Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

43results about How to "Raise the level of lean" patented technology

Knowledge graph construction method for power grid main equipment

The invention discloses a knowledge graph construction method and device for power grid main equipment, and belongs to the technical field of power grid operation and inspection. Through continuous exploration and test, basic information, operation data and operation content of power grid main equipment are subjected to structured processing, knowledge triple extraction, ontology construction and knowledge graph completion and reasoning of the power grid main equipment are achieved through a system tool, and then a knowledge graph of the power grid main equipment is constructed; the method is suitable for the power grid equipment, can be applied to a power grid operation and maintenance management and control platform, can provide an auxiliary decision for operation and maintenance commanders, effectively improves the processing capability of personnel and equipment abnormality and faults, improves the quality and efficiency of knowledge analysis and processing of the power grid equipment, reduces the operation and maintenance cost of the power grid equipment, and improves the power transformation operation and maintenance efficiency. According to the invention, the knowledge mining capability and the intelligent analysis service capability of the equipment management business can be effectively improved, and the informatization and intelligence level project range of power grid operation and maintenance is comprehensively improved.
Owner:ELECTRIC POWER RES INST OF STATE GRID ZHEJIANG ELECTRIC POWER COMAPNY +1

Real-time power generation plan optimization method considering northern Shaanxi cascade section limit linkage adjustment

ActiveCN110363335AGuaranteed normal operationFully tap the consumption potentialForecastingResourcesNew energyPower grid
The invention discloses a real-time power generation plan optimization method considering northern Shaanxi cascade section limit linkage adjustment. The method comprises the following steps: based onvarious basic data of a real-time power generation plan, constructing a network-province two-stage real-time power generation plan coordination optimization model in a generalized tie line mode, and providing a unit initial plan value and a section initial tide value for joint optimization of the real-time power generation plan and Shaanbei cascade section limit. According to the method, based onvarious basic data of a real-time power generation plan, a unit initial plan and a section initial tidal current value, a real-time power generation plan optimization model considering northern Shaanxi cascade section limit linkage adjustment is constructed; an optimization target is introduced into the Shaanbei virtual subarea, so that the new energy wind curtailment amount is minimum; constraints such as a Shaanbei subarea cascade section and a the central Shaanxi plain subarea admitting ability are introduced into constraint conditions, combined optimization of unit output and stable section limits is achieved, the Shaanbei subarea new energy consumption potential of Shaanxi province is fully excavated, the utilization rate of the Shaanbei cascade section is increased, and the lean level of northwest regional power grid new energy scheduling is improved.
Owner:NARI TECH CO LTD +2

Construction method and air conditioner control method for multi-load joint control strategy

The invention discloses a construction method and an air conditioner control method for a multi-load joint control strategy, and belongs to the technical field of multi-load joint control strategies. According to an existing control strategy, flexible loads cannot be effectively scheduled and accurately controlled. According to the construction method for a multi-scene multi-load joint control strategy provided by the invention, multi-load response potentials are evaluated, and a reasonable power utilization plan is made according to load characteristics and market response characteristics represented by an evaluation result; a multi-micro-load aggregation model in multiple scenes is further established, and multi-load active response and coordinated optimization are achieved; and the multi-micro-load aggregation model in multiple scenes is used as a part of a combined optimization model of multi-micro-load regional operation scheduling, and multi-scene multi-load joint control is realized. Therefore, hierarchical flexible optimization operation and efficient scheduling of user-side multi-micro-loads are realized, and the dynamic balance capability of a power grid is improved.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER CO MARKETING SERVICE CENT +1

Work plan making method of engineering construction

The invention provides a work plan making method of engineering construction. The method comprises the following steps: S1: obtaining the name, the integral design data and the total construction period T of engineering; S2: according to the engineering management standardization manual of an industry, dividing the engineering into a plurality of subordinate construction periods according to a sequential order; S3: according to the working type and the workload of each subordinate construction period, generating the working time interval [tn, Tn] of each subordinate construction period, wherein tn is the minimum time limit of each subordinate construction period, Tn is the maximum time limit of each subordinate construction period, and n is the time sequencing of the subordinate construction period in the whole total construction period; and S4: according to a certain ratio, compressing the maximum time limit Tn of each subordinate construction period until the sum of the maximum time limits after all subordinate construction periods are compressed is equal to the preset total construction period T. By use of the method, the standardization management manual of the project department of a power grid enterprise owner is taken as a basis, a reasonable construction period is automatically generated by means including construction period key points, compression functions and the like, and a workload is effectively reduced.
Owner:RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER +1

Method for automatically identifying and docking fixed value setting system and relay protection information system

