Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

53results about How to "Meet the needs of simulation" patented technology

Material and method for manufacturing carbonate cave oil reservoir physical model

The invention relates to a material and a method for manufacturing a carbonate cave oil reservoir physical model. The material is characterized by comprising a manufacturing main body material for cracks and caves in the physical model and a physical model skeleton material, wherein the manufacturing main body material for cracks and caves in the physical model is selected from wood's alloy and / or paraffin. The method comprises the following steps of: 1) manufacturing models of caves and cracks of different sizes and shapes by using the wood's alloy and / or the paraffin; and 2) after the models are formed, displacing the wood's alloy and / or the paraffin at the temperature of higher than 85 DEG C to obtain a crack cave with spatial structure. The manufactured physical model accords with the characteristics of carbonate cave oil reservoir and supplies reliable guarantee for developing various physical simulation experiments.
Owner:CHINA PETROLEUM & CHEM CORP +1

Soft tissue deformation simulation method

The method relates to a soft tissue deformation simulation method. The soft tissue deformation simulation method includes the following steps: a biomechanics model of soft tissue is built, and mass points in the biomechanics model are initialized; force feedback equipment exerts action force on the soft tissue to carry out collision detection; motion state information is calculated in an improved Euler algorithm; the state of each time step of the model is output to a display screen, and the deformation process of the soft tissue is displayed in a dynamic mode; feedback force is calculated, and touch feedback is output. By means of the steps, real-time performance, precision and smoothness of the feedback force in virtual operation simulation can be effectively achieved, precision and real-time performance of soft tissue deformation simulation are improved, and accordingly requirements of virtual operation simulation are met.
Owner:NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER

Method for accelerating lattice-Boltzmann by utilizing graphic processing units (GPUs)

The invention provides a method for accelerating a lattice-Boltzmann by utilizing graphic processing units (GPUs), and relates to a GPU at a host port and a GPU at an equipment port. The method comprises the steps that the host port gives parameters such as computational domains, the reference length, the freestream velocity, the density, reynolds numbers and the like according to physical problems, and divides thread numbers of a design kernel according to a grid; and the equipment host calculates equilibrium state distribution functions of all lattice points in each direction through the macroscopic parameters (the density, the speed, the reynolds numbers, the viscosity coefficient, and the like), uses the equilibrium state distribution functions as initial fields of the calculation, parallelly solves a discrete equation and processes boundaries, and returns a result finally obtained through iteration to the host port. According to the method, the migration and the collision in the lattice-Boltzmann method are calculated by utilizing the rapid calculation characteristic of the GPU at the equipment port, and the iteration process of the lattice-Boltzmann method is accelerated through coordination operation of the GPU at the host port and the GPU at the equipment port.
Owner:LANGCHAO ELECTRONIC INFORMATION IND CO LTD

Experimental platform and experimental method supporting protocol-independent packet processing

The embodiment of the invention provides an experimental platform and experimental method supporting protocol-independent packet processing. The experimental platform supporting the protocol-independent packet processing comprises a control module, a compiler module, a sending module, a switch group, a receiving module, a data processing module and a GUI module. Through the experimental platform and experimental method supporting the protocol-independent packet processing provided by the embodiment of the invention, when a user needs to perform a simulation experiment, the configuration instruction information written in advance and the switch processing logic information can be input into the experimental platform, so that the simulation experiment can be performed easily, therefore, therepeating and cumbersome process of configuring the experimental environment is avoided, and the need for the simulation of the processing logic written in the P4 language can be met; further, the experimental platform supporting the protocol-independent packet processing can also be used for the performance experiment of the switches supporting the protocol-independent packet processing.
Owner:BEIJING UNIV OF POSTS & TELECOMM

