Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

170 results about "Test duration" patented technology

Cooling-tower performance testing device and method

A cooling-tower performance testing device, comprising: a first barrier member (11) arranged on a water output pipeline of an RIS-RHR heat exchanger (21); a heat-source obtaining assembly (12), which has a first end mechanically connected between the first barrier member (11) and a water outlet of the RIS-RHR heat exchanger (21) and a second end mechanically connected to an EHR gate valve (31); and a second barrier member (13), which is arranged on a pipeline connected between a water outlet of a PTR heat exchanger (51) and a hot-side water inlet of an ECS heat exchanger (41). The device enables an ECS to obtain a stable heat source from one loop, and supplies heat to the ECS heat exchanger (41), and a heat source is thus provided for carrying out a cooling-tower performance test, without temporarily laying a large number of pipelines, thereby omitting a large amount of pipeline disassembly and site restoration work, and also effectively shortening a test duration and reducing test costs. Further provided is a cooling-tower performance testing method.
Owner:CHINA NUCLEAR POWER ENGINEERING COMPANY LTD

Method and device for evaluating influence of internal fault arc on alternating-current transformer bushing and computer equipment

The invention relates to a method and device for evaluating the influence of an internal fault arc on an alternating-current transformer bushing, and computer equipment. The method comprises the steps: carrying out the arc fault simulation through a test platform of the internal fault arc according to a test scheme, and collecting operation parameters in a test process; obtaining a test voltage curve, a test mechanical property curve and a test temperature curve according to the operation parameters; obtaining a corrected mechanical property curve and a corrected temperature curve according to the test current, the test duration, the test voltage curve, and a reference mechanical property correlation curve and a reference temperature property correlation curve corresponding to the alternating-current transformer bushing sample; according to the corrected mechanical property curve, the test mechanical property curve, the corrected temperature curve and the test temperature curve, the influence of the internal fault arc on the alternating-current transformer bushing is evaluated. The method can achieve the comprehensive evaluation of the internal fault arc influence of the sleeve, and improves the accuracy and reliability of an evaluation result.
Owner:ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD +1

Thermal insulation performance testing method, device, equipment and medium

The embodiment of the invention discloses a thermal insulation performance testing method, device and equipment and a medium. The method comprises the following steps: acquiring the current environment chamber temperature, and adjusting the initial position temperature of each candidate test position in a to-be-tested cab according to the current environment chamber temperature to obtain the candidate position temperature; when all the candidate position temperatures are the same as the current environment chamber temperature, the candidate position temperatures are updated based on the indoor heat supply amount in the air conditioner running state, and the reference position temperature is obtained; when the reference position temperature at the benchmark test position is the indoor temperature peak value, obtaining the reference position temperature at each candidate test position in the cab to be tested, and obtaining the target position temperature at each candidate test position after the preset test duration in the state that the air conditioner is turned off; and according to the reference position temperature, the target position temperature and the preset test duration, determining a thermal insulation test result of the to-be-tested cab. And the accuracy of testing the thermal insulation performance of the commercial vehicle cab is improved.
Owner:FAW JIEFANG AUTOMOTIVE CO

Electric power fitting aging test device and test method

The invention relates to the technical field of electric power fitting testing, in particular to an electric power fitting aging testing device and method, the stress state of an electric power fitting in actual use is simulated through the cooperation of a tensioning mechanism and a mechanical loading mechanism, environmental loads such as temperature change, humidity change and salt mist are applied through an environmental load simulation mechanism, and the aging test of the electric power fitting is achieved. And meanwhile, alternating current is applied to the electric power fitting through the power supply module, so that the actual load of the electric power fitting is comprehensively simulated, a test environment identical to an actual application environment is constructed, and the reliability of a test result is ensured. And meanwhile, an equivalent cable simulation load spectrum is deduced according to historical load data by using a fatigue damage model, and the tensioning mechanism, the mechanical loading mechanism and the environment simulation mechanism act cooperatively according to the cable simulation load spectrum to carry out aging test on the electric power fitting, so that the test time is shortened, and the accuracy of an aging test result is ensured.
Owner:POWERCHINA HENAN ELECTRIC POWER EQUIP CO LTD