The invention relates to a method for automatically identifying and docking a fixed value setting system and a relay protection information system, aiming at automatically identifying and analyzing a fixed value file which is transmitted by the fixed value setting system, completing automatic docking with the relay protection information system, and eliminating wrong setting caused by manual operation and increasing the efficiency of fixed value input. The method realizes automatic docking between the fixed value setting system and the relay protection information system, based on the fixed value having a certain format and a naming method having a certain format, generates the only setting serial number for the fixed value files in the fixed value setting system and the relay protection information system, realizes matching between the fixed value setting system and the relay protection information system by matching the serial numbers, and based on the reason of the failure, generates a result file and return the result file to the fixed value setting system in situations when the two systems fail to conduct automatic docking. The method is easy and simple, greatly increases data exchange efficiency between the relay protection information system and the fixed value setting system, and reduces wrong setting caused by manual operation.
Owner:STATE GRID XINJIANG ELECTRIC POWER CORP +1

Computer-aided planning method based on three-layer planning model of power distribution network transition scheme

The invention discloses a computer-aided planning method based on a three-layer planning model of a power distribution network transition scheme, which adopts Matlab software as an operation platform,and comprises the following specific steps: 1, carrying out planning premise work, deeply investigating the site, the current situation and planning station and location, collecting data and collecting information; determining the boundary of the three-layer planning model of the power distribution network transition scheme for modeling and planning requirements; 2, creating and calculating an upper-layer planning model; 3, creating and calculating a middle-level planning model; 4, creating and calculating a lower-layer planning model; 5, integrating a transition net rack scheme; and establishing a transition net rack planning scheme in the planning stage. According to the method, a scientific, efficient, reasonable and ordered planning process can be provided for transition net rack planning, and safe, reliable, economical and reasonable transition from a power distribution network rack with increasingly large scale and increasingly complex elements to a target net rack is promoted.
Owner:SHANGHAI ELECTRIC POWER DESIGN INST

On-line checking method for a transformer substation equipment monitoring information table

The invention relates to the technical field of intelligent substations, in particular to an on-line checking method for a transformer substation equipment monitoring information table. The transformer substation equipment monitoring information table online checking method comprises four parts of version checking, checking record management, real-time checking and normativity and integrity checking. According to the transformer substation equipment monitoring information table on-line checking method, on-line editing, checking and releasing of the monitoring information table can be achieved,on-line editing, checking, approving, releasing and browsing of a new transformer substation monitoring information table are conducted, and flow on-line circulation is achieved; Version management of the monitoring information table can be realized, and the version number of the transformer substation equipment monitoring information table is managed; Check record management can be realized, interaction with real-time data in a regulation and control integrated system is realized, and name and time query and matching are performed on real-time alarm information, SOE records and the like; Real-time checking of the monitoring information table can be achieved, and original plant station or interval information is obtained and compared with a new monitoring information table for checking.
Owner:ZHAOTONG POWER SUPPLYING BUREAU OF YUNNAN POWER GRID

Power grid physical asset evaluation method based on regression fitting model

The invention relates to a power grid physical asset evaluation method based on a regression fitting model. The power grid physical asset evaluation method comprises the steps: obtaining the historical PMS data and ERP data of to-be-evaluated physical assets of a power grid, so as to build a physical asset data set; building an asset evaluation index system comprising four first-level evaluation indexes including a scale structure, utilization efficiency, a health level and retirement scrapping; in combination with the physical asset data set, calculating to obtain each evaluation index value;and according to the evaluation index value, fitting a relationship between the equipment defect rate and the equipment service age by adopting a regression method to obtain an equipment defect rateprediction value, and comparing the main transformer defect rate with the average load rate to obtain a healthy average load rate interval of the main transformer. Compared with the prior art, the power grid physical asset evaluation method establishes a physical asset evaluation index system with effective and reliable data, and can predict the equipment defect rate based on the regression fitting model while broadening the main transformer load analysis content, thus providing a powerful support for subsequent operation and maintenance work, and facilitating optimization of physical asset allocation.
Owner:STATE GRID ANHUI ELECTRIC POWER CO LTD +1

Power grid investment allocation processing method and apparatus

The invention provides a power grid investment allocation processing method and apparatus. The method comprises the steps of obtaining correlation degrees between power grid construction indexes and characterization indexes; according to the correlation degrees between the power grid construction indexes and the characterization indexes, and the weights of the characterization indexes, calculatingthe importance degrees of the power grid construction indexes; according to target values and current values of the power grid construction indexes, calculating the influence degrees of the power grid construction indexes; and according to the importance degrees of the power grid construction indexes and the influence degrees of the power grid construction indexes, determining an investment allocation ratio of the power grid construction indexes. According to the power grid investment allocation processing method and apparatus provided by the invention, a power grid investment allocation scheme can be determined according to the correlation degrees between the power grid construction indexes and the characterization indexes; and the lean level of power distribution network construction and the accuracy of power grid investment are effectively improved.
Owner:INST OF ECONOMIC & TECH STATE GRID HEBEI ELECTRIC POWER +2

