal position without swing; and S4 hoisting the whole mounted hollow measurement frame into water by using a steel cable. During working, no matter what the posture of the underwater measurement frame changes, the influence of water flow and the deviation of depth do not influence the measuring process.
Owner:HAIYING ENTERPRISE GROUP

Adjustable insulating flat ladder hook for equipotential operation

The invention discloses an adjustable insulating flat ladder hook for equipotential operation, and belongs to the field of electric operation equipment. The problems that in the prior art, the adjustable insulating flat ladder hook for equipotential operation is not available, wherein the adjustable insulating flat ladder hook is simple in structure, convenient, reliable and convenient to mount, the position of the insulating flat ladder hook can be adjusted during use, and the operation position can be conveniently adjusted by workers are solved. The adjustable insulating flat ladder hook mainly comprises a rack, and a fixing sleeve is arranged at the tail end of the rack. Two main U type wheels are arranged on the rack, the two main U type wheels are connected through a chain, a rotary gear is arranged on the chain, and the rotary gear is provided with a rotary handle. A through hole and a clamping block I are arranged on the rack, a vertical column is arranged in the through hole, an auxiliary U type wheel is arranged below the vertical column, the auxiliary U type wheel is connected with the vertical column through a U type wheel fixing part, and a clamping block II is furtherarranged on the vertical column. Stop blocks are arranged at the upper end of the vertical column, and a pressure spring is arranged between the stop blocks. When the adjustable insulating flat ladderhook enters an electric field with an insulating flat ladder method, the adjustable insulating flat ladder hook is mounted on a ladder head of an insulating flat ladder.
Owner:STATE GRID SHANDONG ELECTRIC POWER +1

Corrugated steel cofferdam hollow digging pile and manufacturing technique thereof

The invention relates to a corrugated steel cofferdam hollow digging pile and a manufacturing technique thereof. The corrugated steel cofferdam hollow digging pile comprises a cofferdam, a steel bar concrete hollow pile body in the cofferdam, and a pier stud above the steel bar concrete hollow pile body. The cofferdam is provided with a plurality of circular corrugated steel wallboards arranged in a layered mode. The diameters of the circular corrugated steel wallboards arranged in the layered mode are decreased sequentially from top to bottom. A transverse corrugated steel connection plate is arranged in a gap between every two adjacent circular corrugated steel wallboards. The manufacturing technique of the corrugated steel cofferdam hollow digging pile comprises the steps that a hoisting excavator excavates the first section of pile hole, and the first layer of circular corrugated steel wallboard is arranged; the multiple layers of circular corrugated steel wallboards with the diameters decreasing from top to bottom are arranged through the same construction method; a hollow inner mold is mounted and perfected; pouring of all concrete of a pier foundation is completed; and finally the pier stud is embedded and connected with steel bars. According to the corrugated steel cofferdam hollow digging pile and the manufacturing technique thereof, the material consumption of the cofferdam is low, the frictional resistance of the pile wall is high, the diameter of the pile is large, the open excavation speed is higher than the drilling speed, the technique is easy and convenient to implement, and the economic benefits are good.
Owner:JSTI GRP CO LTD

Lighting equipment for emergency management

The invention discloses lighting equipment for emergency management. The equipment includes a mounting base, two connecting columns are fixedly connected to the upper surface of the mounting base; illuminating lamps are arranged at the top ends of the two connecting columns; two telescopic rods are hinged to each of the two sides of the mounting base; one end of each of the four telescopic rods isfixedly connected with a hanging ring; two fasteners are fixedly connected to the outer side of the mounting base; a mounting groove is formed in the back surface of the mounting base; and a fixing rod is fixedly connected to the interior of the mounting groove, two moving blocks are arranged on the outer surface of the fixing rod in a sleeving mode, a limiting sliding rail is fixedly connected to the interior of the mounting groove, two limiting sliding blocks are slidably connected to the interior of the limiting sliding rail, and the two limiting sliding blocks are fixedly connected with the two moving blocks correspondingly. According to the invention, through various different mounting modes, the mounting requirements of various lighting environments are met, the diversification of the mounting modes of the lighting lamp is improved, and meanwhile, the working difficulty of mounting personnel is also reduced.
Owner:广州百畅信息科技有限公司