Energy-saving memory bank aging test method, device, equipment and medium

The invention provides an energy-saving memory bank aging test method, device and equipment and a medium, and relates to the technical field of memory bank testing. The method comprises the following steps: determining test parameters of a memory bank aging test, wherein the test parameters comprise test duration and test temperature; setting the temperature of the memory bank aging test equipment as the test temperature; when the temperature of the memory bank aging test equipment reaches the test temperature, controlling the temperature of the memory bank aging test equipment to be kept at the test temperature, and starting timing; and when the timing time is equal to the test duration, turning off the memory bank aging test equipment, and ending the memory bank aging test on the memory bank. On one hand, the problem of inaccurate test caused by direct use of default test parameters is avoided; and on the other hand, the memory bank aging test equipment can be directly closed when the test duration is ended, so that the test accuracy is ensured, and the waste of electric energy is avoided.
Owner:深圳忆芯信息技术有限公司

Capacitive touch screen test data management method based on MES system

The invention relates to the technical field of industrial data processing, in particular to a capacitive touch screen test data management method based on an MES (Manufacturing Execution System), which comprises the following steps: acquiring a capacitive touch screen to be detected and performing a first test mode, wherein the first test mode tests the touch screen according to the first test temperature, the second test temperature, the test duration, the test period and the specified operation set; obtaining first test mode data after all the touch screens complete the first test mode; analyzing the data to obtain first abnormal data of the touch screen, wherein the first abnormal data comprises abnormal temperature and abnormal test operation of the touch screen; performing test optimization on the touch screen according to the abnormal temperature and the abnormal test operation, and performing a second test mode; obtaining second test mode data after all the touch screens complete the second test mode; analyzing the second test mode data to obtain second abnormal data; and according to the first abnormal data and the second abnormal data, judging whether the to-be-detected capacitive touch screen has a hardware fault or not.
Owner:ANHUI HONGSHIXIN OPTOELECTRONICS TECH CO LTD

Server test method and device, electronic equipment and storage medium

The invention discloses a server testing method and device, electronic equipment and a storage medium, and relates to the technical field of computers. The server test method comprises the following steps: pre-storing configuration information of a to-be-tested server in a current test cluster and a test resource demand of a to-be-tested case; and selecting the to-be-tested server suitable for executing the to-be-tested case based on the test resource demand of the to-be-tested case. Meanwhile, obtaining the test duration of the to-be-tested cases, selecting a plurality of mutually compatible to-be-tested cases as parallel test cases based on the obtained test duration, and scheduling the parallel test cases to a to-be-tested server meeting the test requirements of the parallel test cases, so as to carry out the parallel test of the parallel test cases. Therefore, the technical problem that the server testing efficiency is not ideal can be solved, and the technical effect of improving the server testing efficiency and reliability is achieved.
Owner:INSPUR SUZHOU INTELLIGENT TECH CO LTD

Hard disk testing method and program product

The invention discloses a hard disk testing method and a program product, and relates to the technical field of hard disk testing, and the method comprises the steps: obtaining the testing task information corresponding to the target configuration of a target hard disk, and understanding the dependency relationship between testing tasks needing to be executed, the testing duration and other characteristics through the testing task information; according to the method, the execution sequence of each test task is planned on the basis of the characteristics of each test task to obtain a first task path, and a server suitable for executing the test task is allocated to each test task to obtain resource allocation information, so that one or more test tasks are precisely planned, and the test task execution efficiency is improved on the basis of the first task path and the resource allocation information. According to the hard disk testing method and device, the technical problems that hard disk testing can be completed only through strong manual intervention, the testing efficiency is low, and the resource utilization rate is low are solved, and the technical effects that manual intervention is reduced, the testing efficiency is improved, server resources are reasonably utilized, and the resource utilization rate is improved are achieved.
Owner:INSPUR SUZHOU INTELLIGENT TECH CO LTD

Method for controlling a tank system in operation, tank system, computer program product and computer-readable medium

