Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

39results about How to "Dense connection" patented technology

Steel plate composite beam bridge support-free cast-in-place concrete device and construction method

The invention discloses a steel plate composite beam bridge support-free cast-in-place concrete device and a construction method. The steel plate composite beam bridge support-free cast-in-place concrete device comprises profiled steel sheets, steel beams, steel reinforcement frameworks and shear connectors. The shear connectors are arranged on the upper flanges of the steel beams, the two sides of the upper flanges of the steel beams are each connected with a profiled steel sheet, and a plurality of steel bar frameworks are arranged on each profiled steel sheet. When the device is used for cast-in-place construction of the concrete bridge deck slab, a bracket is not required to be erected; the bearing capacity of the bridge deck slab is improved by the upper steel reinforcement frameworks; the profiled steel sheets at the bottom are used as a formwork, the bottom concrete is prevented from being subjected to slurry leakage, pitted surfaces, falling and other diseases, threats to pedestrians or vehicles passing under the bridge are avoided, meanwhile, the economical efficiency is good, construction is convenient and fast, the construction efficiency is remarkably improved, the construction cost is saved, and civilized construction and safe construction are convenient to achieve.
Owner:CHANGAN UNIV

Manufacturing method of waterproof shoes capable of protecting toes

The invention discloses a manufacturing method of waterproof shoes capable of protecting the toes. The manufacturing method comprises the steps of manufacturing shoe shells, wherein the shoe shells are subjected to first drying treatment after the inner surfaces of the shoe shells are coated with cold adhesive; manufacturing sock bottoms and the sock body parts, and splicing the sock bottoms and the sock body parts into socks; conducting second drying treatment on the socks; blindly stitching the junctions of the sock bottoms and all the sock body parts; inserting shoe trees into lining of thesocks; conducting third drying treatment on the socks after the outer surfaces of the socks are coated with cold adhesive; conducting fourth drying treatment on insoles after the surfaces of the prepared insoles are coated with cold adhesive; placing the insoles in the shoe shells and above shoe soles, and inserting the socks with the shoe trees into the shoe shells to make the insoles located between the shoe soles and the sock bottoms; heating the shoe shells, the insoles and the socks with the shoe trees which are placed together in a set heating environment and afterwards, taking out theshoe shells, the insoles and the socks, pressurizing the surfaces of the shoe shells, and taking out the shoe trees. By means of the manufacturing method of the waterproof shoes, the waterproof shoeswhich have good waterproof performance and are stable in structure and comfortable to wear can be manufactured.
Owner:广州市步坤实业有限公司

Lengthening joint containing prefabricated concrete-filled steel tube core column component and construction method of lengthening joint

The invention discloses a lengthening joint containing a prefabricated concrete-filled steel tube core column component and a construction method of the lengthening joint. The lengthening joint comprises an upper-section core column, a lower-section core column, a steel reinforcement framework, a joint concrete layer and out-of-tube concrete layers. The bottom end of the upper-section core columnis connected with an upper flange plate, the top end of the lower-section core column is connected with a lower flange plate, a connecting assembly comprises a connecting plate, bonding glue layers and high-strength bolts, the connecting plate is arranged between the upper flange plate and the lower flange plate, air holes are formed in the middle of the plate face of the connecting plate at intervals, the bonding glue layers are arranged between the connecting plate and the upper flange plate and between the connecting plate and the lower flange plate, and the upper-section core column and the lower-section core column are connected through the high-strength bolts; and the steel reinforcement framework is arranged around joints of the upper-section core column and the lower-section core column, and the joint concrete layer is poured between the out-of-pipe concrete layer on the outer side of the upper-section core column and the out-of-pipe concrete layer on the outer side of the lower-section core column. The technical problems that the thickness of an existing joint cannot be adjusted, inclination deviation exists, compression deformation is large, force transmission is not reliable, construction efficiency is low, and concrete in a steel pipe is difficult to pour are solved.
Owner:CHINA AVIATION PLANNING & DESIGN INST GRP

