The invention relates to the technical field of motor overhauling, in particular to a large motor disassembling, hoisting and overhauling method. The method comprises the following steps: firstly, preparing technical data and standard tools, then sequentially measuring and recording a gap between bearing bushes of an upper roller motor and a lower roller motor, dismantling shielding structures such as a middle connecting shaft, a platform walking board and an A-shaped frame, dismantling accessory parts of the lower roller motor and marking relative positions, and after measuring an air gap between a
stator and a rotor, completing the operation of the upper roller motor and the lower roller motor. The
stator and the rotor are safely decomposed and purged and checked in a manner of cooperative lifting of two 75-
ton cranes and leveling of a chain block, and finally, the shim is adjusted according to
original data after reverse-sequence reinstallation, so that debugging and test running are completed. According to the method, the
heavy load problem is solved through double-
machine cooperative hoisting, precise
assembly is achieved through the processes of measurement, recording, application and adjustment, gap deviation and contact damage are avoided, the overhaul safety, stability and efficiency are improved, and the method is suitable for industrial field overhaul of the large-scale heavy-load motor.