Horizontal swing plate type internal wave generation device

The invention aims to provide a horizontal swing plate type internal wave generation device. The horizontal swing plate type internal wave generation device comprises a wave generation mechanism, a control and measurement system and a machine base. The wave generation mechanism is a horizontal swing plate type wave generation mechanism. A swing plate is placed at the junction of two layers of flowing liquid levels, is driven by a crank and rocker mechanism and can do reciprocating wave generation motion up and down at the junction of the two layers of flowing liquid levels to generate periodical internal waves. The control and measurement system provides control signals for the wave generation mechanism and feeds back the motion frequency of a motor. The wave generation mechanism and the measurement system are supported by the machine base to make the whole device integrated, and the machine base also has the wave absorbing function. Due to the adoption of the horizontal swing plate type internal wave generation device, complex wave generation motion can be carried out at the junction of the two layers of flowing liquid levels by the swing plate to generate the periodical internal waves without generating surface waves at the same time when ocean internal waves are truly simulated, and interference of surface waves in original experiments is completely eliminated. The device is simple in structure, convenient to operate, high in motion precision and low in energy consumption and has good application and market value.
Owner:HARBIN ENG UNIV

Parallel acceleration method and system of lattice Boltzmann method

The invention discloses a parallel acceleration method and a system of a lattice Boltzmann method (LBM), which overcome the defect that an X86 server cluster is higher in consumption of time and the like for LBM treatment at present. The method comprises the steps that a CPU (Central Processing Unit) end determines macro parameters and initial values of the macro parameters of all lattice points of a grid, defines a data structure and a storage mode for storing equilibrium distribution functions of all the lattice points in all directions and the macro parameters of all the lattice points, computes the equilibrium distribution functions of all the lattice points in all the directions according to the macro parameters, and sets thread execution configuration of an inner core of an MIC (Many Integrated Core) card; an MIC end conducts parallel computation of migration and impact and parallel boundary processing according to the macro parameters, the initial values of the macro parameters, the thread execution configuration and the equilibrium distribution functions of all the lattice points of the grid in all the directions, and obtains a convergence status according to the equilibrium distribution functions of all the lattice points of the grid in all the directions. With the adoption of the method and the system, the processing property of the lattice Boltzmann method is improved, and the demand of fluid simulation is satisfied.
Owner:INSPUR BEIJING ELECTRONICS INFORMATION IND

Satellite data receiving simulation analysis platform

A satellite data receiving simulation analysis platform comprises a component development module, a model assembly module, a scenario edition module, a management control module, a simulation running engine, a two-dimensional scene module, a three-dimensional vision module, a service flow show module, a transmission link analysis module and an analysis and evaluation module. According to the satellite data receiving simulation analysis platform, the working condition of a satellite data receiving and transmission task can be simulated, simulation deduction and multidimensional show can be performed on the receiving process according to time, the task and resources, the specific use conditions of all devices of a ground station and the interactive relationship between the devices and other external systems can be shown, and analysis validation can be performed on the feasibility of a dispatching planning scheme according to resource capacity and constraint conditions. All entity models in a ground receiving system are built based on modularization, so that the purposes of model reuse and model data separation are achieved, and the expansibility and adaptability of the simulation analysis platform are improved; meanwhile, a multithreading discrete event is adopted for the simulation engine for driving, so that the simulation running efficiency of the platform is improved.
Owner:INST OF REMOTE SENSING & DIGITAL EARTH CHINESE ACADEMY OF SCI +1

Method for measuring large deformation flow stress curve of metal plate

The invention discloses a method for measuring a large deformation flow stress curve of a metal plate in the field of metal plate volume forming engineering, which comprises the following steps: taking the metal plate, and performing initial stretching test to acquire a real stress-strain curve; acquiring an equivalent strain interval of a subsequent rolling process; diving the equivalent strain interval into n equal parts to acquire the thickness of the plate after each theoretical rolling; taking n blocks of the metal plate, and cold-rolling and machining each block of the metal plate according to the thickness of the plate after theoretical rolling to acquire n actual thickness and then acquire each actual rolling equivalent strain; performing re-stretching test for the cold-rolled n metal plate blocks to acquire n subsequent flow stresses and n subsequent real strains; and further acquiring n data points to acquire the large deformation flow stress curve of the metal plate. The method of the invention can provide accurate material performance parameters for the numerical simulation in a plate volume forming process, and provide basis for engineering personnel to select an extrapolation model.
Owner:内蒙古中盛科技集团有限公司