Vertical seam choke plug

A vertical seam choke plug comprises a raised top part, an extended part, a skirt part and a skirt edge, wherein the raised top part comprises a first side face and a second side face which are disposed vertically and mutually at an interval, and opposite top edges of the first side face and the second side face and one side edge are mutually connected in order to let the top end of the raised top part and one side end form sealing space; the extended part is extended to a direction remote from and perpendicular to the raised top part along bottom edges of the first side face and the second side face and the bottom edge of a sealed side end of the raised top part; the top part of the skirt part is connected to the edge of the extended part remote from the raised to part and is extended for a distance in a direction remote from the raised top part to reach the bottom part of the skirt part, and perimeter of the bottom part of the skirt part exceeds the perimeter of the top part of the skirt part; and the skirt edge is connected to the bottom part of the skirt part and is lengthened in a direction parallel to the extended part and remote from the raised top part. The vertical seam choke plug provided by the invention solves the problem that a hidden danger of water leakage exists at an intersection part between a metal roofing board opened base and a metal roofing board slab rib on an upstream face and a downstream face when a traditional structure is used.
Owner:DUOWEI UNION GRP

Environmental-protection multi-functional composite plate material and processing equipment for composite plate material

The invention discloses an environmental-protection multi-functional composite plate material and processing equipment for the composite plate material. The environmental-protection multi-functional composite plate material comprises a polythene base layer plate, the two side walls of the polythene base layer plate are provided with a first bamboo charcoal plate and a second bamboo charcoal platecorrespondingly, the outer side walls of the first bamboo charcoal plate and the second bamboo charcoal plate are provided with a second log base plate and a first log base plate correspondingly, andthe side walls of the first bamboo charcoal plate and the second bamboo charcoal plate are both provided with a plurality of sets of insert grooves in clamping connection with clamping connection columns. The environmental-protection multi-functional composite plate material is environmentally friendly and has good anti-collision and noise reduction effects, the composite plate material is high inoverall hardness, and the processing equipment is adopted to process the plate material, plate material cut mouths are made to keep smooth, the fit rate of multiple sets of the plate materials in later-period coordination use is effectively increased, gaps between the plate materials are reduced, furthermore, damage caused to the composite plate material in plate material processing positioning is effectively avoided, and the quality of the composite plate material is guaranteed.
Owner:安徽群升建筑工程有限公司

Reinforced concrete artificial pillar construction method

ActiveCN114109458AHighly precise controlPrecise control of construction heightProps/chocksReinforced concreteArchitectural engineering
The invention discloses a reinforced concrete artificial ore pillar construction method which comprises the following steps: accurately and equally dividing the height of a goaf, prefabricating unit bodies according to the equally-divided height, assembling the prefabricating unit bodies in a top-down inverted manner, and fixing the prefabricating unit bodies which are in top contact with a goaf top plate through anchor cable components. The next prefabricated unit body adjacent to the roof-contacted prefabricated unit body is detachably connected with the lower end of the anchor cable component through a connecting rod component, the subsequent prefabricated unit bodies are sequentially connected with the previous prefabricated unit body through connecting rod components, and the last prefabricated unit body is embedded between the prefabricated unit body above the last prefabricated unit body and a goaf bottom plate. The prefabricated unit bodies are firmly connected to the lower portion of the top plate through the anchor cables and the connecting rods, the top plate is forced to sink to a certain degree under the action of gravity and tension to compress installation gaps between the prefabricated unit bodies, and the artificial pillars are completely connected into a whole. The method is of great significance in improving the stability of the goaf, converting artificial pillars into original pillars to reduce resource loss and ensuring safe mining of mines.
Owner:CHINA MINMETALS CHANGSHA MINING RES INST +1

Constructional column top pouring construction method

ActiveCN106285005AWill not change the construction processDense connectionBuilding material handlingRebarConcrete beams
The invention belongs to the technical field of constructional column construction for buildings and particularly relates to a constructional column top pouring construction method. To make the top of a constructional column be tightly connected with the bottom of a beam and sufficiently play the aseismic effect of the constructional column, the constructional column top pouring construction method is provided. The construction method comprises the steps that after concrete beam and slab steel bars and formworks are installed and before concrete is poured, galvanized steel pipes communicating with the top end of the constructional column are embedded in a positioned mode, and when concrete of the constructional column is poured till the bottom of a concrete beam cannot be compactly filled, pouring is conducted through the embedded galvanized steel pipes. The effect that the top of the constructional column is tightly connected with the bottom of the beam is guaranteed, the construction quality of an infilled wall is improved, and original constructional column construction technique procedures are not changed. The number of the embedded galvanized steel pipes is no less than two, one embedded steel pipe can serve as an ichor pipe while pouring, and the effect that the top is sufficiently poured is guaranteed.
Owner:CHINA SHANXI SIJIAN GRP

