Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

42 results about "Access Grid" patented technology

Access Grid is a collection of resources and technologies that enables large format audio and video based collaboration between groups of people in different locations. The Access Grid is an ensemble of resources, including multimedia large-format displays, presentation and interactive environments, and interfaces with grid computing middleware and visualization environments. In simple terms, it is advanced videoconferencing using big displays and with multiple simultaneous camera feeds at each node (site). The technology was invented at Argonne National Laboratory, Chicago.

Digital museum gridding and construction method thereof

The invention discloses a digital museum grid and the construction method thereof; the digital museum grid includes a grid portal device, a job dispatching and an execution management device, an information center, a resource retrieval service device, an ontology service device, a heterogeneous database accessing and integration device, a grid monitoring device and other devices. The method includes: establishing an ontology device to establish the instantiation relation between digital museum resource and the global ontology by semantic labeling, establishing the heterogeneous database accessing and integration device to provide a global uniform view and a uniform access interface of heterogeneous database resource for the users of grid system recourse, establishing the grid resource monitoring device to collect original state data of monitoring nodes and classify the data into uniform standard information format for visualization, establishing the grid portal device to provide grid resource accessing and service, application of execution and monitoring grid, and a service environment supporting the cooperative work of users. In the process of application, the invention utilizes grid middleware and receives job request through a grid job dispatch device to fulfill job dispatching and execution information management and to generate and manage the resource retrieval service device so as to index a grid service device through an information service device. The invention can realize the mutual communication and organic sharing of the massive digital museum resources in multidisciplinary field and eliminate the isolated island phenomena of sample information.
Owner:BEIHANG UNIV

Protection performance evaluation system and method at same-tower four-circuit power transmission line

The invention discloses a protection performance evaluation system and method at a same-tower four-circuit power transmission line. The method comprises: inputting a line structure parameter, access grid information and protection incorrect evaluation factor; controlling turning on or off of all switches of a first group to a fifth group of fault switches to realize controlling of a fault type; for any fault type, setting line lengths and fault point positions between double circuit towers and four-circuit towers; according to voltage levels and locations of all power supplies, adjusting parameters of corresponding transformers and impedors; and carrying out statistics of fault types and line protection actions at occurrence of faults at different positions and carrying out weighted statistics and evaluation on faults and protection actions of all power transmission lines, thereby obtaining a line protection performance quality evaluation report. According to the invention, various fault feature influence factors are considered comprehensively; some operation ways that may cause inaccurate protection actions easily can be avoided; protective setting and key prevention are realized; protection strategies of manufacturers can be protected; and the good support can be provided for secure and stable operation of the power grid.
Owner:GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD

Power system frequency modulation controllable electric automobile quantity dynamic change simulation method based on Monte Carlo

The invention relates to a power system frequency modulation controllable electric automobile quantity dynamic change simulation method based on Monte Carlo, and belongs to the technical fields of electric automobiles and an access grid thereof. The method comprises the following steps: firstly, initializing relevant parameters of electric automobiles, secondly, judging types of the electric automobiles, and determining in/out controllable state time tables of all the electric automobiles, thirdly, making statistics and analyzing the time tables, so as to obtain the controllable electric automobile quantity N'in (ti) and the out controllable electric automobile quantity N'iout (ti) within every moment in a region, fourthly, computing the cumulative quantity of automobiles at in/out controllable state, and fifthly, computing the quantity of controllable electric automobiles. The method can properly compute the quantity of the controllable electric automobiles in the region, so as to obtain the quantity dynamic change of various types of the controllable electric automobiles participating in frequency modulation, meanwhile, the method fills the gap in the technical filed, and lays a solid theoretical foundation for deeply researching electric automobiles participating in frequency modulation.
Owner:CHONGQING UNIV +2

Reactive voltage control circuit simulation method and system for distributed grid-connected converter

