Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

30results about How to "The calculated results are in line with the actual" patented technology

Mountain torrent disaster on-line monitoring and identification early warning method and early warning system

The invention discloses a mountain torrent disaster on-line monitoring and identification early warning method. The method includes the following steps that: a data acquisition subsystem acquires data at a site: an automatic rainfall monitoring station acquires and processes disaster field rainfall information and transmits the information to the system platform of an early warning index analysis model through a wireless mode and/or a wired transmission mode, a water level and/or mud level monitoring station acquires and processes field debris flow and water level information and transmits the information to the system platform of the early warning index analysis model through a wireless mode and/or a wired transmission mode, and a video monitoring station acquires and processes disaster field image information and transmits the information to the system platform of the early warning index analysis model through a wireless mode and/or a wired transmission mode; an identification early warning subsystem performs early warning judgment and issues internal early warnings; personnel are determined, and formal early warnings are issued; real-time monitoring is performed; and information query is performed. The method has the advantages of rapid identification and predictive early warning, and can assist in avoiding loss. The invention also discloses an early warning system using the mountain torrent disaster on-line monitoring and identification early warning method.
Owner:CHANGJIANG RIVER SCI RES INST CHANGJIANG WATER RESOURCES COMMISSION

Method for simulating coupling between vehicle and traction network and power system

The invention discloses a method for simulating the coupling between a vehicle and a traction network and a power system, which comprises: firstly, combining the computation of the traction network and the computation of the tidal current of the traction network; secondly, every time a stable result is obtained by the iterative computations of the traction network and the power system, performing the electric vehicle simulation under the condition of a stable result; and finally, performing the correction computation of the traction network and the power system by using the result of the simulation of the electric vehicle till the electric vehicle, the traction network and the power system all reach a stable state. Compared with the conventional traction network computation method, the method for simulating the coupling between the vehicle and traction network and the power system of the invention has the advantages that: the influences of the vehicle and the power system on the traction network are taken into full consideration; on the premise of keeping good computation efficiency, the accuracy of the result of the computation of the traction network is improved greatly and made more in accordance with actual conditions; and the needs of railway/power related departments for traction power supply quality evaluation and electric quality estimation.
Owner:ZHEJIANG UNIV +2

Numerical simulation method for occurrence of rainfall in aircraft flight

The present invention relates to a numerical simulation method for the occurrence of rainfall in the aircraft flight. The method comprises: generating an aircraft flow field space calculation grid; determining flight conditions and rainfall conditions; solving air phase fluid aerodynamic performance data and air phase fluid wall shear stress; solving the local raindrop collection rate and the local raindrop impact mass flow on the surface of the aircraft; solving the increment of the raindrop impact coefficient; taking body-fitted grids on the airfoil surface in the aircraft flow field space calculation grid as surface water film control bodies, setting the air flow attach point, the air flow transition point and the air flow reattach point that are presented on the airfoil surface, and solving the water film thickness of all the surface water film control bodies successively; solving four parameters of the raindrop sputtering model; solving the equivalent water film surface roughness; updating the geometrical shape of the aircraft according to the water film thickness, and reconstructing the aircraft flow field space calculation grid; obtaining updated air phase fluid aerodynamic performance data; and obtaining the aerodynamic performance loss data of the aircraft caused by the rainfall.
Owner:CHINESE PEOPLES LIBERATION ARMY AVIATION COLLEGE

Steel structure fire protection design method based on fire heat release rate measurement

The invention discloses a steel structure fire protection design method based on fire heat release rate measurement. The method includes the steps of 1, determining design parameters; 2, measuring heat release rate; 3, calculating the temperature of the outer surface, which plumes rise to, of a fire protective layer of a steel structural member, to be specific, 301, correcting the heat release rate, 302, calculating the temperature of a fire source place, and 303, calculating the temperature of the outer surface of the fire protective layer of the steel structural member; 4, calculating a test section-material comprehensive coefficient; 5, calculating an actual section-material comprehensive coefficient, to be specific, calculating the actual section-material comprehensive coefficient Alpha't according to a similarity relation; and 6, determining a minimum design thickness of the fire protective layer of the steel structural member. The method has the advantages that the steps are simple, the design is reasonable, implementing is convenient, effect is good, and well solved are such problems of the existing methods of calculating thickness of the protective layer of the steel structure that the process includes many steps, calculating time is long, iteration errors are unavoidable, and the influence of an actual fire upon the fire tolerance of the steel structure is not truly reflected.
Owner:XIAN UNIV OF SCI & TECH

Future climate building multi-target energy-saving optimization method and system

The invention provides a future climate building multi-target energy-saving optimization method and system, and the method comprises the steps: generating future hourly climate data according to the obtained historical meteorological data and predicted monthly scale data; determining an optimization target and a decision variable; inputting the decision variable into the building model; importing the building model and future hourly climate data into energy consumption simulation software to obtain building energy consumption and thermal discomfort time; according to the building model, carbon emission in the whole life cycle is obtained through calculation; inputting the building energy consumption, the thermal discomfort time and the full-life-cycle carbon emission into a neural network, and fitting and outputting a target function; inputting the target function into a genetic algorithm to obtain a group of Pareto optimal solutions; and a linear weighted sum method is utilized to set weight coefficients according to requirements, and a final optimization scheme is obtained. Based on the method, the invention further provides an optimization system. According to the method, the influence of future climate change on the building performance is considered, so that the calculation result of the optimization target is more practical.
Owner:北京中建协认证中心有限公司 +1

