Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

76results about How to "Reasonable weight" patented technology

Assembly connecting structure and assembly connecting method of assembled concrete frame and shear wall combination

ActiveCN102808465ASplit location is reasonableEasy to manufactureWallsBuilding material handlingFloor slabRebar
The invention relates to the field of assembled concrete structures, in particular to an assembly connecting structure and an assembly connecting method of an assembled concrete frame and shear wall combination. A cast-in-place strip is disposed between precast columns and precast shear walls to connect column-wall embedded rebars. Vertical through holes are reserved in a precast node-precast beam integrated component to achieve communicated connection of vertical rebars for the upper and lower columns and the upper and lower shear walls. Embedded steel sleeves at the lower ends of the precast columns and the precast shear walls are mutually embedded with projecting rebar segments extending up out of the lower columns and the lower walls, and are integrated with the lower columns and the lower walls through cast mortar. The projecting straight rebars at the upper ends of the precast columns and the precast walls penetrate through the through holes reserved in the precast node-precast beam integrated component and protrude a floor slab, and the precast columns and the precast nodes are firmly integrated with the precast shear walls precast beams by cast mortar. Wet operations such as in-place casting of concrete are reduced to the maximum extent, building quality is improved, construction period is shortened, and energy conservation and emission reduction are achieved.
Owner:SHENYANG JIANZHU UNIVERSITY

Splitting and assembling structure and assembling connecting method of assembled type concrete frame-shear wall

The invention relates to the field of concrete structures, in particular to a splitting and assembling structure and an assembling connecting method of an assembled type concrete frame-shear wall. The splitting and assembling structure comprises prefabricated pillars, prefabricated beams, prefabricated shear walls and cast-in-situ joints, wherein sleeves are embedded at the lower ends of the prefabricated pillars, mutually embedded with protruding reinforcing steel bar sections which extend from the upper ends of lower layer pillars and are integrally connected with the lower layer pillars by filling mortar; longitudinal prefabricated beam reinforcing steel bars extend into a joint core area to be anchored or connected with side beam ribs in a mechanical manner; a cast-in-situ zone is arranged between the prefabricated pillars and the prefabricated shear walls so as to carry out the connection of the embedded ribs of the pillars and the walls; and the embedded reinforcing steel bar sleeves at the lower ends of the prefabricated shear walls are mutually embedded with protruding reinforcing steel bar sections which extend upwards from the walls at the lower layer and are integrally connected with the walls at the lower layer by filling the mortar. The through connection of the vertical reinforcing steel bars of the share walls at the upper and lower layers is realized by filling the mortar into the through holes and the sleeves at the upper ends of the prefabricated shear walls and the prefabricated beams, so that the key problem that the vertical reinforcing steel bars of the share walls are hard to be continuous because of the isolation of the prefabricated beams is solved.
Owner:SHENYANG JIANZHU UNIVERSITY

Assembly type concrete filled steel tube shear wall splitting and assembling connection structure and assembling connection method

InactiveCN104727467ASplit location is reasonableEasy to manufactureWallsBuilding material handlingEngineeringRebar
The invention relates to an assembling type concrete filled steel tube shear wall splitting and an assembling connection structure and assembling connection method. The structure comprises prefabricated concrete filled steel tube frame pillars, prefabricated shear walls, prefabricated flange walls and a cast-in-place floor; the upper ends of the prefabricated shear walls and the prefabricated flange walls are welded to rebar sleeves and steel tube sleeves respectively, the rebar sleeves and the steel tube sleeves are mutually embedded into rebar protruding segments and steel tube protruding segments respectively, and the upper prefabricated shear wall and the lower prefabricated shear wall are connected as a whole through pouring grouting materials into the sleeves and connected horizontal gaps; the prefabricated shear walls are separated from the prefabricated flange walls at the prefabricated concrete filled steel tube frame pillars, and by arranging sealed U-shaped connection ribs in the frame pillars in a protruding mode in the prefabricated shear walls and the adjacent prefabricated flange walls, erection formwork cast-in-place concrete enables the prefabricated shear walls and the adjacent prefabricated flange walls to form a whole. The assembling type concrete filled steel tube shear wall splitting and the assembling connection structure and assembling connection method greatly reduces the wet construction such as cast-in-place concreting to the largest extent, improves the assemblage degree of practical engineering, and the integrality of the assembly type shear wall structure can be guaranteed.
Owner:NORTH CHINA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Power distribution network reliability evaluation method based on combinational weighting and fuzzy scoring