Sandwich panel socket joint strip and its application node structure

The invention discloses a laminboard socket rubber strip and an application node structure thereof. The laminboard socket rubber strip comprises a fixing part, a bending part and a filling part, wherein the fixing part is used for arranging screws in series and fixing the laminboard socket rubber strip at an end of a lower laminboard of a laminboard wall; the bending part comprises a first bending section and a second bending section, a first end of the first bending section is connected with an end of the fixing part, and the first bending section is perpendicular to the fixing part; a first end of the second bending section is connected to a second end of the first bending section, a second end of the second bending section extends for a certain distance in a direction far from the fixing part, and the second bending section is perpendicular to the first bending section; the filling part is connected to the second end of the second bending section and is perpendicular to the first bending section; side surfaces, close to the fixing part, of the filling part and the second bending section are located in the same plane, and the size of the filling part in the axial direction of the first bending section is larger than that of the second bending section in the axial direction of the first bending section.
Owner:DUOWEI UNION GRP

A class of large particle sodium ion battery positive electrode material and method for increasing material particle size

The invention discloses a class of large-grain sodium-ion battery cathode materials and a method for increasing the particle size of the materials, belonging to the technical field of energy materials. The large particle sodium ion battery positive electrode material (Na m A 1‑x B x o 2 , 0.05≤x≤0.25) It is prepared by pre-mixing, tableting, and high-temperature calcination. by Na m AO 2 The metal element B whose oxide melting point is close to the calcination temperature is added, and the melting of the material is used to make the material bond with a larger particle size, which improves the volumetric energy density and electrochemical performance of the material. The method is simple and easy to operate, has abundant raw materials and low price, and is easy to realize large-scale production. The anode material for a sodium ion battery provided by the present invention has a relatively large particle size and excellent electrochemical performance, so the anode material for a sodium ion battery of the present invention can be used as a novel high-volume energy density storage material with simple synthesis and suitable for large-scale production. energy materials with broad application prospects.
Owner:FUJIAN NORMAL UNIV

Construction Method of Grouting at the Top of Structural Column

ActiveCN106285005BWill not change the construction processDense connectionBuilding material handlingConcrete beamsArchitectural engineering
The invention belongs to the technical field of constructional column construction for buildings and particularly relates to a constructional column top pouring construction method. To make the top of a constructional column be tightly connected with the bottom of a beam and sufficiently play the aseismic effect of the constructional column, the constructional column top pouring construction method is provided. The construction method comprises the steps that after concrete beam and slab steel bars and formworks are installed and before concrete is poured, galvanized steel pipes communicating with the top end of the constructional column are embedded in a positioned mode, and when concrete of the constructional column is poured till the bottom of a concrete beam cannot be compactly filled, pouring is conducted through the embedded galvanized steel pipes. The effect that the top of the constructional column is tightly connected with the bottom of the beam is guaranteed, the construction quality of an infilled wall is improved, and original constructional column construction technique procedures are not changed. The number of the embedded galvanized steel pipes is no less than two, one embedded steel pipe can serve as an ichor pipe while pouring, and the effect that the top is sufficiently poured is guaranteed.
Owner:CHINA SHANXI SIJIAN GRP