The invention discloses a reactive voltage control circuit simulation method and system for distributed grid-connected converter. The method includes: creating a corresponding circuit simulation modelin the power simulation software according to parameters of the plurality of grid-connected converters to be controlled; creating a reactive voltage control model, and connecting the reactive voltagecontrol model as a control logic circuit to a corresponding circuit simulation model; performing a voltage sag simulation experiment on the plurality of circuit simulation models to verify whether the circuit simulation model during the voltage sag can output excess reactive power support circuit voltage; performing a follow-up simulation experiment of reactive power on the plurality of circuit simulation models to verify the following performance of the circuit simulation model for rated power. The method and system establish a circuit simulation model and a reactive voltage circuit controlmodel, and obtain a control model that can be switched according to the access grid type control method through simulation experiments to meet different grid requirements of different usage scenarios.
Owner:ELECTRIC POWER RES INST OF GUANGDONG POWER GRID

Loop difference testing apparatus of transformer substation direct-current power supply system

InactiveCN105158705AInspection for Preventing Leapfrog MisoperationEasy to testPower supply testingDc currentAlternating current
The invention, which belongs to the technical field of the power supply equipment, provides a loop difference testing apparatus of a transformer substation direct-current power supply system. In order to solve problems existing in the prior art, the testing apparatus is characterized in that a direct-current output interface is connected with a direct-current fuse load terminal at a final stage and sends a current to a grid-connected inverter based on sampling of a current sampling circuit and a voltage sampling circuit. The grid-connected inverter converts the direct current into a grid-connected alternating current and transmits the current to an access grid unit; and the access grid unit transmits an alternating-current signal to the power grid back. The grid-connected inverter uses a computer to control and adjust different current outputs, thereby generating currents from 0 to 500A to enable a protection element of the direct-current power loop to make action. The current sampling circuit and the voltage sampling circuit can carry out sampling on a current value and a voltage value during the motion of a circuit breaker; signals are transmitted to an A/D converter simultaneously; the A/D converter converts analog signals into digital signals that are transmitted to the computer; the computer calculates the digital signals and determines the motion characteristic of the direct-current loop according to different currents and motion time; and then the computer inputs the signals into a report output unit by a report conversion tool.
Owner:STATE GRID CORP OF CHINA +2

Construction method of dynamic cooperation perception model facing cooperation type gridding application

The invention provides a method for structuring collaborative awareness model for collaborative grid application in visiting grid, which comprises the following procedures: 1) firstly concluding the elements and the relationship among elements related to the collaborative grid application in the visiting grid, structuring the object method graph for the collaborative grid application, and simplifying object method graph through operation relationship; 2) then providing the edge weight value of the object method graph according to the behavior correlation among collaborative members during the implementation process of the collaborative grid application, and calculating the behavior correlation degree among collaborative members and quantifying the behavior awareness strength of one collaborative member to other members; 3) finally deciding the awareness space of collaborative members according to the comparison result between awareness strength and awareness threshold, selecting collaborative information which collaborative members need based on correspondent awareness space, and filtering collaborative information which collaborative members do not need. The invention is capable of judging the dynamic relations among collaborative members and collaborative mission in grid environment, deciding the awareness strength and the awareness space of collaborative members during collaborative process, selecting the collaborative information which is needed the collaborative members, and filtering collaborative information which collaborative members do not need, ensuring the collaborative members to finish collaborative mission sufficiently and more carefully.
Owner:BEIHANG UNIV

A novel power equipment access grid reliability assessment and optimization method and system

The invention relates to a novel power equipment access power grid reliability assessment and optimization method and system. The method comprises the following steps: calculating the reliability of novel power equipment after access to a power grid according to a pre-established novel power equipment reliability model and the access position of the novel power equipment; comparing the reliabilitylevel change before and after the novel power equipment is connected to the power grid, and determining a power grid system reliability optimization target and a novel power equipment reliability optimization target; determining a weak module in the novel power equipment by performing sensitivity analysis on the reliability of the novel power equipment; the sensitivity of weak module constituentparts is analyzed through a perturbation method, and economic analysis is combined, so that the economic costs of different sub-modules are compared when the same reliability level is improved, and the constituent parts and the improvement amount which should be improved for improving the reliability of the sub-modules are determined; and the improved novel power equipment is connected to a powergrid, system reliability evaluation is carried out again, and the equipment optimization and improvement effect is judged. The reliability level can be improved.
Owner:STATE GRID CORP OF CHINA +3