Novel linear electric loading system

The invention discloses a novel linear electric loading system. The novel linear electric loading system comprises a base plate, base plate bosses, bumper block installing tables, bumper blocks, rubber blocks, guide rails, a slide platform, a connecting block, a magnetic railing ruler, drag chain installing angle iron, a force sensor, drag chains, a linear motor, a threaded connecting rod, a linear steering engine, a supporting plate and fixing screws. According to the novel linear electric loading system, aluminum alloy platforms are adopted in the linear motor, the guide rails and the like, and therefore dynamic performance of the system can be improved beneficially. Compared with a traditional loading structure that a servo motor is installed with a ball screw, the novel linear electric loading system has the advantages that the slide platform is adopted, a loading motor and the steering engine are connected through threaded rods, and the shortcomings that the traditional loading structure is long in reversed time and poor in dynamic performance are effectively overcome. Compared with a traditional connecting method using lug rings, the method of connecting the loading motor and the electric steering engine through the threaded rods avoids connecting gaps and improves loading accuracy. When the loading system breaks down, the phenomenon of rotation blocking of the steering engine can be prevented, the steering engine can not be damaged, and the effect of safety protection is achieved.
Owner:BEIHANG UNIV

Method for utilizing microwave integrated circuit (MIC) to rapidly achieve lattice Boltzmann parallel acceleration

The invention provides a method for utilizing a microwave integrated circuit (MIC) to rapidly achieve lattice Boltzmann parallel acceleration. The method comprises the steps of enabling a central processing unit (CPU) to set parameters such as a computational domain, a reference length, an inflow velocity, density and Reynolds numbers according to physical problems and design thread counts of an inner core according to nuclear numbers of an MIC card; enabling an MIC end to calculate equilibrium state distribution functions of all lattice points in various directions through the macroscopic parameters (the density, the speed, the Reynolds numbers and a coefficient of viscosity and the like) so as to enable the equilibrium state distribution functions to serve as a computational initial field, performing parallel solving of a discrete equation and a processing edge, and enabling results obtained by final iteration to be passed back to a CPU end. The characteristic of rapid calculation of an MICMIC end is utilized to participate in calculation of migration and collision in lattice-Boltzmann, and the iterative process of the lattice-Boltzmann is accelerated by coordinated operation of the CPUCPU end and the MICMIC end.
Owner:LANGCHAO ELECTRONIC INFORMATION IND CO LTD

Integrated lane changing behavior simulation method oriented towards vehicle animation simulation

InactiveCN104282033AMeet the needs of animation simulationMeet the needs of simulationAnimation3D modellingTransverse axisAnimation
The invention discloses an integrated lane changing behavior simulation method oriented towards vehicle animation simulation. The method includes the coordinate system building step, wherein a lane changing track of a vehicle to change a lane is built on the basis of a moving coordinate system, the current position of the vehicle to change the lane serves as the origin of the moving coordinate system, the transverse axis of the moving coordinate system is in the lane line direction of the vehicle to change the lane, and the longitudinal axis of the moving coordinate system is in the direction perpendicular to the transverse axis; the lane changing track describing step, wherein the offsets of the lane changing track in the transverse axis and the longitudinal axis are described respectively on the basis of the moving coordinate system; the track restraint step, wherein a restraint condition is formed on the basis of influence on the lane changing track from multiple influence factors; the track obtaining step, wherein the lane changing track is restrained on the basis of the constraint condition, and the final lane changing track of the vehicle is obtained.
Owner:INST OF COMPUTING TECH CHINESE ACAD OF SCI

Large eddy simulation system and method for realizing cooperative computing based on latticed-Boltzmann theory

The invention discloses a large eddy simulation system and a large eddy simulation method for realizing cooperative computing based on a latticed-Boltzmann theory. The system adopts the technical scheme that a master process module broadcasts input data to other process modules in the system and outputs calculation results of all nodes after all the MIC (many integrated core) process modules and all the CPU (central processing unit) process modules finish all computing tasks; the MIC process modules unload the input data to corresponding MICs for computing and perform data communication with the MIC process modules or CPU process modules of the adjacent nodes, and then the next iteration is executed; the CPU process modules control the cooperative computing of the node and start a corresponding thread for each CPU kernel according to the number of kernels of CPUs so as to compute part of distributed data; meanwhile, data communication with the MIC process modules or CPU process modules of the adjacent nodes is executed, and the next iteration is executed. The large eddy simulation system and the large eddy simulation method implement cooperative computing under multiple nodes by using the advantage of reducing the power consumption of the CPUs and the MICs, so that implementation is simple, and the cost is low.
Owner:INSPUR BEIJING ELECTRONICS INFORMATION IND