A kind of reinforced concrete artificial mine pillar construction method

ActiveCN114109458BHighly precise controlPrecise control of construction heightProps/chocksReinforced concreteArchitectural engineering
The invention discloses a method for constructing a reinforced concrete artificial ore pillar. The height of the goaf is precisely divided into equal parts, the unit bodies are prefabricated according to the equal heights, and the prefabricated unit bodies are assembled in a top-down manner, and the gob is assembled with the gob height. The prefabricated unit body connected to the roof is fixed by the anchor cable member, the next prefabricated unit body adjacent to the top-connected prefabricated unit body is detachably connected to the lower end of the anchor cable member through the connecting rod member, and the subsequent prefabricated unit body is sequentially connected with the previous prefabricated unit body. The unit bodies are connected by connecting rod members, and the last prefabricated unit body is embedded between the prefabricated unit body above it and the bottom plate of the goaf. The prefabricated unit body is firmly connected to the bottom of the roof by using the anchor cable and the connecting rod, and the roof plate is forced to sink to a certain extent by the action of gravity and tension to compress the installation gap between the prefabricated unit bodies, so that the artificial ore pillars are completely connected as a whole. It is of great significance to improve the stability of the goaf, convert the primary ore pillar to the artificial ore pillar to reduce the loss of resources, and ensure the safe mining of the mine.
Owner:CHINA MINMETALS CHANGSHA MINING RES INST +1

A kind of extension joint and construction method of prefabricated steel tube concrete core column member

An extension node containing a prefabricated concrete-filled steel tube core column member and a construction method thereof, comprising an upper section core column, a lower section core column, a steel skeleton, a node concrete layer and an outer tube concrete layer; the bottom end of the upper section core column is connected with a the upper flange; the top of the lower core column is connected with a lower flange; the connecting component includes a connecting plate, an adhesive layer and high-strength bolts; the connecting plate is arranged between the upper flange and the lower flange; the connecting plate There are air holes spaced in the middle of the plate surface; the adhesive layer is respectively arranged between the connecting plate and the upper flange and the lower flange; high-strength bolts connect the upper and lower core columns; The node concrete layer is poured between the outer tube concrete layer outside the upper section core column and the outer tube concrete layer outside the lower section core column. The invention solves the technical problems that the existing nodes cannot adjust the thickness of the nodes, the inclination deviation, the large compression deformation, the unreliable force transmission, the low construction efficiency and the difficulty of concrete pouring in the steel tube.
Owner:CHINA AVIATION PLANNING & DESIGN INST GRP

Laminboard socket rubber strip and application node structure thereof

The invention discloses a laminboard socket rubber strip and an application node structure thereof. The laminboard socket rubber strip comprises a fixing part, a bending part and a filling part, wherein the fixing part is used for arranging screws in series and fixing the laminboard socket rubber strip at an end of a lower laminboard of a laminboard wall; the bending part comprises a first bending section and a second bending section, a first end of the first bending section is connected with an end of the fixing part, and the first bending section is perpendicular to the fixing part; a first end of the second bending section is connected to a second end of the first bending section, a second end of the second bending section extends for a certain distance in a direction far from the fixing part, and the second bending section is perpendicular to the first bending section; the filling part is connected to the second end of the second bending section and is perpendicular to the first bending section; side surfaces, close to the fixing part, of the filling part and the second bending section are located in the same plane, and the size of the filling part in the axial direction of the first bending section is larger than that of the second bending section in the axial direction of the first bending section.
Owner:DUOWEI UNION GRP

Construction method for anti-floating beam of subway station

The invention belongs to the field of metro station structure construction, and particularly relates to a metro station anti-floating beam construction method which is used for pouring an anti-floating beam in a space below a top beam on a station top plate and preventing a station main body structure from integrally floating due to the influence of water floating, and comprises the following steps: pre-burying two reinforcing steel bars and installing anti-floating beam reinforcing steel bars when the top beam is constructed; the method comprises the following steps: embedding three expansion bolts into a ground wall surface, mounting an anti-floating beam straight wall section formwork system, fixing a formwork by adopting an inner tie bar, erecting a vertical formwork system, mounting and fixing an over-irrigation area formwork, fixing an outer formwork system by adopting an inclined steel pipe and a steel bar, pouring anti-floating beam concrete in a layered manner, shoveling the over-irrigation area concrete, and dismounting the formwork system. The formwork structure is firm, the supporting structure is stable, and concrete pouring construction is facilitated. The method is reasonable in design and convenient to operate, the roof waterproof layer structure is not damaged, the anti-floating beam and the top beam bottom are tightly connected, and the effect is remarkable.
Owner:CHINA RAILWAY 12TH BUREAU GRP +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products