A method for controlling an operating tank system (100) is proposed. The tank system (100) comprises a plurality of tanks (12) and a line system (39). Each tank (12) is provided with a valve (13). The tank system (100) supplies at least one consumer (40) with a fluid. The method comprises the following steps: a) supplying the at least one consumer (40) from all tanks (12) of the plurality of tanks (12), b) closing all valves (13) of the plurality of tanks (12) for a defined test duration, c) opening a valve (13) of a first tank (12) of the plurality of tanks (12) and detecting an expected pressure increase by means of the line system (39), d) supplying the consumer (40) from the first tank, e) Upon reaching a predefined target pressure, opening a valve (13) of a second tank (12) of the plurality of tanks (12) and detecting an expected pressure increase by means of the line system (39), f) supplying the consumer (40) from the second tank (12), g) Repeating steps e) and f) successively with the respective further tanks (12), and wherein step g) is carried out until all valves (13) of all tanks (12) of the plurality of tanks (12) have been opened, so that the at least one consumer (40) is supplied from all tanks (12) of the plurality of tanks (12).
Owner:ROBERT BOSCH GMBH

SoC PHY ATE serial and parallel hybrid scalable multi-level connection test architecture

The present invention discloses a SoC PHY ATE serial-parallel hybrid scalable multi-stage connection test architecture, which relates to the field of system-level chip testing, and implements the access of the PHY to be tested based on a preset access logic, wherein the preset access logic specifically includes: connecting the test interfaces of multiple PHYs of the same type in parallel through a JTAG_HUB module, and accessing the JTAG Chain via the JTAG_HUB module; based on the type of PHY, if the number of the current type of PHY is only one, directly accessing the JTAG Chain when it is a JTAG test interface, and accessing the JTAG Chain via a TAP_FSM module when it is a TDR test interface; inserting a JTAG_PIPE module based on the distance between access nodes in the JTAG Chain. The present application can effectively solve the problem of PHY test duration.
Owner:SIENGINE TECH CO LTD

Method and system for calculating leakage rate of primary loop of nuclear power plant

The invention provides a nuclear power plant primary loop leakage rate calculation method and system, and the method comprises the steps: controlling a cooling medium to circularly flow in a test pipeline under a first preset pressure, and detecting whether the pressure boundary of a primary loop leaks or not; when the pressure boundary of the primary loop does not leak, controlling the circulating flow test duration of the cooling medium in the test pipeline under a second preset pressure, detecting whether recognizable leakage exists in the primary loop, and obtaining a recognizable leakage rate, a side leakage rate outside the pressure boundary of the primary loop and test data; calculating the overall leakage rate of the loop according to the test data and the test duration; and calculating the total leakage rate and the unidentifiable leakage of the loop according to the overall leakage rate, the identifiable leakage rate and the side leakage rate. According to the invention, when the auxiliary system of the unit under construction of the nuclear power plant is not completed, a set of test water tank can be connected between the discharge pipeline interface and the charge pipeline interface of the loop.
Owner:CHINA NUCLEAR POWER ENGINEERING COMPANY LTD

High-temperature reverse bias aging test method and system, terminal and medium

The invention relates to the technical field of high-temperature reverse-bias aging testing, in particular to a high-temperature reverse-bias aging testing method and system, a terminal and a medium. Obtaining product information of the to-be-tested device according to the test instruction; acquiring a test duration, a test environment and a corresponding test voltage based on the product information of the to-be-tested device; starting to test the to-be-tested device based on the test time, the test environment and the corresponding test voltage, and obtaining a test result; and if the test result does not meet the high-temperature aging standard condition, outputting warning information. According to the invention, the test precision and reliability can be improved.
Owner:HANGZHOU GAOKUN ELECTRONIC TECHNOLOGY CO LTD