Simulating method for electric power system

The invention discloses a simulating method for an electric power system. The simulating method comprises the following steps: establishing an electromagnetic transient model for each load in the electric power system; performing load flow calculation on the electric power system; allocating the electromagnetic transient models for all loads in the electric power system to a plurality of calculating nodes of a parallel computer and detecting whether the electric power system has disturbance; and after the disturbance occurs, performing parallel electromagnetic transient simulation on each electromagnetic transient model in the electric power system and performing electromechanical transient simulation on the electric power system at next electromechanical transient moment by utilizing an electromagnetic transient simulation result, thereby obtaining an electric quantity parameter of the electric power system after disturbance. Compared with the prior art, the simulating method provided by the invention has the advantages that the accurate electromagnetic transient model is introduced into the electromechanical transient simulation, the calculation accuracy is effectively improved,and each electromagnetic transient model is allocated into each node of the parallel computer, thereby fully utilizing the characteristics of parallel calculation, greatly promoting the calculation efficiency and efficiently promoting the calculation accuracy.
Owner:ELECTRIC POWER RES INST OF STATE GRID ZHEJIANG ELECTRIC POWER COMAPNY +1

Redundancy optimization algorithm for power distribution network comprising distributed power supply based on ordinal optimization

The invention discloses a redundancy optimization algorithm for a power distribution network comprising a distributed power supply based on ordinal optimization. The algorithm comprises the steps: carrying out the classifying of all power distribution network systems, finding a basic system in each class, and calculating the reliability of each basic system; calculating and obtaining the rough reliability through a first correction method, and carrying out the processing and screening of the rough reliability of all power distribution network systems through an ordinal optimization algorithm BP; calculating and obtaining the precise reliability through a second correction method, carrying out the screening through the ordinal optimization algorithm BP, and finally solving an optimal powerdistribution system through employing the redundancy optimization algorithm. The redundancy optimization algorithm provided by the invention firstly proposes a reliability calculation formula, givingconsideration to the line fault rate, of the power distribution network comprising the distributed power supply, and then the ordinal optimization algorithm BP is employed for the screening, thereby improving a conventional method from the aspects of time and precision, and reducing the calculation time.
Owner:ZHEJIANG UNIV

Bedrock yield contribution rate calculation method considering multi-scale cracks

PendingCN112967147ASolve the characteristicsSolve the problem of independent calculation of gas production contribution of different scale mediaData processing applicationsDesign optimisation/simulationPorosityBedrock
The invention discloses a bedrock yield contribution rate calculation method considering multi-scale cracks. The bedrock yield contribution rate calculation method comprises the following steps: collecting crack information of a rock core scale, establishing a digital rock core under the rock core scale, performing flow simulation based on the digital rock core, and obtaining porosity, equivalent permeability and shape factors under the rock core scale; collecting crack information of a logging scale, establishing a bed rock block model under the logging scale, supplementing a source item of which the fluid channeling rate is qm to a matrix, and obtaining porosity, equivalent permeability and a shape factor under the logging scale based on the bed rock block model; and acquiring crack information of gas well scales, establishing a gas well control range model, supplementing a source item with the fluid channeling quantity of qn for a matrix, and calculating the yield Q of a gas well through finite element flow simulation, so as to calculate the gas production contribution rate of the crack under each scale. According to the method, the gas production contribution rate of the fractures under all levels of scales can be obtained, and a theoretical basis is provided for guiding development of fractured gas reservoirs.
Owner:中海石油(中国)有限公司海南分公司

Method for simulating coupling between vehicle and traction network and power system

The invention discloses a method for simulating the coupling between a vehicle and a traction network and a power system, which comprises: firstly, combining the computation of the traction network and the computation of the tidal current of the traction network; secondly, every time a stable result is obtained by the iterative computations of the traction network and the power system, performingthe electric vehicle simulation under the condition of a stable result; and finally, performing the correction computation of the traction network and the power system by using the result of the simulation of the electric vehicle till the electric vehicle, the traction network and the power system all reach a stable state. Compared with the conventional traction network computation method, the method for simulating the coupling between the vehicle and traction network and the power system of the invention has the advantages that: the influences of the vehicle and the power system on the traction network are taken into full consideration; on the premise of keeping good computation efficiency, the accuracy of the result of the computation of the traction network is improved greatly and mademore in accordance with actual conditions; and the needs of railway / power related departments for traction power supply quality evaluation and electric quality estimation.
Owner:ZHEJIANG UNIV +2

On-line monitoring, identification and early warning method of mountain torrent disaster and its early warning system

