The invention provides concrete warehousing pouring construction equipment and method. A main winch of the construction equipment is connected with a vibration hopper lifting lug, an auxiliary winch is connected with a guide pipe valve, a clamp-on vibrator is mounted in a vibration hopper, a vibration hopper valve is connected with the lower end of the vibration hopper and connected with a guide pipe, the guide pipe is connected with the guide pipe valve, a concrete pump truck is connected with a concrete delivery pipe through a braided rubber tube, and an outlet end of the concrete delivery pipe is in butted joint with the vibration hopper. The construction method comprises steps as follows: (1), performing preparation of pre-construction; (2), enabling the equipment to be in place; (3),feeding the vibration hopper by the concrete pump truck; (4), pouring the concrete; (5), moving and adjusting positions of the vibration hopper and the guide pipe to finish concrete pouring. In the concrete pouring construction process of marine traffic engineering buildings, the problems of backward flowing and pipe blocking can be solved, the poured concrete quality is high, the construction efficiency is high, and environmental pollution is reduced.