Smart card test system

The utility model discloses an intelligent card test system. The system comprises a main control processor, a first radio frequency induction module, a second radio frequency induction module, a time accumulator, a counter and a power supply module, the first radio frequency induction module is used for uninterruptedly reading a test card, acquiring a first light emitting state of an LED lamp of the test card, and outputting a first electric signal to the time accumulator according to the first light emitting state; the time accumulator is used for accumulatively receiving the first electric signal so as to determine the accumulative test time length of the test card; the second radio frequency induction module is used for periodically reading the test card according to a preset time interval, acquiring a second light-emitting state of the LED lamp of the test card, and outputting a second electric signal to the counter according to the second light-emitting state; and the counter is used for accumulating the received second electric signal so as to determine the accumulated test times of the test card, thereby realizing the durability test of the product added with the LED optical signal feedback in the intelligent card.
Owner:ZHUHAI RUICHENG TECHNOLOGY CO LTD

A test scheme for evaluating data retention performance of NOR-type flash memory

The application provides a test scheme for checking data retention performance of NOR type Flash memory, focuses on the influence of erase-write cycles on the data retention performance, unifies the erase-write cycle number of the Flash memory test, stipulates clear temperature selection criteria, provides a reference for the Flash memory related test, and comprises the following steps: step one: determining the basic test algorithm of the NOR type Flash memory as the Checkerboard algorithm from the algorithm design complexity and the fault coverage; step two: improving the Checkerboard algorithm process and determining the data retention fault determination step; step three: carrying out a pre-experiment to determine the data retention performance test temperature, erase-write number and sample number of the NOR type Flash memory; step four: determining the erase-write number of the data retention test at normal temperature and the sample number under each erase-write number; step five: determining the test pattern, failure criterion, test duration and test cycle; step six: carrying out the data retention test combined with the erase-write cycle based on the non-replacement timing truncation test; and step seven: test data processing, fitting the average failure time under different erase-write numbers with the erase-write number to obtain the corresponding relationship between the average failure time and the erase-write number.
Owner:BEIHANG UNIV

Rod position measurement and parameter adjustment method and system and medium

The invention relates to the field of nuclear power plant rod position measurement system adjustment and calibration, in particular to a rod position measurement and parameter adjustment and calibration method and system and a medium, and the method comprises the steps: respectively adjusting the induction voltage of each secondary coil to be a preset calibration induction voltage according to a rod position detector and a secondary coil group; acquiring a bump peak voltage and a small trough voltage of each secondary coil of the corresponding rod position detector in the full-stroke movement process of the control rod; and for each secondary coil group, calculating an optimal comparator threshold voltage and an optimal hysteresis voltage range according to the bump peak voltage and the small trough voltage of the corresponding secondary coil, and taking the optimal comparator threshold voltage and the optimal hysteresis voltage range as the threshold voltage and the hysteresis voltage range of the threshold comparator. Compared with a traditional method, the method has the advantages that the number of trial times of blind parameter adjustment is greatly reduced, the static test duration is shortened, the adjustment efficiency of a rod position measurement system is remarkably improved while the position indication precision of the control rod is guaranteed, and the operation and maintenance cost of a nuclear power unit is saved.
Owner:CHINA NUCLEAR POWER ENGINEERING COMPANY LTD

Time sequence control method for dry biochemical analyzer, control apparatus, and storage medium

The present disclosure provides a time sequence control method for a dry biochemical analyzer, a control apparatus, and a storage medium. The method comprises: dividing one biochemical test into k time sequence control cycles each in the form of nA+B, wherein each time sequence control cycle consists of two parts: nA representing n light measurement preparation parts, and B representing one light measurement part, and multiple reagent card tests are performed in each time sequence control cycle; in a light measurement preparation part of a current time sequence control cycle, controlling a card feeding device to perform card feeding actions required for light measurement on n reagent cards in the current time sequence control cycle, and controlling a sample loading device to perform sample loading actions required for light measurement on n reagent cards in the previous time sequence control cycle; and according to a preset light measurement action required by a biochemical test method in each time sequence control cycle, controlling, in a light measurement part of each time sequence control cycle, a light measurement mechanism to perform light measurement actions on all reagent cards in a reagent card reaction device. The total test duration of multiple items or multiple reagent cards is shortened, thereby improving the test efficiency.
Owner:XIAN BIOLAB BIOTECHNOLOGY CO LTD

Automatic test method, device and system for quiescent current of whole vehicle, and storage medium