Equipment state big data computing method and equipment based on Goldstein-BP algorithm

InactiveCN107886248AAchieve convergenceImprove the efficiency of status evaluationResourcesNeural learning methodsEvaluation resultMean square
The invention discloses an equipment state big data computing method based on a Goldstein-BP algorithm. The method comprises the steps that S101, historical data and current data of grid equipment state evaluation indexes and grid equipment historical state evaluation results are acquired; S102, a corresponding BP neural network model is constructed according to equipment state index historical data characteristics; S103, a mean square error function is constructed according to the historical data of the grid equipment state evaluation indexes and the grid equipment historical state evaluationresults; S104, a Goldstein method is adopted to obtain a minimum mean square error, a learning rate in the BP algorithm is solved, and BP neural network parameters are computed through the BP algorithm; S105, the BP neural network parameters are substituted to obtain a BP neural network model; and S106, current equipment state evaluation index data is used as input of the BP neural network modelto obtain an output result. Through the technical scheme, the Goldstein method is adopted to solve the optimal learning rate of the mean square error function in the BP algorithm, and therefore the precision level of grid equipment management is raised.
Owner:CHINA SOUTHERN POWER GRID COMPANY

Field inspection method of oil gas monitoring device based on comparison and analysis

InactiveCN107064468AImprove mobilityGet rid of the dilemma of not being able to send for inspectionMaterial testing goodsPower equipmentMeasurement precision
The invention discloses a field inspection method of an oil gas monitoring device based on comparison and analysis, and relates to the fields of power equipment state monitoring and fault diagnosis study and application. The existing industry lacks a method for detecting the technical indexes of measuring accuracy (repeatability and error) and the like of the oil gas monitoring device at field. The method comprises the following steps of connecting a detection device, treating transformer oil, standing the transformer oil, balancing the volume change of a transformer, utilizing a standard gas automatic metering instrument to obtain set standard mixed gas, injecting into a portable inspection instrument, magnetically stirring until the gas is fully dissolved, calculating the original concentration of the dissolved gas in the oil, and calculating the concentration of the dissolved gas in one special component of oil. The method has the advantages that the key problems of site, communication and time conditions in the traditional application mode are overcome; the maneuverability of quality control response of power equipment is improved; the comprehensive optimum effects of risk, efficiency and cost in power production are realized.
Owner:ELECTRIC POWER RES INST OF GUANGXI POWER GRID CO LTD

Photovoltaic access power distribution network adaptability evaluation method based on quantitative grading index system

The invention relates to a photovoltaic access power distribution network adaptability evaluation method based on a quantitative grading index system. The method comprises the following steps: step 1, collecting background information and historical data of various photovoltaic power supply power distribution networks accessed and involved in a target network frame of a to-be-evaluated power distribution network for analysis; step 2, extracting key indexes in four aspects of reliability, load rate, short-circuit current and electric energy quality, and constructing an adaptability evaluation system; step 3, performing adaptability evaluation on a distribution network system in a to-be-evaluated planning region by adopting an index score weighting method; step 4, carrying out layering and partitioning; step 5, carrying out regional power grid evaluation; step 6, calculating an adaptability score value of a regional power grid, and obtaining an adaptability evaluation result of the regional power grid according to the adaptability score; and step 7, judging whether photovoltaic access adaptability is possessed or not, and taking corresponding measures. The invention provides an effective tool for assisting planning personnel to reasonably consider installation scale of regional photovoltaics and development planning of a matched power grid.
Owner:国网河北省电力有限公司雄安新区供电公司 +2

Source network load storage simulation platform, method and system

The invention discloses a source network load storage simulation platform, method and system. The platform comprises: a test verification control module for controlling a test verification process; apower grid long-process analog simulation module for carrying out analog simulation on a power grid operation state; a comprehensive energy service provider used for collecting and concluding adjustment characteristic parameters of various resources managed by the comprehensive energy service provider and uploading the adjustment characteristic parameters to a load control main station; a load control main station used for aggregating multi-resource information and uploading the aggregated multi-resource information to a source network load storage collaborative real-time power control simulation module; the source network load storage collaborative real-time power control simulation module used for generating an adjustment strategy of each resource and issuing the adjustment strategy to the load control main station; and a source network load storage day-ahead planning simulation module used for generating planning data of the source network load storage collaborative real-time powercontrol simulation module. According to the invention, full-process and omnibearing source network load storage control simulation can be realized, and the reasonability of a day-ahead plan of the source network load storage and the safety of a source network load storage collaborative real-time power control strategy are ensured.
Owner:CHINA ELECTRIC POWER RES INST +2

