The invention relates to a deep-valley large-span bridge suspension pouring construction
safety risk dynamic assessment method. The method comprises the following steps: S1, constructing a suspension pouring construction stage subjective and objective fusion analysis
database; s2, preliminarily establishing a
Bayesian network model, a
network structure and network parameters, and carrying out adaptability optimization during target bridge
risk assessment; s3, constructing a
Bayesian network model adaptability module; s4, constructing a
dynamic assessment guidance-time module, and establishing a risk
dynamic assessment model without evidence guidance; s5, constructing a dynamic assessment guidance-evidence module, and establishing a risk dynamic assessment model with evidence guidance; according to the method, comprehensive safety evaluation of comprehensively considering the risk
occurrence probability and the risk loss is realized, and the objectivity of safety evaluation is ensured; according to the method, the dynamic assessment of the risk is realized, so that the security
risk assessment process is closely combined with the actual site construction, the reliability and accuracy of the assessment result are ensured, and finally a management basis is provided for a
decision maker through a highly visual result.