The invention discloses a whole vehicle quiescent current automatic test method, device, storage medium and system, and the method comprises the steps: obtaining a to-be-tested case, analyzing a test scene limited by the to-be-tested case, determining a control instruction corresponding to the test scene, transmitting the control instruction to a to-be-tested vehicle, and testing the quiescent current of the whole vehicle. Controlling the to-be-tested vehicle to run according to the test scene and to be powered off after running, acquiring a control instruction corresponding to the test scene, sending the control instruction to the to-be-tested vehicle, controlling the to-be-tested vehicle to run according to the test scene and to be powered off, responding to a power-off signal of the to-be-tested vehicle, and controlling the current acquisition circuit to be switched on, and a current acquisition part in the current acquisition circuit acquires the quiescent current of the vehicle load, acquires the quiescent current value of the vehicle load acquired by the current acquisition part in real time, and compares the quiescent current value with a set threshold value within a set test duration to determine a test result. According to the invention, during the static current test, human resources are released, and the test efficiency is improved.
Owner:BEIJING CO WHEELS TECH CO LTD

Method for measuring liquid flow property and apparatus for observing droplet

A method for measuring a liquid flow property is provided. The method includes controlling a droplet to drop from a preset height to a substrate, acquiring a droplet density on the substrate, a maximum radius of a tip of the droplet, a real-time height of the tip, an initial height of the tip, and a testing duration from a beginning of the droplet to fall on the substrate to an end of a test, determining that influencing factors of the tip of the droplet comprise inertial force and viscous force, and the inertial force is equal to the viscous force, and calculating a calculated viscosity of the droplet, wherein the calculated viscosity of the droplet is related to a first calculation coefficient, the droplet density, the maximum radius of the tip and the initial height of the tip, and the first calculation coefficient is equal to a ratio of a tip height change value to the testing duration, wherein the tip height change value is a difference between the initial height of the tip and the real-time height of the tip.
Owner:CCTEG COAL MINING RES INST

Multi-Platform Linkage Testing Method for Autonomous Driving Simulation Based on Offline Task Allocation

The present invention belongs to the technical field of autonomous driving testing, and specifically relates to a multi-platform linkage testing method for autonomous driving simulation based on offline task allocation. It includes: First, mathematically express the offline task allocation of multi-platform linkage testing, and clarify the definitions of key elements, including the definition of test duration elements and the definition of test load elements; Second, establish test task allocation constraints, including test accuracy constraints, test priority constraints, and test load constraints; Third, use the particle swarm algorithm to solve the task allocation results, so as to obtain the specific tasks of different test platforms. The present invention realizes the linkage testing of multiple simulation test platforms through test task allocation. This method can solve the linkage testing method when there are multiple test platforms in the autonomous driving system by setting test process allocation constraints and solving; since the test platform accuracy is considered simultaneously during the task allocation process, and the testing capabilities of multiple platforms can be utilized, the testing efficiency can be improved while ensuring the testing accuracy.
Owner:JILIN UNIVERSITY

A server aging program monitoring method, device, terminal and storage medium

The present invention relates to the field of server aging testing, and specifically discloses a server aging program monitoring method, device, terminal and storage medium, which maintain a basic database table to store basic test information and corresponding basic test duration; create a test record database table to record basic test information and the start test time and end test time of the corresponding test; after the test is started, the data of the current test in the test record database table is periodically obtained to query whether the data of the current test has an end test time; if the data of the current test has an end test time, the current test is normal; if the end test time in the data of the current test is empty, the tested duration is calculated based on the start test time of the current test, and it is determined whether the tested duration is greater than N times the corresponding basic test duration in the basic database table. If so, the current test is marked as abnormal. The present invention can issue an alarm if the predetermined time is exceeded, reminding staff to pay attention.
Owner:INSPUR SUZHOU INTELLIGENT TECH CO LTD

Apparatus and method for testing duration of black ice and coagulation strength on phase change asphalt pavement

