The invention relates to a well completion method of an in-situ leaching
uranium mining technological well used in the
well drilling and completion of a
reagent-free in-situ leaching
uranium mining technological well, comprising the steps: a casing of the
uranium mining technological well is made by tubes of PVC materials, the tubes are connected by screw threads and uniformly coated with PVC glue for guaranteeing sealing and preventing from stringing together; and a PVC ring-shaped skeleton
sieve tube is adopted, iron rings are arranged at the upper and lower ends of the
sieve tube so that the positions of the
sieve tube and an ore
bed are conveniently measured, errors are easily adjusted and the sieve tube is ensured to be put in place accurately. A
cement plug is injected at the bottom of a sand
sediment tube so as to prevent a cone at the bottom of the sand
sediment tube from being damaged when a
metal tube is put in. When the well completion operation of the
uranium mining technological well is carried out by the method, a gravel packing segment and a sand
sediment segment are arranged at the bottom of the casing, the ring-shaped skeleton sieve tube is put in from the upper end of the casing, and iron rings are arranged at the upper end and the lower end of the casing. A
well cementing segment, a gel-
cement paste sealing segment and a
cement gel sealing segment are arranged between the casing and the wall the well. The well completion method solves the problem that a
wetted area can not be guaranteed as a result of the malposition of the sieve tube and the ore
bed and the layer crossing of ore
bed water. The method can be widely used for
well drilling and completion operation of the
reagent-free in-situ leaching
uranium mining technological well.