The invention discloses a tunnel mine drawing groove area equidistant sectoral hole arrangement blast construction method. The method comprises the steps of 1, designing a drawing, wherein blast holes are reasonably arranged according to the tunnel lithology grade and the tunnel blast design requirement, and an equidistant sectoral hole arrangement method is utilized to conduct CAD software drawing; 2, erecting an instrument and conducting surveying and lofting, wherein the drawing in the first step is utilized, a vertical line is made in the profile plane of the joint of the blast holes, a lofting rod or a ready-made anchor rod is arranged and fixed on the vertical line, and a nylon rope is hung and serves as a drill lofting line; 3, conducting drilling, wherein the drawing in the first step is utilized, and a drill reference point construction method is adopted to conduct construction; 4, conducting charge blast, wherein powder charging, blocking, blast network connection, alerting and blast initiating are conducted according to the designed detailed requirement for segmentation of the powder charge volume of each blast hole, and the powder charging structure. The tunnel mine drawing groove area equidistant sectoral hole arrangement blast construction method is easy to learn and operate, and hole arrangement and lofting on a palm mine drawing groove area are precisely conducted.