Beidou B1 frequency point intermediate frequency signal simulation method

The invention discloses a Beidou B1 frequency point intermediate frequency signal simulation method. A simulation system mainly realizes the satellite signal simulation with in the arbitrarily given simulation time, the arbitrarily given simulated flight track and the arbitrarily given carrier-to-noise ratio. According to the method, the satellite signal transmission delay in the flight track is obtained through carrier flight track and satellite ephemeris resolving, through the delay and the influence of an ionized layer and a convection layer on the delay, ranging codes, navigation messages and carrier waves of corresponding satellites are generated, signals of the multiple satellites are synthesized into one path of signals, then, noise is added, and in addition, filtering, quantization and signal storage are carried out. The influence of the transmission delay calculation quantity on the consumed simulation time is considered, the flight track delay with the period being 0.2ms is calculated in advance, the transmission delay of each sampling point is calculated through interpolation, the precision is ensured, meanwhile, the data storage is greatly saved, and the simulation efficiency is improved.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Epidemic situation deduction simulation system and method

The invention provides an epidemic situation deduction simulation system and method. The system comprises: a user interface module configured to receive an external input; a control module configuredto control behaviors described in a preset simulation logic program based on the external input; a simulation module configured to run a preset simulation logic program in response to the control of the control module; and an optimization module configured to perform optimization learning on the value of the learnable parameter based on the simulation result data output by the simulation module. The preset simulation logic program describes the state in epidemic situation development and the behavior of driving the change of the state in epidemic situation development in a code form; when theexternal input includes a learnable parameter, the control module acquires an optimization value of the learnable parameter from an optimization module and performs a step of controlling the behaviordescribed in the preset simulation logic program based on the external input by taking the optimization value as a value of the learnable parameter.
Owner:THE FOURTH PARADIGM BEIJING TECH CO LTD

Method for avoiding obstacles based on blocking corners in pedestrian simulation

InactiveCN101826122ASimplify modeling workAlgorithm with few parametersSpecial data processing applicationsTraffic simulationComputer science
The invention relates to a method for simulating traffic behaviors of pedestrians in the technical field of traffic simulation, and discloses a method for avoiding obstacles based on blocking corners in the pedestrian simulation. The blocking corners of the obstacles generated on the current pedestrians are established after all static obstacles and other pedestrians are scanned in the collision avoiding range; and if the target direction of the current pedestrian is not comprised by any blocking corner, the pedestrian walks along the direction, otherwise, the pedestrian needs to pass round a blocking area formed by the blocking corners in the target direction. The method provides the concept of the blocking corners; the blocking corners of the obstacles on the current pedestrian are established, and further the blocking area round which the pedestrian needs to move is determined; meanwhile, a path of moving round the static obstacles and the pedestrians in the same direction is selected according to the shortest path principle and the collision with the pedestrians in the opposite directions is avoided by reducing the priority of one side of each blocking corner. No complex parameter calibration is needed in the process; and the collision avoiding range and the moving-round rule can be freely set. Therefore, the needs of different simulation with different purposes are met.
Owner:JILIN UNIV

Mechanical multi-frame RF/infrared composite interference semi-physical simulation system

A mechanical multi-frame RF / infrared composite interference semi-physical simulation system includes a microwave anechoic chamber, a three-axle table, a table control system, a RF interference simulator, an infrared interference simulator, a mechanical multi-frame moving system, a servo system, and an integral real-time simulation control system. The three-axle table, the table control system, the RF interference simulator, the infrared interference simulator, and the mechanical multi-frame moving system are arranged inside the microwave anechoic chamber, and the integral real-time simulation control system is arranged outside the microwave anechoic chamber. The RF interference simulator and the infrared interference simulator are mounted on a moving platform of the mechanical multi-frame moving system. The integral real-time simulation control system is composed of a multi-node real-time computer network including a master control computer, an acquisition computer, a RF interference control system, an infrared interference control system, a real-time communication network, a simulative master control system and a monitoring system. The real-time communication network is built up by the utilization of reflective memory networking, and information transmission and real-time control among devices of the simulation system are realized.
Owner:SHANGHAI INST OF ELECTROMECHANICAL ENG