The invention discloses a mountain torrent disaster on-line monitoring and identification early warning method. The method includes the following steps that: a data acquisition subsystem acquires data at a site: an automatic rainfall monitoring station acquires and processes disaster field rainfall information and transmits the information to the system platform of an early warning index analysis model through a wireless mode and / or a wired transmission mode, a water level and / or mud level monitoring station acquires and processes field debris flow and water level information and transmits the information to the system platform of the early warning index analysis model through a wireless mode and / or a wired transmission mode, and a video monitoring station acquires and processes disaster field image information and transmits the information to the system platform of the early warning index analysis model through a wireless mode and / or a wired transmission mode; an identification early warning subsystem performs early warning judgment and issues internal early warnings; personnel are determined, and formal early warnings are issued; real-time monitoring is performed; and information query is performed. The method has the advantages of rapid identification and predictive early warning, and can assist in avoiding loss. The invention also discloses an early warning system using the mountain torrent disaster on-line monitoring and identification early warning method.
Owner:CHANGJIANG RIVER SCI RES INST CHANGJIANG WATER RESOURCES COMMISSION

Design method for fire protection of steel structures based on measurement of fire heat release rate

The invention discloses a steel structure fire protection design method based on fire heat release rate measurement, comprising steps: 1. Determination of design parameters; 2. Measurement of heat release rate; Calculation of surface temperature: 301. Correction of heat release rate; 302. Calculation of temperature at fire source; 303. Calculation of outer surface temperature of fire protection layer of steel structural members; 4. Calculation of comprehensive coefficient of test section-material; 5. Actual section-material Calculation of comprehensive coefficient: Calculate the actual cross-section-material comprehensive coefficient α′t according to the similarity relationship; 6. Determine the minimum thickness of the steel structure fire protection layer design. The method of the invention has simple steps, reasonable design, convenient implementation and good use effect, and can solve the problem of many calculation steps and long calculation time in the existing calculation method of the protective layer thickness of steel structures, which inevitably produces iteration errors and cannot truly reflect the impact of actual fires. The impact of steel structure fire resistance and other issues.
Owner:XIAN UNIV OF SCI & TECH

A multi-objective energy-saving optimization method and system for future climate buildings

The invention provides a multi-objective energy-saving optimization method and system for future climate buildings. The method includes: generating future hourly climate data according to acquired historical meteorological data and predicted monthly scale data; determining optimization objectives and decision variables; Input into the building model; import the building model and future hourly climate data into the energy consumption simulation software to obtain building energy consumption and thermal discomfort time; calculate the full life cycle carbon emissions according to the building model; The comfort time and the carbon emissions in the whole life cycle are input into the neural network, and the output objective function is fitted; the objective function is input into the genetic algorithm to obtain a set of Pareto optimal solutions; the linear weighted sum method is used to set the weight coefficient according to the demand , to get the final optimization scheme. Based on this method, an optimization system is also proposed. The present invention considers the influence of future climate change on building performance, so that the calculation result of the optimization target is more realistic.
Owner:北京中建协认证中心有限公司 +1

Oxidation ditch denitrification nitrogen removal control system

The invention discloses an oxidation ditch denitrification nitrogen removal control system which is characterized in that a partition wall is additionally arranged at the position where a front denitrification area is communicated with an aerobic area to block water flow, and the front denitrification area is communicated with the aerobic area through a pre-buried flow guide pipe at the bottom ofa pool; a water inlet pipeline is led into the front denitrification area, a carbon source adding device is further arranged beside the water inlet pipeline, a water outlet pipeline is led out from awater outlet of the oxidation ditch located in the aerobic area, and a propeller pump is additionally arranged on the partition wall; and three factors of dissolved oxygen DO, nitrate concentration and carbon source concentration of the oxidation ditch are adjusted through four closed loops so as to facilitate linkage control. According to the oxidation ditch nitrogen removal control system, the denitrification nitrogen removal treatment effect can be effectively guaranteed under the condition of sufficient carbon sources by controlling the dissolved oxygen of the internal reflux mixed liquidand the reflux quantity of the internal reflux mixed liquid in the oxidation ditch.
Owner:HENAN TONGSHENG ENVIRONMENTAL ENG CO LTD

A Redundancy Optimization Algorithm Based on Sequence Optimization for Distribution Networks with Distributed Generation

The invention discloses a redundancy optimization algorithm for a power distribution network comprising a distributed power supply based on ordinal optimization. The algorithm comprises the steps: carrying out the classifying of all power distribution network systems, finding a basic system in each class, and calculating the reliability of each basic system; calculating and obtaining the rough reliability through a first correction method, and carrying out the processing and screening of the rough reliability of all power distribution network systems through an ordinal optimization algorithm BP; calculating and obtaining the precise reliability through a second correction method, carrying out the screening through the ordinal optimization algorithm BP, and finally solving an optimal powerdistribution system through employing the redundancy optimization algorithm. The redundancy optimization algorithm provided by the invention firstly proposes a reliability calculation formula, givingconsideration to the line fault rate, of the power distribution network comprising the distributed power supply, and then the ordinal optimization algorithm BP is employed for the screening, thereby improving a conventional method from the aspects of time and precision, and reducing the calculation time.
Owner:ZHEJIANG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products