The invention relates to a power distribution network reliability evaluation method based on combinational weighting and fuzzy scoring. The method comprises the following steps of 1) weighting the reliability indexes of the power distribution network by use of a combinational weighting method composed of one subjective weighting method and (s-1) objective weighting methods, 2) getting the expected value of the weight vector of each index weight coefficient of each weighting method in the combinational weighting method, 3) calculating the subjective weight probability coefficient alpha i and the objective weight probability coefficient beta I of the i evaluation index by use of an expectancy method, 4) obtaining the probability coefficients alpha and beta of the subjective and objective weights in a combination weight by use of the least square method, 5) obtaining a combination weight vector omega according to the weight vector of each index weight coefficient of each weighting method in the combinational weighting method, and 6) performing quantitative scoring on the reliability index data of the power distribution network by use of a fuzzy scoring mechanism for determining a fuzzy typical point based on the delphi method, and obtaining the overall quantitative scoring result of the power distribution network. Compared with the prior art, the power distribution network reliability evaluation method based on combinational weighting and fuzzy scoring is capable of enabling the weight of each evaluation index to be more reasonable.
Owner:SHANGHAI UNIVERSITY OF ELECTRIC POWER

Open Frame Electronic Chassis For Enclosed Modules

An open frame chassis has a top opening and a bottom opening permitting ambient air flow there through. A plurality of modules, each enclosing electrical components which are in thermal contact with a heat sink area of their corresponding module, and each of which can be inserted to an inserted position in the open frame chassis. When the modules are inserted into the open frame chassis, ambient air may flow from the bottom opening of the chassis across the heat sink area of each module to the top opening in order to passively cool the modules and the electrical components enclosed therein. The heat sink area has fins which are separated by a distance of 9 mm to 12 mm and have a height 10 mm to 20 mm. Key pins are associated with the electrical connectors of the chassis to guide the modules into place and prevent incorrect insertion of a different type of electrical module not corresponding to the electrical connection of the chassis for that slot. Guide pins are present on the corners of the modules to mate with guide holes in the chassis to secure the module to the open frame chassis and decrease vibration. Both sides of the chassis have side openings through which the fins of the modules inserted into the end slots of the chassis may be exposed. The power modules are inserted into the end slots. The chassis has an inverted connection at one end slot to accommodate identical power modules at both end slots such that the heat sink area always faces a side opening in the open frame chassis.
Owner:SIEMENS CANADA LTD

Method for acquiring and processing disease symptoms and weight knowledge thereof based on case library

The invention discloses a method for acquiring and processing disease symptoms and weight knowledge thereof based on a case library. According to the method, mass case libraries on the internet are taken as an information source; the disease symptoms and the weight knowledge thereof are automatically acquired by processing original data of the information source; the method comprises the following steps: performing HTML tag matching by adopting a regular expression, and acquiring original data of the disease symptoms through a web crawler strategy; performing word similarity computation and synonym recognition to acquire a medical word similarity table and a medical word synonym table; performing classifying, TF-IDF word frequency statistics and dimensionless processing, and acquiring a plurality of parameters, such as the disease symptoms and the weight knowledge thereof, which are used for integrally evaluating the relation between a disease and symptoms. By adopting the technical scheme provided by the invention, a large amount of manpower, financial resources and time can be saved; the obtained disease symptoms and weight results thereof are more reasonable; the method is suitable for the scenes, such as a medical guide system and an internet-based primary disease self-diagnosing system.
Owner:PEKING UNIV

Ecological environment protection type pavement tile and producing process thereof