Method for designing micro/nano-scale nonstandard product structure

InactiveCN101706835AOvercoming Simulation Challenges of Combinatorial ModelingMeet the needs of multi-granularity simulationSpecial data processing applicationsMicrostructural devicesElement modelGranularity
The invention discloses a method for designing a micro / nano-scale nonstandard product structure. The method comprises the following steps: acquiring a device-level nonstandard three-dimensional structure through a two-dimensional layout of the nonstandard structure and a definition file of a manufacturing flow; establishing a complete finite element model, and mapping, extracting and describing the integral quality, rigidity and damping matrix of a system to acquire a system-level model; selecting a mode as an analysis object, and using an initial position or a test load as an input vector so as to acquire an output vector; based on the input / output vector, acquiring a system-level coarse-grained model through Lagrange interpolation; adjusting the granularity of the model, and mapping the matrix to low-dimensional space till the residual error meets the precision requirement so as to acquire a compact numerical value macro model; and after the design object meets the requirement, exporting layout information, and finishing the nonstandard product design. The method expands the design of simple devices limited in cell libraries to independent design supporting complex fantastic nonstandard products, and is favorable for improving the design quality and efficiency of the micro / nano-scale independent products.
Owner:ZHEJIANG UNIV

Force feedback type needle puncture surgery training simulation device

The present invention discloses a force feedback type needle puncture surgery training simulation device. Three direct-current motors are mounted on a mounting chassis through motor supporting seats; the mounting chassis is provided with three angular displacement sensors through sensor supporting seats, wherein the three angular displacement sensors are located beside the three direct-current motors respectively; the output shafts of the direct-current motors are connected with the angular displacement sensors through couplings; the three direct-current motors are connected with a puncture needle through a transmission mechanism; a computer is connected with a USB-CAN interface card; the USB-CAN interface card is connected with a control circuit board and a motor driver; the angular displacement sensors are connected with the control circuit board; the control circuit board is connected with the motor driver; the motor driver is connected with the direct-current motors; and the direct-current motors operate independently so as to drive the puncture needle to move in a simulation manner. According to the device of the invention, the position and attitude of the puncture needle in a movement space can be acquired, corresponding force feedback can be bed back to an operator in real time based on the mechanics model of puncture, and therefore, the effect of puncture simulation training can be improved.
Owner:ZHEJIANG UNIV

Simulation equipment and method for describing simulation equipment attribute of embedded equipment

The invention provides simulation equipment and a method for describing the simulation equipment attribute of embedded equipment. The method comprises the following steps of: constructing an equipment layer node corresponding to the embedded equipment; constructing a plurality of state layer nodes below the equipment layer node, wherein each state layer node respectively describes one state attribute of the embedded equipment; constructing a plurality of view layer nodes below each state layer node, wherein each view layer node respectively describes the attribute of an appearance view of the embedded equipment in a corresponding state; and constructing a plurality of widget layer nodes below each view layer node, wherein each widget layer node respectively describes the attribute of a visible or an invisible widget of the embedded equipment under the corresponding appearance view. According to the invention, the attribute of any embedded equipment can be described, and a user can freely design any multiple sets of brand-new simulation equipment without modifying a simulator program.
Owner:ZTE CORP

Semi-physical simulation large-dynamic-energy infrared target simulation system

The invention proposes a large dynamic energy infrared target simulation system. The system is composed of a radiation source module, an optical system, a control module and supporting devices. The radiation source module includes a black body radiation source, a black body controller, a condenser lens, a light barrier, an attenuation film group and a light barrier group. The attenuator group includes attenuator A and attenuator B. The diaphragm group includes diaphragm A and diaphragm B. The optical system includes a relay optical lens and a collimating optical lens. The control module includes industrial computer (with reflective memory card and motion control card), I / O card, motor driver, servo motor, control cable and control software. The control module can control the change of the shape, size and energy of the target. The spectral characteristics of the radiation source are adjusted by adjusting the temperature of the black body through the black body controller.
Owner:SHANGHAI INST OF ELECTROMECHANICAL ENG

System and method for simulating Ieee1588 module in OTN (Optical Transport Network)