The application provides a device and method for testing the duration and coagulation strength of black ice on a phase change asphalt pavement, and belongs to the technical field of road surface anti-icing performance testing technology. The device comprises a pressure head unit, a water tank unit and a collection unit. The pressure head unit comprises a hollow circular tube, a concentric variable-diameter special-shaped tube, a circular sheet, a steel ball, a circular rod, a cylinder and a spring. The water tank unit comprises a fan-shaped water tank, a plastic film, a screw, a level and a horizontal adjustment foot with a screw rod. The collection unit comprises an electric conductivity meter and a pressure gauge. The test method of the application is as follows: a freeze-thaw test is carried out on the phase change asphalt mixture with different thicknesses of water film on the bottom surface, the coagulation time, melting time and duration of black ice with different thicknesses are tested from the electric conductivity-time curve, and the coagulation strength of black ice with different thicknesses is tested by pressing the black ice with different thicknesses to break.
Owner:HOHAI UNIV +1

AGC test verification scene library construction method and system containing new energy

PendingCN122287151AReal test scenario supportImprove effectivenessData setNew energy
This invention relates to the field of power dispatch and control technology, and in particular to a method and system for constructing an AGC test and verification scenario library containing new energy sources. The method first standardizes and cleans abnormal data from multi-source historical power grid operation data, performs AGC unit inversion correction, and generates initial AGC test data sets by dividing the data into segments according to a preset test duration. Then, based on each data set, AGC closed-loop simulation tests are performed, and valid test samples are selected according to power flow convergence to construct a preliminary scenario library. Further, from three dimensions—typical operation scenarios, fault scenarios, and new energy output scenarios—the valid samples are clustered and labeled to extract composite test scenarios and remove redundant samples. Finally, an AGC abnormal operating condition quantification model is constructed to derive extreme abnormal operating condition test scenarios, forming the final scenario library, thereby improving the comprehensive verification capability of the AGC system under high-proportion new energy conditions.
Owner:STATE GRID JIANGSU ELECTRIC POWER CO LTD RESEARCH INSTITUTE +2

Automatic test method for rated power of DC / DC converter of new energy automobile

The invention discloses an automatic test method for rated power of a DC / DC converter of a new energy automobile, which mainly aims at finding and adjusting the condition that the actual output power of the DC / DC converter is higher than a rated value in time and avoiding the risks of fuse fusing, line overheating, low-voltage electric equipment burning, even fire and the like caused by exceeding the bearing limit of a low-voltage system component. Specifically, the method comprises the steps of firstly deploying a power test system and performing line connection, setting test parameters after deployment is completed, starting a test and collecting test data within a preset test duration; in the test process, when the output power of the DC / DC converter exceeds the power control upper and lower limit values, the current of the DC electronic load is automatically adjusted, so that the output power of the DC / DC converter returns to the control range. According to the invention, the test value of the rated power of the DC / DC converter can be accurately obtained at one time, the test cost is greatly reduced, the safety is improved, and the consistency and reliability of the test result are effectively ensured.
Owner:ANHUI JIANGHUAI AUTOMOBILE GRP CORP LTD

A method for predicting the corrosion level of vehicle parts in a corrosion test

The application discloses a kind of prediction methods of corrosion test vehicle parts corrosion grade, first combine the corrosion test data of vehicle parts with BP neural network method.The method is based on historical data and early test data, combined with the material type of target component, surface protection type, test duration and the corrosion grade of previous cycle, can quickly predict the corrosion grade of all subsequent cycles.The prediction method process includes: S1, data acquisition;S2, data preprocessing;S3, BP neural network construction;S4, model training optimization;S5, prediction output.Using the above method, the corrosion test cycle can be significantly shortened, and high-precision prediction support is provided for corrosion prevention process optimization and dynamic adjustment of test scheme.
Owner:HAINAN UNIV

Indoor simulation illumination test system of solar cell array

The invention discloses an indoor simulation illumination test system of a solar cell array. The test system comprises a user interaction module used for forming a human-computer interface and determining a test task according to user operation, and task parameters of the test task comprise a target illumination intensity set value, test duration, a sampling mode, a recording strategy and a safety threshold; the communication module is used for abstracting a physical device into an addressable device object and providing command issuing and data reading capabilities for the device object; the control module is used for calculating a control quantity according to the target illumination intensity set value and an actual measurement value of the illumination sensor, and converting the control quantity into a corresponding adjustment instruction to perform an illumination test; the data stream processing module is used for performing stream processing on measurement data and control data generated in the illumination test process; and the safety protection module is used for executing a protection action when the safety event is triggered.
Owner:SHANGHAI CO FLY TECH CO LTD