Construction method of dynamic cooperation perception model facing cooperation type gridding application

The invention provides a method for structuring collaborative awareness model for collaborative grid application in visiting grid, which comprises the following procedures: 1) firstly concluding the elements and the relationship among elements related to the collaborative grid application in the visiting grid, structuring the object method graph for the collaborative grid application, and simplifying object method graph through operation relationship; 2) then providing the edge weight value of the object method graph according to the behavior correlation among collaborative members during theimplementation process of the collaborative grid application, and calculating the behavior correlation degree among collaborative members and quantifying the behavior awareness strength of one collaborative member to other members; 3) finally deciding the awareness space of collaborative members according to the comparison result between awareness strength and awareness threshold, selecting collaborative information which collaborative members need based on correspondent awareness space, and filtering collaborative information which collaborative members do not need. The invention is capable of judging the dynamic relations among collaborative members and collaborative mission in grid environment, deciding the awareness strength and the awareness space of collaborative members during collaborative process, selecting the collaborative information which is needed the collaborative members, and filtering collaborative information which collaborative members do not need, ensuring the collaborative members to finish collaborative mission sufficiently and more carefully.
Owner:BEIHANG UNIV

A high-permeability photovoltaic access method to prevent overvoltage at the neutral point of the main transformer

The invention discloses a method for preventing overvoltage of the neutral point of a main transformer in high-permeability photovoltaic access. The method is based on a traditional photovoltaic grid-connected decoupling double closed-loop control method, and can be divided into 3 states: in a state 1, the voltage of the neutral point of the main transformer is over the rated voltage but the overvoltage is within an allowable range, and a traditional grid-connected control method is adopted; in a state 2, the voltage of the neutral point of the main transformer rises to the phase voltage and does not reach the breakdown condition, the voltage and current of the grid connection point and the voltage of the neutral point of the main transformer are collected, the photovoltaic grid connectionphase angle is adjusted to limit the voltage of the neutral point of the main transformer within a safety range, and active power output of photovoltaic grid connection is ensured; and in a state 3,the voltage of the neutral point of the main transformer is broken down, the photovoltaic power supply operates in an off-grid mode, the voltage of the neutral point of the main transformer decreasessubstantially, and the photovoltaic system is connected with an energy storage device through a DC converter. By changing the photovoltaic grid-connected control strategy and adding a supporting energy storage device, the problem that transformer damage is caused due to too high voltage of the neutral point of the main transformer during operation of a high-permeability photovoltaic access grid infault can be solved.
Owner:NANJING INST OF TECH

Digital museum gridding and construction method thereof

The invention discloses a digital museum grid and the construction method thereof; the digital museum grid includes a grid portal device, a job dispatching and an execution management device, an information center, a resource retrieval service device, an ontology service device, a heterogeneous database accessing and integration device, a grid monitoring device and other devices. The method includes: establishing an ontology device to establish the instantiation relation between digital museum resource and the global ontology by semantic labeling, establishing the heterogeneous database accessing and integration device to provide a global uniform view and a uniform access interface of heterogeneous database resource for the users of grid system recourse, establishing the grid resource monitoring device to collect original state data of monitoring nodes and classify the data into uniform standard information format for visualization, establishing the grid portal device to provide grid resource accessing and service, application of execution and monitoring grid, and a service environment supporting the cooperative work of users. In the process of application, the invention utilizes grid middleware and receives job request through a grid job dispatch device to fulfill job dispatching and execution information management and to generate and manage the resource retrieval service device so as to index a grid service device through an information service device. The invention can realize the mutual communication and organic sharing of the massive digital museum resources in multidisciplinary field and eliminate the isolated island phenomena of sample information.
Owner:BEIHANG UNIV