The invention relates to the field of logic verification development and discloses a system for simulating an Ieee1588 module in an OTN (Optical Transport Network). The invention also discloses a method for simulating the Ieee1588 module in the OTN (Optical Transport Network). The method comprises the steps that S1, an excitation generation module generates Ethernet frames and ptp frames; S2, the ptp frames are mixed with the Ethernet frames, thereby forming mixed Ethernet frames; S3, a simulation system access module captures the mixed Ethernet frames and generates a drive signal for driving DUT, and the simulation system access module captures the Ethernet frames and the ptp frames generated by the excitation generation module and sends the Ethernet frames and the ptp frames to scoring boards; S4, a simulation system output module monitors and obtains the mixed Ethernet frames output by the DUT; S5, the mixed Ethernet frames output by the DUT are separated, thereby obtaining the Ethernet frames and the ptp frames; and S6, in the scoring boards, the separated Ethernet frames are compared with the Ethernet frames generated by the excitation generation module, and the separated ptp frames are compared with the ptp frames generated by the excitation generation module. The system and the method are high in multiplexing.
Owner:FENGHUO COMM SCI & TECH CO LTD +1

A horizontal rocking plate type internal wave generating device

The invention aims to provide a horizontal swing plate type internal wave generation device. The horizontal swing plate type internal wave generation device comprises a wave generation mechanism, a control and measurement system and a machine base. The wave generation mechanism is a horizontal swing plate type wave generation mechanism. A swing plate is placed at the junction of two layers of flowing liquid levels, is driven by a crank and rocker mechanism and can do reciprocating wave generation motion up and down at the junction of the two layers of flowing liquid levels to generate periodical internal waves. The control and measurement system provides control signals for the wave generation mechanism and feeds back the motion frequency of a motor. The wave generation mechanism and the measurement system are supported by the machine base to make the whole device integrated, and the machine base also has the wave absorbing function. Due to the adoption of the horizontal swing plate type internal wave generation device, complex wave generation motion can be carried out at the junction of the two layers of flowing liquid levels by the swing plate to generate the periodical internal waves without generating surface waves at the same time when ocean internal waves are truly simulated, and interference of surface waves in original experiments is completely eliminated. The device is simple in structure, convenient to operate, high in motion precision and low in energy consumption and has good application and market value.
Owner:HARBIN ENG UNIV

Simulation system and simulation method

A simulation system and a simulation method are provided. The simulation system includes: a user interface module configured to receive an external input; a control module configured to control a behavior described in a preset simulation logic program based on the external input, wherein in the preset simulation logic program, the state in a simulated item and the behavior of driving the state change are described in a code form, when the external input includes a learnable parameter, the control module acquires an optimization value of the learnable parameter from an optimization module, andperforms a step of controlling the behavior described in the preset simulation logic program based on the external input by taking the optimization value as a value of the learnable parameter; a simulation module configured to run the preset simulation logic program in response to the control of the control module; and an optimization module configured to perform optimization learning on the valueof the learnable parameter based on the simulation result data output by the simulation module.
Owner:THE FOURTH PARADIGM BEIJING TECH CO LTD

Test device and test method for long-distance water diversion channel circulating water flow freezing model

The invention provides a test device and a test method for a long-distance water diversion channel circulating water flow freezing model. The test device comprises a U-shaped flow channel, a water tank, a water pump, and a variable frequency control cabinet. The U-shaped flow channel comprises two sections of straight water conveyance flow channels and a section of 180 DEG arc-shaped water conveyance flow channel. According to the test device and the test method for the long-distance water diversion channel circulating water flow freezing model, a circulating flowing water flow is formed in the U-shaped flow channel by the water tank and the water pump; the water flow speed can be adjusted by the variable frequency control cabinet to guarantee the running stability of the water flow; and long-distance water diversion channel water conveying process in winter and cold environment can be simulated, and a model test platform is provided for researching the freezing characteristic law andthe ice melting mechanism of long-distance channel engineering under different water delivery flow rates.
Owner:NORTHWEST A & F UNIV