Power distribution network investment demand determination method and device based on combined prediction, equipment and storage medium

The invention discloses a power distribution network investment demand determination method and device based on combined prediction, equipment and a storage medium. The method comprises the following steps: carding factors influencing the investment demand of a power distribution network based on a fishbone diagram method; based on a grey relational analysis model, screening factors to obtain key factors influencing the investment demand of the distribution network; obtaining medium and low voltage distribution network investment scale and key factor historical data; establishing a distribution network investment demand prediction model by using a support vector machine method, a linear regression method and a grey prediction method; and inputting the key factors, the medium and low voltage distribution network investment scale and the historical data of the key factors into the distribution network investment demand prediction model to obtain a prediction result. Through the above mode, the method can achieve the precise prediction of the investment demands of the medium and low voltage distribution network, and provides a decision basis for a power grid enterprise to improve the lean level of the investment of the distribution network.
Owner:GUANGDONG POWER GRID CO LTD

Equipment lightweight display system of power system BIM model

The invention discloses an equipment lightweight display system of an electric power system BIM model. The equipment lightweight display system comprises a three-dimensional construction module, a three-dimensional model import module, a calling module, a display module, an interaction module and a central processing module. According to the invention, establishment, import and display of the BIM equipment model in the power system can be realized, and interaction can be performed through the interaction module after display. The evaluation work management efficiency is greatly improved, deep analysis and comprehensive application of three-dimensional design result data are facilitated, the service requirements of three-dimensional design result evaluation of all levels of electric power companies of the state grid are met, and the application value of engineering data is effectively mined. According to the method, advanced technologies such as three-dimensional modeling and digital design are utilized, the problems and defects existing in three-dimensional review of the power transmission and transformation project are scientifically and effectively solved, the production efficiency is improved, the project cost and cost are saved, the informatization design review management capacity is improved, and the normalization, standardization and lean level of design review management is improved.
Owner:SHANGHAI JINQU INFORMATION TECH

Material quality detection intelligent management and control system based on ubiquitous electric power Internet of Things technology

The invention discloses a material quality detection intelligent management and control system based on a ubiquitous electric power Internet of Things technology, relates to the technical field of milling machine auxiliary tools, and solves the technical problems that, in the prior art, existing material quality detection management and control mainly depend on manual data acquisition, time consumption is long, and accuracy and fairness cannot be guaranteed. The material quality detection intelligent management and control system based on the ubiquitous electric power Internet of Things technology comprises: a material module, an intermediate unit, a mobile terminal, the ubiquitous electric power Internet of Things, an industrial personal computer, and a data memory, a production field alarm, a network communication module A, and a network communication module B which are in uniform signal connection with the industrial personal computer. Through a task driving mechanism, goods arrival, to-be-detected, detection, detection completion and return are covered, standardized process closed-loop management of material quality detection is realized, risks are reduced to an acceptable level, and habitual violation is avoided, so that the safety management level of material quality supervision work is greatly improved, and the pertinence, effectiveness, and reliability of the detection work are ensured.
Owner:STATE GRID HEILONGJIANG ELECTRIC POWER CO LTD ELECTRIC POWER RES INST +1

Method and system for detecting abnormal cause of line loss rate in public substation area

The invention relates to a public transformer station area line loss rate abnormity reason detection method and system. The method comprises steps that basic source data of a public transformer station area with line loss rate abnormity is acquired from a distribution network production system, an automatic metering system and a marketing system; one or more of the following items is analyzed for the public transformer station area with line loss rate abnormity according to the basic source data, including metering monitoring abnormity analysis, load rate analysis, power factor analysis, user CT saturation analysis, three-phase imbalance analysis and electricity stealing reason analysis; abnormity reasons of the public transformer station area with line loss rate abnormity are displayed on a display interface according to an analysis result. The method is advantaged in that through collecting data sources of the distribution network production system, the automatic metering system and the marketing system, the line loss rate abnormity reasons are analyzed and positioned through multiple analysis methods, the method is objective and real, line loss management personnel is efficiently facilitated to carry out more accurate abnormity determination, and thereby a line loss management lean level is improved.
Owner:GUANGDONG POWER GRID CO LTD INFORMATION CENT +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products