Test device and test method for heat output of heat pump water heater

A test device and test method for a heat output of a heat pump water heater. The device comprises: a water tank (5) water inlet temperature sensor (1) and a water tank (5) water outlet temperature sensor (2); a flow meter (3), which is provided on a refrigerant liquid return pipe (6) between a heat pump water heater main unit (4) and the water tank (5); a sampling tank (7), which is provided on the refrigerant liquid return pipe (6); a refrigerant pipe inlet-to-water-tank temperature sensor (11) and a refrigerant pipe outlet-from-water-tank temperature sensor (12); two pressure sensors; an electric heating tank (8), which is connected in series between the water inlet and the water outlet of the water tank (5); and a circulating water pump (9), which is connected in series between the electric heating tank (8) and the water tank (5). The power supply end of an electric heating element is connected to an electric energy meter. The technical problems in the prior art of test failure and increased test cost caused by failing to accurately control the test duration for a heat pump water heater and the average temperature of a water tank during heat pump water heater performance testing can be solved.
Owner:CQC INTIME TESTING TECH CO LTD

Device and method for measuring leakage rate of hydraulic heavy-load seal

The invention provides a hydraulic heavy-load sealing leakage rate measuring device and method, and belongs to the technical field of sealing element testing. The device aims at solving the problem that leakage rate measurement is not accurate under the heavy load and high pressure composite working condition. The device comprises a test tool for forming a sealing cavity, a hydraulic system for applying a normal load, a liquid supply system for providing a high-pressure medium, and a measurement module comprising a weighing device. The method comprises the steps of installing a sealing ring, applying a load and supplying a high-pressure medium, then collecting and weighing the mass of the leaked medium by using a weighing device, recording the test duration, and finally calculating the leakage rate according to the mass and the duration. The method can truly simulate harsh working conditions, adopts a mass method for direct measurement, is accurate and reliable in result, and gives consideration to both cost and automation degree.
Owner:BEIJING INST OF TECH

Vehicle-mounted assistant random test method, system, equipment and medium

The invention relates to a vehicle-mounted assistant random test method, system and device and a medium, and is applied to the technical field of riding test, and the method comprises the steps: obtaining test demand content in response to a test instruction of a worker; determining a target test event and a total event test duration based on the test demand content; determining an event weight ratio of the target test event based on the test demand content and the target test event; obtaining an event type of the target test event; determining a test time interval based on the event type and the total event test duration; generating a random test scheme based on the target test event, the total event test duration, the event weight ratio and the test time interval; and carrying out vehicle-mounted voice testing on a target vehicle based on the random testing scheme. The vehicle-mounted voice testing method and device have the effect of improving the comprehensiveness of vehicle-mounted voice testing.
Owner:深圳海冰科技有限公司

Sealing test device for photovoltaic cell string

The utility model discloses a sealing test device for a photovoltaic cell string, which comprises a transparent cover plate, a transparent bottom plate and two first clamping strips, the transparent cover plate and the transparent bottom plate are oppositely arranged, the transparent bottom plate is provided with a mounting groove for mounting the cell string, and the cell string comprises at least two cell pieces which are connected in sequence; each first clamping strip comprises an upper plate, a connecting plate and a lower plate which are connected in sequence, the upper plate, the connecting plate and the lower plate jointly define a first clamping groove, the transparent cover plate and the transparent bottom plate are clamped in the first clamping groove, and the two first clamping strips are oppositely arranged on the two sides of the transparent cover plate; an annular sealing piece is arranged between the transparent cover plate and the transparent bottom plate, and the projection of the mounting groove is located on the inner side of the projection of the annular sealing piece in the direction perpendicular to the upper surface of the transparent bottom plate, so that the test duration of the battery string can be shortened, and the test efficiency of the battery string is improved.
Owner:YANGZHOU XINRUI PHOTOELECTRIC TECH CO LTD