Article storing and taking device

The embodiment of the invention discloses an article storing and taking device. In a specific implementation mode, the device comprises a control module, an access cabinet and a storage device, wherein the access cabinet comprises a plurality of access grids, each access grid comprises a first grid door arranged on the first side of the access cabinet and a second grid door arranged on the second side of the access cabinet, and the first side and the second side are opposite sides of the access cabinet; the storage device comprises a rotating and placing mechanism and a plurality of bearing tables; the control module is used for responding to a storage instruction or a take-out instruction to open the first lattice door, responding to the storage instruction to open the second lattice door of the corresponding access lattice and controlling the transfer mechanism to take out the articles in the corresponding access lattice and transfer the articles on a vacant bearing table, and in response to the putting-back instruction to open a second lattice door of a vacant access lattice, controlling the rotating and placing mechanism to take out the articles on the corresponding bearing table and transfer the articles into the vacant access lattice. According to the embodiment, access resources of the access cabinet can be saved, and the operation efficiency of the access cabinet is improved.
Owner:BOE TECH GRP CO LTD

Baffle movement control method and device, storage medium and intelligent logistics terminal equipment

The embodiment of the invention provides a baffle movement control method and device, a storage medium and intelligent logistics terminal equipment. The method comprises the steps of obtaining a baffle movement instruction, wherein the baffle movement instruction is used for indicating a baffle to move from the Nth access grid to the Mth access grid; then determining an expected rotation directionaccording to the baffle movement instruction, wherein the expected rotation direction is the rotation direction of a controlled motor enabling the baffle to move from the Nth access grid to the Mth access grid; then controlling the control motor to rotate in the expected rotation direction so as to drive the baffle to move towards the Mth access grid; and furthermore, acquiring sensor informationreturned by photoelectric sensors in the process of moving the baffle to the Mth access grid, and controlling the baffle to stop at the Mth access grid according to the sensor information. Accordingto the method provided by the invention, multi-point reliable baffle movement control can be realized, and the number of required photoelectric sensors is small, so that the cost of the intelligent logistics terminal equipment is greatly reduced.
Owner:HISENSE COMML DISPLAY CO LTD

Operation method of mobile power generation system connected to power grid using backup and self-switching technology

The mobile power generation system adopts the standby self-switching technology to connect to the power grid operation method, and uses the load transfer system and power generation system with dual-power backup automatic switching control device for operation; the load transfer system includes the first backup automatic switching control device (1DL) , The second standby automatic switching control device (2DL) and the external connection cable (L) with the first load switch (K1) connected between the two power sources, and the second one installed on the front cable of the first standby automatic switching control device The load switch (K2), the mobile power generation system (C) and the third load switch (K3) connected to the rear cable of the second standby automatic switching control device; when the 10kV line (1) needs maintenance, disconnect the line The back-end load at point (A) is powered by the mobile power generation system; when the line needs to be repaired, the back-end load at the disconnection point of the line is powered by the mobile power generation system. The invention can realize seamless switching with mains power, realize fast response and handling of emergencies, realize comprehensive non-stop maintenance of distribution network, and improve power supply reliability.
Owner:云南电网有限责任公司输电分公司

A photovoltaic power generation system model parameter identification test method

InactiveCN103675524BIncrease running dataHigh precisionElectrical testingTransformerThe Internet
The invention relates to a method for identifying and testing model parameters of a photovoltaic power generation system. The test method is to access a power grid disturbance simulator before the photovoltaic power generation system goes online, and complete the operation data of the photovoltaic power generation system under fault conditions without affecting the operation of the power grid. When testing the wiring, first stop the output of the grid-connected unit inverter of the photovoltaic power generation system, connect the test system in series to the grid-connected line of the photovoltaic power generation system, and connect the photovoltaic inverter output AC boost in series to the incoming line of the test system The circuit breaker is connected to the grid disturbance simulator after being stepped down by the step-down transformer. The grid disturbance simulator simulates single-phase, two-phase, three-phase different types of grid faults and grid system frequency faults, and then restores the voltage to On-grid voltage level, connected to the grid after passing through the on-grid circuit breaker. This method can provide accurate basis for identifying model parameters of photovoltaic power generation system under normal and fault conditions of the power grid.
Owner:STATE GRID CORP OF CHINA +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products