The invention belongs to the field of gravel curtain layer reconstruction, and provides a gravel curtain layer
reconstruction method which comprises the steps of stripping, screening, storage, improvement, reconstruction, watering and maintenance, and further provides a soil-stone separation device used in the gravel curtain layer
reconstruction method, the soil-stone separation device comprises a separation tank, the top of the separation tank is open, a gravel flow guide bin covers the separation tank, and a
sieve plate is rotationally arranged in the separation tank; the
sieve plate is arranged in the separation tank and vibrates during rotation, the interior of the separation
pipe is divided into a screening bin and a soil receiving bin in an up-down corresponding mode through the
sieve plate, and the sieve plate can move upwards through a jacking mechanism so that the sieve plate can be moved out of the separation tank and separated objects can be thrown out all around through
centrifugal force. The damaged gravel curtain layer is reconstructed, a crust layer is formed below the gravel layer, the wind
erosion resistance can be greatly enhanced, it is guaranteed that strong wind
erosion can be effectively resisted for a long time, and meanwhile gravel and original gravel curtain layer soil can be rapidly separated and stacked in a high-quality mode in the gravel curtain layer reconstruction period.