Computer network monitoring device

The invention discloses a computer network monitoring device. The computer network monitoring device comprises a shell, wherein a heat dissipation fan is inlaid at the bottom end of the shell, a heatconducting plate is fixedly arranged in the shell, a central processing unit is fixedly arranged at the top of the heat conducting plate, a data memory and a data acquisition card are respectively arranged on two sides of the top of the heat conducting plate, a storage battery pack and a switch body are arranged at the top portion of the heat conducting plate, a transverse plate is welded on the front surface of the shell, connecting rods are movably inserted into two ends of the transverse plate, a pressing plate is fixedly connected to the top ends of the connecting rods, a top cover is hinged to the rear end of the top portion of the shell, a groove is formed in the top portion of the top cover, an end cover is hinged to the inside of the groove, a touch screen is inlaid at the bottom end of the end cover, and a wireless communicator and an acousto-optic buzzer are respectively installed at the two sides of the top portion of the top cover. The computer network monitoring device issimple and reasonable in structural design and convenient to operate, is capable of simultaneously monitoring a plurality of computers in a network, is safe and stable, wide in application range and beneficial to popularization.
Owner:威海云之卫智能科技有限公司

Fire-receiving basin convenient to adjust and used for steel structure welding

The invention relates to the technical field of welding fire-receiving basins, in particular to a fire-receiving basin convenient to adjust and used for steel structure welding. The fire-receiving basin comprises a fire-receiving basin body, wherein the fire-receiving basin body is particularly a rectangular basin body, sliding grooves are formed in two opposite sides of the fire-receiving basin body, a moving plate is installed in the sliding grooves, clamping grooves are formed in the top of the moving plate in the length direction, a plurality of connecting columns are uniformly installed in the clamping grooves in the length direction of the moving plate, the tops of the connecting columns are uniformly provided with a plurality of adjusting holes in the length direction in a penetrating mode, a plurality of adjusting bolts are uniformly installed on the tops of the two sides of the fire-receiving basin body in the length direction, a connecting through hole is formed in the joint of the fire-receiving basin body and the adjusting bolts, fixing plates are installed on the outer sides of the two ends, adjacent to the sliding grooves, of the fire-receiving basin body, the fixing plates are positioned at the tops of the two ends of the fire-receiving basin body, limiting grooves are formed in the two ends of the fixing plates, and fixing blocks are installed at the bottoms of the two ends of the fire-receiving basin body. The fire-receiving basin is simple in structure, convenient to install, suitable for fixing in various modes, convenient to adjust and high in practicability.
Owner:HUBEI XINSUO CONSTR

Adhesive dipping component and device for testing viscosity of soy-based formaldehyde-free wood adhesive

The invention discloses a adhesive dipping component and device for testing the viscosity of a soy-based formaldehyde-free wood adhesive. The adhesive dipping component is formed by connecting more than one square hard sheet, which does not bend in the process of lowering below the liquid level of the soy-based formaldehyde-free wood adhesive, in a cross mode; cross connecting lines are parallel to the vertical side lines of the square hard sheets; a cut-off line, through which the dipped soy-based formaldehyde-free wood adhesive is positioned on a same horizontal surface of the adhesive dipping component, is arranged on each hard sheet. The adhesive dipping device comprises a container filled with the adhesive, the adhesive dipping component, a pulley component which lifts the adhesive dipping component to be completely separated from the liquid level of the soy-based formaldehyde-free wood adhesive so as to apply a stable external force, and a weight component which is matched with the pulley component to apply the stable external force to the adhesive dipping component so as to ensure that the dipping component stably descends or ascends. The viscosity index of the soy-based formaldehyde-free wood adhesive is effectively and quantitatively characterized and tested through the average adhesive dipping amount in unit area.
Owner:宁波朝露新材料科技有限公司

POE power adapter and hanger thereof

The invention relates to the technical field of power adapters, and discloses a POE power adapter which specifically comprises a circuit board, a power connector is fixedly installed on one side of the upper surface of the circuit board, a POE connector is fixedly installed on the other side of the upper surface of the circuit board, a positioning hole is formed in the upper surface of the circuit board, and a lower shell is connected to the lower surface of the circuit board in a clamped mode. A positioning piece is fixedly mounted on the inner bottom wall of the lower shell, an upper shell is clamped on the upper surface of the circuit board, a clamping piece is fixedly mounted on the inner top wall of the upper shell, and the positioning piece is clamped with the clamping piece. Through arrangement of a sleeve, a spring, a sliding rod, a mounting plate and a limiting piece on the bearing plate, a worker can more conveniently unfold the suspension bracket and turn down the bearing plate, so that the operable space of the worker can be increased, the worker can conveniently suspend and mount the POE power adapter, and in the subsequent disassembly and storage process, the work efficiency is improved. And the mounting plate can be stored and limited only by rotating the limiting piece.
Owner:SHENZHEN FLYPOWER TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products