Independent sound insulation room

The invention discloses an independent sound insulation room. The independent sound insulation room comprises a first multimedia screen, a framework layer and a second multimedia screen, the multimedia screens are mounted on the inner and outer surfaces of the framework layer, wherein the framework layer comprises keel frame bodies, a framework body sound insulation layer between the keel frame bodies, framework surface sound insulation layers inside and outside the keel frame bodies, and flame-retardant layers covering the surfaces of the framework surface sound insulation layers. According to the independent sound insulation room, a sound absorption plate cooperates with the keel frame bodies, so that the framework strength and the sound absorption effect are improved, the contradictionbetween sound insulation quality control and sound insulation room weight and volume control is solved; sound absorption hole channels formed by metal films with protrusions are formed in the sound absorption plate, sound energy can be consumed in the two modes of air vibration and metal film wall friction or metal film vibration, meanwhile, resonance is formed between the metal films, the metal film composition is optimized, and the sound energy consumption efficiency is further improved; and excellent sound absorption effects are achieved inside and outside the sound insulation room, and theindependent sound insulation room is suitable for the situation that the sound insulation requirement is relatively high or the multimedia screens are arranged inside and outside.
Owner:拖瓦肆娱乐互动(天津)科技有限公司

A New Linear Electric Loading System

The invention discloses a novel linear electric loading system. The novel linear electric loading system comprises a base plate, base plate bosses, bumper block installing tables, bumper blocks, rubber blocks, guide rails, a slide platform, a connecting block, a magnetic railing ruler, drag chain installing angle iron, a force sensor, drag chains, a linear motor, a threaded connecting rod, a linear steering engine, a supporting plate and fixing screws. According to the novel linear electric loading system, aluminum alloy platforms are adopted in the linear motor, the guide rails and the like, and therefore dynamic performance of the system can be improved beneficially. Compared with a traditional loading structure that a servo motor is installed with a ball screw, the novel linear electric loading system has the advantages that the slide platform is adopted, a loading motor and the steering engine are connected through threaded rods, and the shortcomings that the traditional loading structure is long in reversed time and poor in dynamic performance are effectively overcome. Compared with a traditional connecting method using lug rings, the method of connecting the loading motor and the electric steering engine through the threaded rods avoids connecting gaps and improves loading accuracy. When the loading system breaks down, the phenomenon of rotation blocking of the steering engine can be prevented, the steering engine can not be damaged, and the effect of safety protection is achieved.
Owner:BEIHANG UNIV

Pollutant discharge list time distribution determination method and device

The invention provides a pollutant discharge list time distribution determination method and device. The pollutant discharge list time distribution determination method comprises the following steps:determining a sample collection object according to a preset sample collection condition; collecting training sample data according to the determined sample collection object, wherein the training sample data comprises bulk coal combustion amount influence parameter data; determining a daily average coal consumption determination model by utilizing a coal consumption initial model constructed by aneural network; determining the daily average bulk coal combustion amount of the to-be-detected area according to the bulk coal combustion amount influence parameter data of the to-be-detected area and the daily average coal combustion amount determination model; and determining civil coal pollutant discharge list time distribution according to the determined daily average coal consumption. A civil coal atmospheric pollutant emission list time distribution coefficient determination scheme is provided to meet the increasingly fine air quality model simulation requirements.
Owner:ELECTRIC POWER RES INST STATE GRID JIBEI ELECTRIC POWER COMPANY +4

Beidou B1 frequency point intermediate frequency signal simulation method

The invention discloses a Beidou B1 frequency point intermediate frequency signal simulation method. A simulation system mainly realizes the satellite signal simulation with in the arbitrarily given simulation time, the arbitrarily given simulated flight track and the arbitrarily given carrier-to-noise ratio. According to the method, the satellite signal transmission delay in the flight track is obtained through carrier flight track and satellite ephemeris resolving, through the delay and the influence of an ionized layer and a convection layer on the delay, ranging codes, navigation messages and carrier waves of corresponding satellites are generated, signals of the multiple satellites are synthesized into one path of signals, then, noise is added, and in addition, filtering, quantization and signal storage are carried out. The influence of the transmission delay calculation quantity on the consumed simulation time is considered, the flight track delay with the period being 0.2ms is calculated in advance, the transmission delay of each sampling point is calculated through interpolation, the precision is ensured, meanwhile, the data storage is greatly saved, and the simulation efficiency is improved.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products