The invention belongs to the field of environment-friendly energy-saving building materials, and in particular relates to an ecological environment-friendly footway brick and a production process thereof. The brick comprises a brick body (1), and is characterized in that the upper surface of the brick body (1) is provided with a groove (3); the position of the groove (3) of the brick body (1) is provided with a through hole (2) in the longitudinal direction; the brick body adopts materials (1) comprising a cementitious material, aggregate and activator; the cementitious material contains slag micro-powder, red mud, C-type fly ash and kieselguhr; the aggregate adopts waste residue particles; and the activator contains polycarboxylic acid water reducing agent, power plant desulphurization gypsum, aluminum sulfate slag and fly ash. The production process comprises two parts of: 1) preparing raw materials according to the requirements, and 2) physically molding, which is to install a column-type body on a brick press mold, have the through hole (2) when the brick is physically molded and extrude the groove (3) on the surface of the brick body. The footway brick has the advantages of simple structure and high water seepage efficiency, and can effectively reduce urban heat island effect.
Owner:王振山

Assembly connection structure and method of coupling beams of shear walls of assembly concrete frame shear structure

ActiveCN104481031ASplit location is reasonableEasy to manufactureWallsCouplingEngineering
The invention relates to the field of assembly concrete structures, in particular to an assembly connection structure and method of coupling beams of shear walls of an assembly concrete frame shear structure. Grouting seams and equivalent bars are arranged between prefabricated coupling beams and prefabricated shear walls or between the coupling beams of the shear walls with half-span coupling beams for beam-wall or beam-beam connection. Holes are reserved in the prefabricated coupling beams and the coupling beams of the prefabricated shear walls or the shear walls with half-span coupling beams, spiral stirrups are arranged surrounding the holes in advance, the equivalent bars penetrate through the preserved holes, the reserved horizontal holes and the grouting seams between the beams and walls or between the beams are filled by grouting minimum inflation mortar, therefore the prefabricated coupling beams, the prefabricated shear walls and the equivalent bars, or the coupling beams of the shear walls with half-span coupling beams and the equivalent bars can be firmly integrated, and connection of the prefabricated coupling beams and the coupling beams of the prefabricated shear walls or the shear walls with half-span coupling beams can be achieved. The assembly connection structure and method greatly reduce the project construction cost and reduce site concreting wet construction.
Owner:浙江筑工科技有限公司

Assembled monolithic shear wall building structure and construction method thereof

InactiveCN109594649AEasy seam connectionReliable seam connectionWallsBuilding material handlingTransverse grooveEngineering
The invention provides an assembled monolithic shear wall building structure and a construction method thereof. The assembled monolithic shear wall building structure comprises prefabricated walls (1)without windows, prefabricated walls (2) with windows, floor boards (3), first wall columns (4), second wall columns (5) and third wall columns (6), wherein each prefabricated wall (2) with windows comprises a window reserving frame, window reserving frame beams and walls on two sides of the window reserving frame; a plurality of parallel full-length connecting vertical holes (7) are formed in the prefabricated walls (1) without windows, the prefabricated walls (2) with windows, the floor boards (3), the first wall columns (4), the second wall columns (5) and the third wall columns (6) in theheight direction, and a plurality of full-length transverse grooves (8) are formed in the width direction; transverse main reinforcements (9) are arranged in the full-length transverse grooves (8), and vertical main reinforcements (10) are arranged in the full-length connecting vertical holes (7). The assembled monolithic shear wall building structure has the characteristics of high constructionspeed, reliable quality and good anti-seismic property.
Owner:NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER

Communication network comprehensive performance evaluation parameter weight determination and adjusting method

The invention provides a communication network comprehensive performance evaluation parameter weight determination and adjusting method. The method includes: firstly, calculating a fixed weight of a communication network comprehensive property evaluation parameter by employing an improved analytic hierarchy process based on a communication network comprehensive performance evaluation parameter system; and then adjusting the weight of the evaluation parameter by employing a variable weight algorithm based on historical data and expert experience information on the basis of basic data of the calculated fixed weight, and finally obtaining a final index weight. According to the method, the calculated fixed weight depending on expert experience is adjusted by employing the historical data, the expert opinions are fully respected, the historical information is reasonably utilized, the final weight can be scientific and reasonable, the effectiveness and the reliability of network comprehensive performance assessment results are improved, by employing the method, the revision of the index weight in an index system does not need reorganization of experts for evaluation, only the best ideal value and the worst ideal value of each index after multiple years are given, and the assessment cost is greatly reduced.
Owner:NORTH CHINA ELECTRIC POWER UNIV (BAODING)
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products