The invention relates to the technical field of production scheduling, and discloses a production scheduling
visualization method based on
big data. According to the method, multi-dimensional production data such as equipment real-time states, material inventory, personnel skills and order delivery periods are collected, and a four-dimensional dynamic constraint model is generated through a dynamic constraint modeling
algorithm; and obtaining an initial scheduling scheme by using a mixed
integer programming and improved
genetic algorithm dual-drive optimization engine, inputting the initial scheduling scheme into a
visual interaction module, displaying a result by using a drag-and-drop
Gantt chart, and detecting resource conflicts in real time. The feasibility of the adjusted scheduling scheme is verified through a dynamic re-
calculation algorithm, and then the model is updated. According to the method, multi-dimensional data are integrated, production scheduling optimization and
visualization are realized, production resource conflicts can be effectively solved, the production efficiency is improved, the cost is reduced, and an efficient solution is provided for enterprise production management.